ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Alarm Date: March 19, 2010Permit id: Ele2010-00212 | |||||
Upgrade electrical service and equipment to 200amp wiring a (2) two story addition to code requirement. Alternating a total of (7) circuits. Met with bge designer dept. For new service loop location on dwelling unit. Install (2) telephone and cable out Date: November 20, 2008Permit id: Com2008-31056 | |||||
Heating and cooling and duct work. Work as per code. Date: November 13, 2008 Value: $4,500Permit id: Com2008-29742 | |||||
Addition include kitchen bathroom powder room. Plumbing as per code. Date: November 13, 2008 Value: $5,500Permit id: Com2008-29743 | |||||
Add a x addition to rearof the house to include a basement first and second floors. First floor will include kitchen bathroom powder room and bedroom. Second floor is extension for master susite. Install hardwood floors in master suite fireplce Date: November 3, 2008 Value: $45,000Permit id: Com2008-29310 | |||||
Remove front porch. Removing a over head roof from over top of the front porch asper code. Date: October 5, 2007 Value: $600Permit id: Com2007-31054 | |||||
Add a x addition to rearof the house to include a basement first and second floors. First floor will include kitchen bathroom powder room and bedroom. Second floor is extension for master susite. Install hardwood floors in master suite fireplce bathroom his/her walk-in closet. Remove roof add new one and raise to create 30- space inside attic area for master suite/bath as per sketch as per code. Date: November 3, 2008 Value: $45,000Expiration date: May 3, 2009 | Permit id: Com2008-29310 | |||||
Upgrade electrical service and equipment to 200amp wiring a (2) two story addition to code requirement. Alternating a total of (7) circuits. Met with bge designer dept. For new service loop location on dwelling unit. Install (2) telephone and cable outlets as per code Date: November 20, 2008Expiration date: May 20, 2009 | Permit id: Com2008-31056 | |||||
Add a x addition to rearof the house to include a basement first and second floors. First floor will include kitchen bathroom powder room and bedroom. Second floor is extension for master susite. Install hardwood floors in master suite fireplce bathroom his her walk-in closet. Remove roof add new one and raise to create 30- space inside attic area for master suite bath as per sketch as per code. Date: November 3, 2008 Value: $45,000Expiration date: May 3, 2009 | Permit id: Com2008-29310 |