Construct 3 new art towers at different locations within the elephant exhibit, each tower is placed on a 64 sf concrete pad and is 30-3 tall Date: March 31, 2015Permit type: Application | Permit status: Approved | Completion date: December 18, 2014 | Permit id: 2014-251160-000 | |||||
Install ground ring for temporary stage towers (inspection) Date: January 13, 2015Permit type: Intake | Permit status: Closed | Completion date: January 13, 2015 | Permit id: 2015-104135-000 | |||||
Add new feeder and transformer for rooftop refrigeration equipment. Connect replacement equipment and walkins Date: January 26, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: March 6, 2015 | Permit id: 2015-107557-000 | |||||
Hazardous/tank-6 gal diesel fuel tank for new generator install Date: January 29, 2015Permit type: Intake | Permit status: Approved | Completion date: January 26, 2015 | Permit id: 2015-109694-000 | |||||
Controls work for all (3) building - controls - low volt - (3) low voltage Date: February 11, 2015Permit type: Intake | Permit status: Closed | Completion date: February 11, 2015 | Permit id: 2015-118406-000 | |||||
F1/ plans to follow; steller cove ozone project Date: February 25, 2015Permit type: Reviews | Permit status: Approved | Completion date: February 25, 2015 | Permit id: 2015-124864-000 | |||||
F1/ plans to follow; steller cove ozone project Permit type: Intake | Permit status: Closed | Completion date: February 25, 2015 | Permit id: 2015-124866-000 | |||||
Construct 2 large signs with footings for elephant lands exhibit area Date: May 8, 2015Permit type: Application | Permit status: Approved | Completion date: March 16, 2015 | Permit id: 2015-134224-000 | |||||
F3/ elevator renovation, hoistway, door control, new pit ladder, electrical, Date: March 17, 2015Permit type: Reviews | Permit status: Approved | Completion date: March 17, 2015 | Permit id: 2015-135445-000 | |||||
B2/ concert area, extend retaining wall, guard rail, irrigation, raise lawn level Date: March 19, 2015Permit type: Reviews | Permit status: Approved | Completion date: March 19, 2015 | Permit id: 2015-136913-000 | |||||
Plumbing renovationa at oregon zoo concert lawnadd drainage to grass area Permit type: Intake | Permit status: Closed | Completion date: March 25, 2015 | Permit id: 2015-139801-000 | |||||
F10/ install a replacement ozone system, new mechanical equipment, elec Date: March 25, 2015Permit type: Reviews | Permit status: Approved | Completion date: March 25, 2015 | Permit id: 2015-140236-000 | |||||
B2/ dfs for equipment holddowns Date: June 2, 2015Permit type: Intake | Permit status: Closed | Completion date: May 29, 2015 | Permit id: 2015-140237-Dfs | |||||
B2/ dfs of additional holdown detail at oxygen concentrator Date: June 12, 2015Permit type: Intake | Permit status: Closed | Completion date: June 4, 2015 | Permit id: 2015-140237-Dfs | |||||
B1/ predator building - demo storefront doors and replace with new cmu retaining wall, re-grade, modify storm drain(s) Date: March 30, 2015Permit type: Reviews | Permit status: Approved | Completion date: March 30, 2015 | Permit id: 2015-141688-000 | |||||
Run control conduit from water pump to pressurized hoses for the elephant bldg at the oregon zoo Date: April 2, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: April 29, 2015 | Permit id: 2015-144006-000 | |||||
Pwr - install a replacement ozone system, new mechanical equipment, elec - pwr Date: April 3, 2015Permit type: Intake | Permit status: Closed | Completion date: April 3, 2015 | Permit id: 2015-144885-000 | |||||
Africafe elevator upgrades- alteration to the fire alarms as needed for elevator upgrades- 4 devices3- smoke detectors1- heat detectors Date: April 8, 2015Permit type: Intake | Permit status: Closed | Completion date: April 8, 2015 | Permit id: 2015-146704-000 | |||||
Up date on the elevator equipment Date: April 8, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: April 20, 2015 | Permit id: 2015-146724-000 | |||||
Plumbing renovation at oregon zoo preditors building4 sd w/ perfpipe and 6 sd to drain to existing storm drain Permit type: Intake | Permit status: Closed | Completion date: April 10, 2015 | Permit id: 2015-147513-000 | |||||
F10/ roof replacement, chiller replacement Date: April 27, 2015Permit type: Reviews | Permit status: Approved | Completion date: April 27, 2015 | Permit id: 2015-159178-000 | |||||
F10/ chiller replacement Date: May 13, 2015Permit type: Intake | Permit status: Closed | Completion date: April 27, 2015 | Permit id: 2015-159191-000 | |||||
Hydraulic controls for asian elephant zoo project - (3) limited energy 1 hr. Investigation fee charged to this permit per 15-148291al Date: April 28, 2015Permit type: Intake | Permit status: Closed | Completion date: April 28, 2015 | Permit id: 2015-160221-000 | |||||
Pwr - roof replacement, electrical circuits for chiller replacement - pwr Permit type: Intake | Permit status: Closed | Completion date: April 30, 2015 | Permit id: 2015-162064-000 | |||||
B2/ concert platform/stage assembly Date: May 5, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 5, 2015 | Permit id: 2015-164855-000 | |||||
B2/ concert platform/stage assembly with steel stair Date: May 19, 2015Permit type: Intake | Permit status: Closed | Completion date: May 5, 2015 | Permit id: 2015-164858-000 | |||||
Site work for new oregon zoo education center. Demo 3 buildings (see separate permits),demo existing below grade utilities, install new storm infrastructure that extends down to hwy 26 and site prep for future buildings related to new education center. Permit type: Application | Permit status: Approved | Completion date: May 26, 2015 | Permit id: 2015-172517-Grd | |||||
Site work for new oregon zoo education center. Demo 3 buildings (see separate permits),demo existing below grade utilities, install new storm infrastructure that extends down to hwy 26 and site prep for future buildings related to new education center. Permit type: Issuance/intake | Permit status: Intake | Completion date: May 26, 2015 | Permit id: 2015-172517-Grd | |||||
Site work for new oregon zoo education center. Demo 3 buildings (see separate permits),demo existing below grade utilities, install new storm infrastructure that extends down to hwy 26 and site prep for future buildings related to new education center. Permit type: Process management | Permit status: Closed | Completion date: May 26, 2015 | Permit id: 2015-172517-Grd | |||||
Site work for new oregon zoo education center. Demo 3 buildings (see separate permits),demo existing below grade utilities, install new storm infrastructure that extends down to hwy 26 and site prep for future buildings related to new education center. Permit type: Life safety | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2015-172517-Grd | |||||
Site work for new oregon zoo education center. Demo 3 buildings (see separate permits),demo existing below grade utilities, install new storm infrastructure that extends down to hwy 26 and site prep for future buildings related to new education center. Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: June 10, 2015 | Permit id: 2015-172517-Grd | |||||
Site work for new oregon zoo education center. Demo 3 buildings (see separate permits),demo existing below grade utilities, install new storm infrastructure that extends down to hwy 26 and site prep for future buildings related to new education center. Permit type: Fire bureau | Permit status: Approved | Completion date: June 10, 2015 | Permit id: 2015-172517-Grd | |||||
Site work for new oregon zoo education center. Demo 3 buildings (see separate permits),demo existing below grade utilities, install new storm infrastructure that extends down to hwy 26 and site prep for future buildings related to new education center. Permit type: Transportation | Permit status: Not reqd | Completion date: June 23, 2015 | Permit id: 2015-172517-Grd | |||||
Site work for new oregon zoo education center. Demo 3 buildings (see separate permits),demo existing below grade utilities, install new storm infrastructure that extends down to hwy 26 and site prep for future buildings related to new education center. Permit type: Transportation | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2015-172517-Grd | |||||
Site work for new oregon zoo education center. Demo 3 buildings (see separate permits),demo existing below grade utilities, install new storm infrastructure that extends down to hwy 26 and site prep for future buildings related to new education center. Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 5, 2015 | Permit id: 2015-172517-Grd | |||||
Site work for new oregon zoo education center. Demo 3 buildings (see separate permits),demo existing below grade utilities, install new storm infrastructure that extends down to hwy 26 and site prep for future buildings related to new education center. Permit type: Parks bureau | Permit status: Approved | Completion date: June 11, 2015 | Permit id: 2015-172517-Grd | |||||
Demo restrooms by zoo train,1,315 sf. Remove all debris. Permit type: Application | Permit status: Approved | Completion date: May 26, 2015 | Permit id: 2015-172557-000 | |||||
Demo restrooms by zoo train,1,315 sf. Remove all debris. Permit type: Issuance/intake | Permit status: Intake | Completion date: May 26, 2015 | Permit id: 2015-172557-000 | |||||
Demo restrooms by zoo train,1,315 sf. Remove all debris. Permit type: Process management | Permit status: Closed | Completion date: May 26, 2015 | Permit id: 2015-172557-000 | |||||
Demo restrooms by zoo train,1,315 sf. Remove all debris. Permit type: Life safety | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2015-172557-000 | |||||
Demo restrooms by zoo train,1,315 sf. Remove all debris. Permit type: Fire bureau | Permit status: Approved | Completion date: June 10, 2015 | Permit id: 2015-172557-000 | |||||
Demo restrooms by zoo train,1,315 sf. Remove all debris. Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 4, 2015 | Permit id: 2015-172557-000 | |||||
Demo insect building, 2 sf. Remove all debris. Permit type: Application | Permit status: Approved | Completion date: May 26, 2015 | Permit id: 2015-172568-000 | |||||
Demo insect building, 2 sf. Remove all debris. Permit type: Issuance/intake | Permit status: Intake | Completion date: May 26, 2015 | Permit id: 2015-172568-000 | |||||
Demo insect building, 2 sf. Remove all debris. Permit type: Process management | Permit status: Closed | Completion date: May 26, 2015 | Permit id: 2015-172568-000 | |||||
Demo insect building, 2 sf. Remove all debris. Permit type: Life safety | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2015-172568-000 | |||||
Demo insect building, 2 sf. Remove all debris. Permit type: Fire bureau | Permit status: Approved | Completion date: June 10, 2015 | Permit id: 2015-172568-000 | |||||
Demo insect building, 2 sf. Remove all debris. Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 4, 2015 | Permit id: 2015-172568-000 | |||||
Demo lorikeet keeper building, 3 sf. Remove all debris Permit type: Application | Permit status: Approved | Completion date: May 26, 2015 | Permit id: 2015-172575-000 | |||||
Demo lorikeet keeper building, 3 sf. Remove all debris Permit type: Issuance/intake | Permit status: Intake | Completion date: May 26, 2015 | Permit id: 2015-172575-000 | |||||
Demo lorikeet keeper building, 3 sf. Remove all debris Permit type: Process management | Permit status: Closed | Completion date: May 26, 2015 | Permit id: 2015-172575-000 | |||||
Demo lorikeet keeper building, 3 sf. Remove all debris Permit type: Life safety | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2015-172575-000 | |||||
Demo lorikeet keeper building, 3 sf. Remove all debris Permit type: Fire bureau | Permit status: Approved | Completion date: June 10, 2015 | Permit id: 2015-172575-000 | |||||
Demo lorikeet keeper building, 3 sf. Remove all debris Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 4, 2015 | Permit id: 2015-172575-000 | |||||
B1/ add new storm catch basin to low point of the cascades building path Date: June 1, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 1, 2015 | Permit id: 2015-178181-000 | |||||
B1/ plumbing renovation at oregon zoo to add 2 catch basins Date: June 3, 2015Permit type: Intake | Permit status: Closed | Completion date: June 3, 2015 | Permit id: 2015-179759-000 | |||||
Replace (2) existing antennas with (2) new antennas; add ancillary equipment on existing utility pole Permit type: Application | Permit status: Approved | Completion date: June 3, 2015 | Permit id: 2015-180141-000 | |||||
Replace (2) existing antennas with (2) new antennas; add ancillary equipment on existing utility pole Permit type: Issuance/intake | Permit status: Intake | Completion date: June 3, 2015 | Permit id: 2015-180141-000 | |||||
Replace (2) existing antennas with (2) new antennas; add ancillary equipment on existing utility pole Permit type: Addressing | Permit status: Not reqd | Completion date: June 4, 2015 | Permit id: 2015-180141-000 | |||||
Replace (2) existing antennas with (2) new antennas; add ancillary equipment on existing utility pole Permit type: Erosion control | Permit status: Not reqd | Completion date: June 4, 2015 | Permit id: 2015-180141-000 | |||||
Replace (2) existing antennas with (2) new antennas; add ancillary equipment on existing utility pole Permit type: Life safety | Permit status: Approved | Completion date: June 3, 2015 | Permit id: 2015-180141-000 | |||||
Replace (2) existing antennas with (2) new antennas; add ancillary equipment on existing utility pole Permit type: Life safety | Permit status: Not reqd | Completion date: June 3, 2015 | Permit id: 2015-180141-000 | |||||
Replace (2) existing antennas with (2) new antennas; add ancillary equipment on existing utility pole Permit type: Structural | Permit status: Approved | Completion date: June 16, 2015 | Permit id: 2015-180141-000 | |||||
Replace (2) existing antennas with (2) new antennas; add ancillary equipment on existing utility pole Permit type: Fire bureau | Permit status: Approved | Completion date: June 29, 2015 | Permit id: 2015-180141-000 | |||||
Replace (2) existing antennas with (2) new antennas; add ancillary equipment on existing utility pole Permit type: Environmental services | Permit status: Not reqd | Completion date: June 4, 2015 | Permit id: 2015-180141-000 | |||||
Replace (2) existing antennas with (2) new antennas; add ancillary equipment on existing utility pole Permit type: Transportation | Permit status: Not reqd | Completion date: June 3, 2015 | Permit id: 2015-180141-000 | |||||
Replace (2) existing antennas with (2) new antennas; add ancillary equipment on existing utility pole Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 4, 2015 | Permit id: 2015-180141-000 | |||||
Replace (2) existing antennas with (2) new antennas; add ancillary equipment on existing utility pole Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 5, 2015 | Permit id: 2015-180141-000 | |||||
New service road and retaining walls (separate mechanical permit required for gas piping.) Date: March 27, 2013Permit type: Application | Permit status: Approved | Completion date: October 12, 2012 | Permit id: 2012-191660-000 | |||||
New 185 sf viewing structure Date: May 7, 2013Permit type: Application | Permit status: Approved | Completion date: December 28, 2012 | Permit id: 2012-219450-000 | |||||
3 year request for oregon zoo summer concert series for summer 2013 - 2015 Date: January 20, 2015Permit type: Intake | Permit status: Complete | Completion date: March 13, 2013 | Permit id: 2013-124465-000 | |||||
Lucs for zoo Permit type: Land use review | Permit status: Closed | Completion date: September 2, 2014 | Permit id: 2013-127564-000 | |||||
Lucs for zoo Permit type: Land use review | Permit status: Letter sent | Completion date: September 2, 2014 | Permit id: 2013-127564-000 | |||||
1111 feet of sanitary sewer and 2456 feet of storm sewer; all on property 8/29/13 add 25 feet of fire water line / add 2 of storm sewer 7/17/14 Date: June 5, 2013Permit type: Intake | Permit status: Closed | Completion date: June 5, 2013 | Permit id: 2013-164331-000 | |||||
Extend existing elevated loading dock 1500sf in preparation for mechanical equipment installation (thru facilities program) add bioswale and related sitework Date: July 26, 2013Permit type: Application | Permit status: Approved | Completion date: June 13, 2013 | Permit id: 2013-167641-000 | |||||
Dfs for guardrails. Date: February 12, 2014Permit type: Application | Permit status: Approved | Completion date: September 11, 2013 | Permit id: 2013-167641-Dfs | |||||
New elephant building and associated site work Date: November 1, 2013Permit type: Application | Permit status: Approved | Completion date: June 24, 2013 | Permit id: 2013-171122-000 | |||||
Dfs for shotcrete / soil nails Date: July 31, 2014Permit type: Application | Permit status: Approved | Completion date: May 8, 2014 | Permit id: 2013-171122-Dfs | |||||
Dfs-stairs and railing sto4a,sto2a,sto6a Date: July 8, 2014Permit type: Application | Permit status: Approved | Completion date: June 18, 2014 | Permit id: 2013-171122-Dfs | |||||
Dfs for steel joists Date: July 8, 2014Permit type: Application | Permit status: Approved | Completion date: June 25, 2014 | Permit id: 2013-171122-Dfs | |||||
Dfs for stairs and railing Date: July 8, 2014Permit type: Application | Permit status: Approved | Completion date: June 25, 2014 | Permit id: 2013-171122-Dfs | |||||
Dfs -pool wall, bottom shot crete Date: August 8, 2014Permit type: Application | Permit status: Approved | Completion date: July 2, 2014 | Permit id: 2013-171122-Dfs | |||||
Dfs for skylights Date: August 26, 2014Permit type: Application | Permit status: Approved | Completion date: July 21, 2014 | Permit id: 2013-171122-Dfs | |||||
Dfs for mse retaining wall from service rd sta 27 09 to 27 42 - see 13-171122-rev-01-co. Permit type: Application | Permit status: Approved w/ cond | Completion date: October 10, 2014 | Permit id: 2013-171122-Dfs | |||||
Dfs for mse retaining wall from service rd sta 27 09 to 27 42 - see 13-171122-rev-01-co. Permit type: Issuance/intake | Permit status: Intake | Completion date: November 4, 2014 | Permit id: 2013-171122-Dfs | |||||
Dfs for mse retaining wall from service rd sta 27 09 to 27 42 - see 13-171122-rev-01-co. Permit type: Process management | Permit status: Closed | Completion date: January 5, 2015 | Permit id: 2013-171122-Dfs | |||||
Dfs for glass block Date: January 23, 2015Permit type: Application | Permit status: Approved | Completion date: October 13, 2014 | Permit id: 2013-171122-Dfs | |||||
Dfs for metal wall panels Date: January 23, 2015Permit type: Application | Permit status: Approved | Completion date: October 13, 2014 | Permit id: 2013-171122-Dfs | |||||
Dfs for aluminum windows, glass guardrail and curtainwall Date: March 12, 2015Permit type: Application | Permit status: Approved | Completion date: January 6, 2015 | Permit id: 2013-171122-Dfs | |||||
Dfs for stairs and railing Date: March 26, 2015Permit type: Application | Permit status: Approved | Completion date: January 23, 2015 | Permit id: 2013-171122-Dfs | |||||
Seismic bracing for conduit racks, generator and pole bases Date: February 27, 2015Permit type: Application | Permit status: Approved | Completion date: February 4, 2015 | Permit id: 2013-171122-Dfs | |||||
Dfs for ceilings metal stud Date: March 13, 2015Permit type: Application | Permit status: Approved | Completion date: March 4, 2015 | Permit id: 2013-171122-Dfs | |||||
Dfs - ultra block wall Permit type: Application | Permit status: Approved | Completion date: June 1, 2015 | Permit id: 2013-171122-Dfs | |||||
Dfs - ultra block wall Permit type: Issuance/intake | Permit status: Intake | Completion date: June 1, 2015 | Permit id: 2013-171122-Dfs | |||||
Dfs - ultra block wall Permit type: Process management | Permit status: Closed | Completion date: June 1, 2015 | Permit id: 2013-171122-Dfs | |||||
Dfs - ultra block wall Permit type: Process management | Permit status: Closed | Completion date: June 25, 2015 | Permit id: 2013-171122-Dfs | |||||
Dfs - ultra block wall Permit type: Planning and zoning | Permit status: Not reqd | Completion date: June 24, 2015 | Permit id: 2013-171122-Dfs | |||||
Dfs - ultra block wall Permit type: Life safety | Permit status: Approved | Completion date: June 2, 2015 | Permit id: 2013-171122-Dfs | |||||
Dfs - ultra block wall Permit type: Structural | Permit status: Approved | Completion date: June 12, 2015 | Permit id: 2013-171122-Dfs | |||||
Revisions - change to add two geothermal french drain lines Date: July 10, 2014Permit type: Application | Permit status: Approved | Completion date: March 12, 2014 | Permit id: 2013-171122-Rev | |||||
Revisions - revise grading and drainage at north side of lss building to expand drivable surface. Relocate storm facility and replace with permeable paving. Date: March 31, 2015Permit type: Application | Permit status: Approved | Completion date: October 1, 2014 | Permit id: 2013-171122-Rev | |||||
Revisions - relocate rooftop pv panels Date: January 28, 2015Permit type: Application | Permit status: Approved | Completion date: October 31, 2014 | Permit id: 2013-171122-Rev | |||||
Hrus, two condensing boilers, two 45-ton wshps, misc pumps, radiant heaters, plans w/co Date: November 1, 2013Permit type: Intake | Permit status: Closed | Completion date: June 27, 2013 | Permit id: 2013-171124-000 | |||||
New 2535 sf life support systems equipment building Date: November 1, 2013Permit type: Application | Permit status: Approved | Completion date: June 24, 2013 | Permit id: 2013-171125-000 | |||||
Dfs - interior stairs Date: December 3, 2014Permit type: Application | Permit status: Approved | Completion date: January 14, 2014 | Permit id: 2013-171125-Dfs | |||||
Dfs for lss equipment seismic calculations Date: December 3, 2014Permit type: Application | Permit status: Approved | Completion date: November 10, 2014 | Permit id: 2013-171125-Dfs | |||||
New 1684 sf building containing public restrooms and catering kitchen Date: November 1, 2013Permit type: Application | Permit status: Approved w/ cond | Completion date: June 24, 2013 | Permit id: 2013-171127-000 | |||||
Dfs for east hub aluminum windows Date: March 12, 2015Permit type: Application | Permit status: Approved | Completion date: January 6, 2015 | Permit id: 2013-171127-Dfs | |||||
Dfs-gabian basket wall Permit type: Application | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2013-171127-Dfs | |||||
Dfs-gabian basket wall Permit type: Issuance/intake | Permit status: Intake | Completion date: July 1, 2015 | Permit id: 2013-171127-Dfs | |||||
Wall heaters and misc exhausts, plans w/co Date: November 1, 2013Permit type: Intake | Permit status: Closed | Completion date: June 27, 2013 | Permit id: 2013-171128-000 | |||||
New trestle, retaining walls, guardrails and fences and realign train track Date: January 24, 2014Permit type: Application | Permit status: Approved | Completion date: September 17, 2013 | Permit id: 2013-206130-000 | |||||
B1/ commissary building remodel - rev-01 add walls for office in the workroom area Date: November 15, 2013Permit type: Intake | Permit status: Closed | Completion date: November 6, 2013 | Permit id: 2013-207043-Rev | |||||
B1/ commissary building new exterior walk-in cooler & freezer (see 13-167641-co for new loading dock & site work) Date: September 30, 2013Permit type: Intake | Permit status: Closed | Completion date: September 19, 2013 | Permit id: 2013-207076-000 | |||||
Replace existing emergncy generator with new; expand generator pad; new cmu site walls Date: October 3, 2013Permit type: Application | Permit status: Approved | Completion date: October 1, 2013 | Permit id: 2013-211382-000 | |||||
Electrical for new asian elephant habitat Date: December 27, 2013Permit type: Intake | Permit status: Closed | Completion date: October 3, 2013 | Permit id: 2013-212669-000 | |||||
Revision: asi #35-added electrical equipment to create life safety and optional standby distribution system. Date: February 25, 2015Permit type: Intake | Permit status: Closed | Completion date: February 11, 2015 | Permit id: 2013-212669-Rev | |||||
Demolish elephant building Date: November 1, 2013Permit type: Application | Permit status: Approved | Completion date: October 8, 2013 | Permit id: 2013-213243-000 | |||||
Demolish elephant maintenance building Date: November 1, 2013Permit type: Application | Permit status: Approved | Completion date: October 8, 2013 | Permit id: 2013-213244-000 | |||||
Demolish elephant museum Date: November 1, 2013Permit type: Application | Permit status: Approved | Completion date: October 8, 2013 | Permit id: 2013-213245-000 | |||||
New pedestrian bridge Date: November 1, 2013Permit type: Application | Permit status: Approved | Completion date: October 14, 2013 | Permit id: 2013-213247-000 | |||||
Dfs for precast bridge planks Date: October 28, 2014Permit type: Application | Permit status: Approved | Completion date: September 24, 2014 | Permit id: 2013-213247-Dfs | |||||
Dfs for attachment of mechanical equipment Permit type: Application | Permit status: Approved | Completion date: March 31, 2015 | Permit id: 2013-213247-Dfs | |||||
Dfs for attachment of mechanical equipment Permit type: Issuance/intake | Permit status: Intake | Completion date: March 31, 2015 | Permit id: 2013-213247-Dfs | |||||
Dfs for attachment of mechanical equipment Permit type: Life safety | Permit status: Approved | Completion date: May 7, 2015 | Permit id: 2013-213247-Dfs | |||||
North meadow shade structure Date: November 1, 2013Permit type: Application | Permit status: Approved | Completion date: October 14, 2013 | Permit id: 2013-213249-000 | |||||
Equipment shelter 1,258 sf Date: November 1, 2013Permit type: Application | Permit status: Approved | Completion date: October 8, 2013 | Permit id: 2013-213250-000 | |||||
Install (3) temp service/feeders 2 amp in oregon zoo asian elephant habitat Date: October 8, 2013Permit type: Intake | Permit status: Closed | Completion date: October 8, 2013 | Permit id: 2013-214190-000 | |||||
F1/demo band stage; remove trees, cap utilities, clearing and grubbing, sedimentation control, etc Date: October 29, 2013Permit type: Intake | Permit status: Closed | Completion date: October 9, 2013 | Permit id: 2013-214553-000 | |||||
Re-install two refurbished totem poles previously on-site in different locations; one at tall, one at 15 tall Date: October 15, 2013Permit type: Application | Permit status: Approved | Completion date: October 15, 2013 | Permit id: 2013-216523-000 | |||||
Plumbing renovation at oregon zoo demo storm drain at stage area and protect catch basins with silt traps Date: September 9, 2014Permit type: Intake | Permit status: Closed | Completion date: October 18, 2013 | Permit id: 2013-218754-000 | |||||
Hdpe piping, equipment and pumps per ls drawings/ls Date: November 15, 2013Permit type: Intake | Permit status: Closed | Completion date: November 15, 2013 | Permit id: 2013-228485-000 | |||||
Demo band stage; remove trees, cap utilities, clearing and grubbing, sedimentation control, etc (phone & speakers)pr# zvs 10 Date: September 4, 2014Permit type: Intake | Permit status: Closed | Completion date: November 23, 2013 | Permit id: 2013-231737-000 | |||||
Elec: forest hall and n/s habitat Date: December 27, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: February 9, 2015 | Permit id: 2013-241908-000 | |||||
Interior plumbing work Date: February 12, 2014Permit type: Intake | Permit status: Closed | Completion date: January 9, 2014 | Permit id: 2014-102797-000 | |||||
Plumbing work Date: February 12, 2014Permit type: Intake | Permit status: Closed | Completion date: January 9, 2014 | Permit id: 2014-102800-000 | |||||
Plumbing work (85) fixtures Date: February 12, 2014Permit type: Intake | Permit status: Closed | Completion date: January 9, 2014 | Permit id: 2014-102836-000 | |||||
New canopy structure at zoo, 6 footings, associated site work Date: December 19, 2014Permit type: Application | Permit status: Approved | Completion date: April 9, 2014 | Permit id: 2014-138009-000 | |||||
Install 82 of storm sewer on property and (1) catch basin. Date: May 6, 2014Permit type: Intake | Permit status: Closed | Completion date: May 6, 2014 | Permit id: 2014-153322-000 | |||||
Oregon zoo train relocation. Date: May 12, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: November 4, 2014 | Permit id: 2014-155730-000 | |||||
Demolition of parking shack and appurtenances that are no longer needed remove median and repave to match existing grade Date: July 15, 2014Permit type: Application | Permit status: Approved | Completion date: May 29, 2014 | Permit id: 2014-162490-000 | |||||
Complaint - the structure is the concert stage and structural canopy. The structures were installed over two weeks ago permit/case number 2014-138009-000-00-co - under review (not sure if related) Permit type: Request | Permit status: Closed | Completion date: May 4, 2015 | Permit id: 2014-176365-000 | |||||
Complaint - the structure is the concert stage and structural canopy. The structures were installed over two weeks ago permit/case number 2014-138009-000-00-co - under review (not sure if related) Permit type: Under inspection | Permit status: In progress | Completion date: September 5, 2014 | Permit id: 2014-176365-000 | |||||
Complaint - the structure is the concert stage and structural canopy. The structures were installed over two weeks ago permit/case number 2014-138009-000-00-co - under review (not sure if related) Permit type: Enforcement | Permit status: Closed | Completion date: December 20, 2014 | Permit id: 2014-176365-000 | |||||
Fire sprinkler - new wet/dry auto sprinkler system in new zoo elephant habitat. Date: September 22, 2014Permit type: Intake | Permit status: Approved | Completion date: September 2, 2014 | Permit id: 2014-206826-000 | |||||
F17/ hay barn retrofit, reinforce interior walls in the existing hay storage building for temporary elephant housing Date: September 23, 2014Permit type: Reviews | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-216283-000 | |||||
Replace multi zoned condenser with gas splits: one 1. 5t, one 2t, one 2. 5t, two 3. 5t and two 4t this building is not part of facilities permit program Date: October 7, 2014Permit type: Intake | Permit status: Closed | Completion date: October 3, 2014 | Permit id: 2014-217714-000 | |||||
Demo existing two furnaces, install one 15 ton roof top unit with ductwork Date: September 30, 2014Permit type: Intake | Permit status: Closed | Completion date: September 30, 2014 | Permit id: 2014-219452-000 | |||||
Install (2) inverters, conduit and wire to main panel on 1st leve, install amp 3 pole breaker and terminate to that. Date: October 22, 2014Permit type: Intake | Permit status: Closed | Completion date: October 7, 2014 | Permit id: 2014-222443-000 | |||||
Alarm - fire alarm and emergency communications system for the east hub of elephant exhibit Date: November 18, 2014Permit type: Intake | Permit status: Approved | Completion date: October 9, 2014 | Permit id: 2014-223257-000 | |||||
Alarm - fire alarm and emergency communications system for the main building of asian elephant exhibit Date: November 18, 2014Permit type: Intake | Permit status: Approved | Completion date: October 9, 2014 | Permit id: 2014-223265-000 | |||||
Alarm - fire alarm and emergency communications system for the lss building @ elephant exhibit Date: November 18, 2014Permit type: Intake | Permit status: Approved | Completion date: October 9, 2014 | Permit id: 2014-223267-000 | |||||
Underground - install 62 of underground fire line for new main elephant bldg Date: December 17, 2014Permit type: Intake | Permit status: Approved | Completion date: October 22, 2014 | Permit id: 2014-228958-000 | |||||
Investigate possible tree code violation Permit type: E - code compliance | Permit status: Violation found/low limbs | Completion date: July 31, 2015 | Permit id: 2015-208516-000 | |||||
Nest building - mechanical system is a chilled water/hot water hydronic central system with radiant floor piping and fan coil units. Plans w/co Date: January 5, 2016Permit type: Intake | Permit status: Closed | Completion date: September 1, 2015 | Permit id: 2015-215623-000 | |||||
Zoo education center - classroom building - 48 sf Date: January 5, 2016Permit type: Application | Permit status: Approved | Completion date: September 1, 2015 | Permit id: 2015-215628-000 | |||||
975 sf tent storage and deck Date: January 5, 2016Permit type: Application | Permit status: Approved | Completion date: September 1, 2015 | Permit id: 2015-215654-000 | |||||
2 sf - back yard shelter in the backyard habitiat area Date: January 5, 2016Permit type: Application | Permit status: Approved | Completion date: September 1, 2015 | Permit id: 2015-215658-000 | |||||
201 sf trash enclosure for the zoo education center Date: January 5, 2016Permit type: Application | Permit status: Approved | Completion date: September 1, 2015 | Permit id: 2015-215661-000 | |||||
Ticket booth for train ticket sales Date: January 5, 2016Permit type: Application | Permit status: Approved | Completion date: September 1, 2015 | Permit id: 2015-215671-000 | |||||
New ticket booth contains small condenser and fan coil unit Date: January 5, 2016Permit type: Intake | Permit status: Closed | Completion date: September 1, 2015 | Permit id: 2015-215673-000 | |||||
14 sf train platform is the entry/exit point for the zoo train Date: January 5, 2016Permit type: Application | Permit status: Approved | Completion date: September 1, 2015 | Permit id: 2015-215677-000 | |||||
Classroom building mechanical system, heat recovery ventilator system vrf units. Date: January 5, 2016Permit type: Intake | Permit status: Closed | Completion date: September 1, 2015 | Permit id: 2015-215961-000 | |||||
Zoos train station - small a/c Date: January 5, 2016Permit type: Intake | Permit status: Closed | Completion date: September 1, 2015 | Permit id: 2015-215967-000 | |||||
B2/ treetops, exterior wall repair of water damage, siding, framing Date: September 3, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 3, 2015 | Permit id: 2015-231362-000 | |||||
Add 200a and 100a temp panel Date: September 17, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: October 1, 2015 | Permit id: 2015-237859-000 | |||||
9-18-15 kc - received complaint regarding construction activities, including back up beepers, at 5: am. Audible in home with doors and windows closed. Permit type: Request | Permit status: Closed | Completion date: September 18, 2015 | Permit id: 2015-238899-000 | |||||
B2/ rtu, (hoof stock) air handler replacement, same location Date: October 20, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 20, 2015 | Permit id: 2015-253129-000 | |||||
Summer events with amplified sound on stage Date: January 6, 2016Permit type: Intake | Permit status: Complete | Completion date: October 20, 2015 | Permit id: 2015-253615-000 | |||||
Add 2 amp temp service for transformer Date: October 21, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: October 23, 2015 | Permit id: 2015-254362-000 | |||||
Plumbing renovation at oregon zoo train depot1- sink, 1- wc, 1- fd Date: October 23, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 23, 2015 | Permit id: 2015-255649-000 | |||||
Storm only: 107ft of 12 pvc storm (ank724-ank723) along north curb line (aprox. 10ft deep). Contractor to construct new 21 branch to ank723. Contractor to make new tap to manhole, verify mh location and depth. Date: October 26, 2015Permit type: Intake | Permit status: Closed | Completion date: October 26, 2015 | Permit id: 2015-256093-000 | |||||
Installation of 2048 storm pipe/mhs/cleanout. Installation of 496 of sewer pipe. See 15-215628 co/ add (3) hose bib & (2) int/gt 12/14/15 Date: October 26, 2015Permit type: Intake | Permit status: Closed | Completion date: October 26, 2015 | Permit id: 2015-256133-000 | |||||
Pwr - rtu, (hoof stock) air handler replacement - pwr Permit type: Intake | Permit status: Closed | Completion date: November 16, 2015 | Permit id: 2015-265541-000 | |||||
Ground up education center and train platform Date: January 14, 2016Permit type: Intake | Permit status: Closed | Completion date: December 14, 2015 | Permit id: 2015-276759-000 | |||||
Underground - installation of 60lf 4 fdc line, 182 lf of 6 fdc, (1) fdc vault, (1) 4 fdc standpipe Date: January 19, 2016Permit type: Intake | Permit status: Approved | Completion date: December 18, 2015 | Permit id: 2015-279339-000 | |||||
B1/ colobus - replace gas heater Date: January 7, 2016Permit type: Reviews | Permit status: Approved | Completion date: January 7, 2016 | Permit id: 2016-102054-000 | |||||
Classroom & cafe building bathroom, sink, kitchen plumbing & fixtures. Date: January 14, 2016Permit type: Intake | Permit status: Closed | Completion date: January 14, 2016 | Permit id: 2016-105768-000 | |||||
Install ft of underground gas pipe for food carts Date: March 7, 2016Permit type: Intake | Permit status: Closed | Completion date: March 7, 2016 | Permit id: 2016-131389-000 | |||||
Sprinkler - installation of wet sprinkler system inside the bldg and dry system to protect combustible exterior spaces Permit type: Intake | Permit status: Approved | Completion date: March 22, 2016 | Permit id: 2016-138365-000 | |||||
Sprinkler - installation of wet sprinkler system inside the bldg and dry system to protect combustible exterior spaces Permit type: Intake | Permit status: Closed | Completion date: March 22, 2016 | Permit id: 2016-138365-000 | |||||
Sprinkler - installation of wet sprinkler system inside the building and dry sprinkler system to protect combustible exterior spaces Permit type: Intake | Permit status: Approved | Completion date: March 22, 2016 | Permit id: 2016-138367-000 | |||||
Sprinkler - installation of wet sprinkler system inside the building and dry sprinkler system to protect combustible exterior spaces Permit type: Intake | Permit status: Closed | Completion date: March 22, 2016 | Permit id: 2016-138367-000 | |||||
Install new outdoor sculpture at the front of the education center Date: March 30, 2016Permit type: Application | Permit status: Approved | Completion date: March 30, 2016 | Permit id: 2016-142573-000 | |||||
- provide and install new power and data as detailed on drawing for new tuff shed located near the elephant exhibit Date: March 31, 2016Permit type: Electrical inspections | Permit status: Approved | Completion date: April 5, 2016 | Permit id: 2016-143588-000 | |||||
Alarm-fire alarm for new oregon zoo education building coverage. Date: April 22, 2016Permit type: Intake | Permit status: Approved | Completion date: April 8, 2016 | Permit id: 2016-147319-000 | |||||
Alarm-fire alarm for new oregon zoo education building Permit type: Intake | Permit status: Approved | Completion date: April 8, 2016 | Permit id: 2016-147324-000 | |||||
Alarm-fire alarm for new oregon zoo education building Permit type: Intake | Permit status: Closed | Completion date: April 8, 2016 | Permit id: 2016-147324-000 | |||||
Ckt for humidifierfaxed Date: May 24, 2012Permit type: Intake | Permit status: Closed | Completion date: May 24, 2012 | Permit id: 2012-144072-000 | |||||
Extend ckt for hvac controller at penguin habitat-see commentfaxed Date: August 20, 2012Permit type: Intake | Permit status: Closed | Completion date: August 20, 2012 | Permit id: 2012-164121-000 | |||||
Dfs for h-pile tieback design Date: August 8, 2013Permit type: Application | Permit status: Approved | Completion date: June 20, 2013 | Permit id: 2012-191660-Dfs | |||||
Revision - change grades and add extension to existing retaining wall at predator building. Add not an exit at doors leading to exterior enclosed area. Date: June 19, 2013Permit type: Application | Permit status: Approved | Completion date: April 11, 2013 | Permit id: 2012-191660-Rev | |||||
Revision - addition of horizontal drains under the road to dewater and provide improved slope stability under the future elephant buildings. Date: June 19, 2013Permit type: Application | Permit status: Approved | Completion date: May 8, 2013 | Permit id: 2012-191660-Rev | |||||
Revision - add stormwater outfall Date: September 6, 2013Permit type: Application | Permit status: Approved | Completion date: August 27, 2013 | Permit id: 2012-191660-Rev | |||||
Revision - revised tie-back loads at soldier pile wall c; ccd#9: modification at equipment shelter; ccd#12: tanner creek piping realignment: ccd #13 elimination of retaining wall at spur road that was approved under revision 01. Date: December 26, 2013Permit type: Application | Permit status: Approved | Completion date: November 18, 2013 | Permit id: 2012-191660-Rev | |||||
Revision - service road. This is the same change as the equipment shelter (see 13-171122 rev 03 co) but since part of the foundation work was included in the service road package, the revision effects this permit as well. Also includes the retaining wall location has shifted and length increased, hydraulic pump location has shifted, sand storage is in new location. Date: June 30, 2014Permit type: Application | Permit status: Approved | Completion date: April 22, 2014 | Permit id: 2012-191660-Rev | |||||
Site gas piping, gas valve boxes, plus demolishing gas valves and pipe upstream of gas valves only if required for road work Date: March 27, 2013Permit type: Intake | Permit status: Closed | Completion date: March 26, 2013 | Permit id: 2013-132582-000 | |||||
Dfs for mse retaining wall from service rd sta 27+09 to 27+42 - see 13-171122-rev-01-co. Date: November 23, 2015Permit type: Application | Permit status: Approved w/ cond | Completion date: October 10, 2014 | Permit id: 2013-171122-Dfs | |||||
Dfs - ultra block wall Date: November 23, 2015Permit type: Application | Permit status: Approved | Completion date: June 1, 2015 | Permit id: 2013-171122-Dfs | |||||
Dfs - seismic of plumbing/mechanical Date: February 16, 2016Permit type: Application | Permit status: Approved | Completion date: November 19, 2015 | Permit id: 2013-171122-Dfs | |||||
Revisions - eliminate portion of soil nail wall that was approved under service road permit 12-1916 co but impacts elephant site work w/ exception of forest hall soil nail wall, mse and soil nail walls are deferred submittals and are not included in this rev. See main permit for complete list of deferred walls. Date: December 26, 2013Permit type: Application | Permit status: Approved | Completion date: November 20, 2013 | Permit id: 2013-171122-Rev | |||||
Revisions - elephant habitat revision emergency generator (the zoo has added capacity to include a number of systems not covered by the base design, which adds a generator unit to a location behind the building) and equipment shelter layout changes. Date: June 10, 2014Permit type: Application | Permit status: Approved | Completion date: April 22, 2014 | Permit id: 2013-171122-Rev | |||||
Dfs - joist/girder system Date: January 10, 2014Permit type: Application | Permit status: Approved | Completion date: December 23, 2013 | Permit id: 2013-171125-Dfs | |||||
Dfs-gabian basket wall Date: November 23, 2015Permit type: Application | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2013-171127-Dfs | |||||
Gas piping 2 and 1-3/4 Date: August 1, 2013Permit type: Intake | Permit status: Closed | Completion date: August 1, 2013 | Permit id: 2013-187859-000 | |||||
Installing perforated drainage piping Date: August 23, 2013Permit type: Intake | Permit status: Closed | Completion date: August 23, 2013 | Permit id: 2013-197092-000 | |||||
Placing plastic tube (sumitomo) under ground for zoo projectfaxed Date: September 10, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: March 14, 2016 | Permit id: 2013-203310-000 | |||||
(3) temp 2 amp or less feeder for job site trailers on the oregon zoo asian elephant habitat projectfaxed. Date: November 7, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: December 6, 2013 | Permit id: 2013-225531-000 | |||||
Elephant exhibit lss bldg13-171125-co Date: December 26, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: August 21, 2015 | Permit id: 2013-241912-000 | |||||
East hub13-171127-co Date: December 26, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: August 21, 2015 | Permit id: 2013-241924-000 | |||||
Pedestrian bridge,ref 13-213247-cofaxed. Date: December 26, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: December 14, 2015 | Permit id: 2013-241925-000 | |||||
Encounter yard/shade structure. Ref: 13-213248-co Date: December 26, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: August 21, 2015 | Permit id: 2013-241926-000 | |||||
N. Meadow shade structureref: 13-213249 Date: December 26, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: August 21, 2015 | Permit id: 2013-241927-000 | |||||
Exhibit equipment structureref: 13-213250-co Date: December 26, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: August 21, 2015 | Permit id: 2013-241928-000 | |||||
(1) temp 4 amp service or feeder and (1) temp 2 amp service or feeder for temporary construction service. Date: January 10, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: August 28, 2015 | Permit id: 2014-103884-000 | |||||
Complaint - the structure is the concert stage and structural canopy. The structures were installed over two weeks ago permit/case number 2014-138009-000-00-co - under review (not sure if related) Permit type: Request | Permit status: Closed | Completion date: May 4, 2015 | Permit id: 2014-176365-000 | |||||
Complaint - the structure is the concert stage and structural canopy. The structures were installed over two weeks ago permit/case number 2014-138009-000-00-co - under review (not sure if related) Permit type: Under inspection | Permit status: In progress | Completion date: September 5, 2014 | Permit id: 2014-176365-000 | |||||
Complaint - the structure is the concert stage and structural canopy. The structures were installed over two weeks ago permit/case number 2014-138009-000-00-co - under review (not sure if related) Permit type: Enforcement | Permit status: Closed | Completion date: December 20, 2014 | Permit id: 2014-176365-000 | |||||
Single system low voltage control permit required for train crossing at gate j per jeff copeland. Installing loops to control gate and dingers. Faxed Date: November 6, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: October 9, 2015 | Permit id: 2014-235205-000 | |||||
Plumbing renovationa at oregon zoo concert lawnadd drainage to grass areawork preformed by on-site workers Date: November 17, 2015Permit type: Intake | Permit status: Closed | Completion date: March 25, 2015 | Permit id: 2015-139801-000 | |||||
Pwr - roof replacement, electrical circuits for chiller replacement - pwr Date: July 27, 2015Permit type: Intake | Permit status: Closed | Completion date: April 30, 2015 | Permit id: 2015-162064-000 | |||||
Nest building - new 14,0 sq ft education building for oregon zoo Date: January 5, 2016Permit type: Application | Permit status: Approved | Completion date: September 1, 2015 | Permit id: 2015-172517-000 | |||||
Dfs - wood i-joists and open web joists Permit type: Application | Permit status: Approved | Completion date: April 15, 2016 | Permit id: 2015-172517-Dfs | |||||
Dfs - wood i-joists and open web joists Permit type: Issuance/intake | Permit status: Intake | Completion date: April 15, 2016 | Permit id: 2015-172517-Dfs | |||||
Site work for new oregon zoo education center. Demo 3 buildings (see separate permits),demo existing below grade utilities and site prep for future buildings related to new education center. Date: September 14, 2015Permit type: Application | Permit status: Approved | Completion date: May 26, 2015 | Permit id: 2015-172517-Grd | |||||
Rev 01 - install new connection to the public storm main along highway 26 and allow surface runoff from the washington park parking lot and sw portions of the oregon zoo to be redirected out of the combined sewer and sent to storm. Date: October 12, 2015Permit type: Application | Permit status: Approved | Completion date: September 21, 2015 | Permit id: 2015-172517-Rev | |||||
Rev 02 - additional detail and information added, per bes checksheet on main permit review, for sheet c7. 11 related to the stormwater treatment. The design did not change otherwise. Deleted trash enclosure north of the nest building therefore needed to update the drainage sheets on c3. 11, c3. 12, c4. 11 & c4. 12 delta 8. Date: December 11, 2015Permit type: Application | Permit status: Approved | Completion date: November 6, 2015 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Application | Permit status: Approved | Completion date: March 3, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Issuance/intake | Permit status: Intake | Completion date: March 3, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Process management | Permit status: Closed | Completion date: March 3, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Process management | Permit status: Closed | Completion date: April 13, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Process management | Permit status: Closed | Completion date: April 21, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Planning and zoning | Permit status: Approved | Completion date: April 20, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Life safety | Permit status: Not reqd | Completion date: March 3, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Parks bureau | Permit status: Approved | Completion date: March 30, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Issuance | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2015-172517-Rev | |||||
Demo restrooms by zoo train,1,315 sf. Remove all debris. Date: September 14, 2015Permit type: Application | Permit status: Approved | Completion date: May 26, 2015 | Permit id: 2015-172557-000 | |||||
Demo insect building, 2 sf. Remove all debris. Date: September 14, 2015Permit type: Application | Permit status: Approved | Completion date: May 26, 2015 | Permit id: 2015-172568-000 | |||||
Demo lorikeet keeper building, 3 sf. Remove all debris Date: September 14, 2015Permit type: Application | Permit status: Approved | Completion date: May 26, 2015 | Permit id: 2015-172575-000 | |||||
Replace (2) existing antennas with (2) new antennas; add ancillary equipment on existing utility pole Date: September 9, 2015Permit type: Application | Permit status: Approved | Completion date: June 3, 2015 | Permit id: 2015-180141-000 | |||||
Land use compatibility statement Permit type: Land use review | Permit status: Closed | Completion date: July 6, 2015 | Permit id: 2015-196134-000 | |||||
Land use compatibility statement Permit type: Land use review | Permit status: Letter sent | Completion date: July 8, 2015 | Permit id: 2015-196134-000 | |||||
Approval of an environmental review for the construction of a 21-inch stormwater line within a 30-foot wide temporary disturbance corridor, all within the environmental conservation overlay zone, and in substantial conformance with exhibits c. 2, c. 5, and c. 6, as approved by the city of portland bureau of development services on september 16, 2015. Approval is subject to the following conditions:a. A bds construction permit may be required. Copies of the stamped exhibits c. 2, c. 5, and c. 6 from lu 15-203304 en and conditions of approval listed below, shall be included within all plan sets submitted for permits (building, zoning, grading, site development, erosion control, etc. See other technical requirements listed above). These exhibits shall be included on a sheet that is the same size as the plans submitted for the permit and shall include the following statement, any field changes shall be in substantial conformance with approved lu 15-203304 en exhibits c. 2, c. 5, and c. 6. B. Erosio Date: September 17, 2015Permit type: Land use review | Permit status: Completed | Completion date: July 21, 2015 | Permit id: 2015-203304-000 | |||||
Investigate possible tree code violation Permit type: E - code compliance | Permit status: Violation found/low limbs | Completion date: July 31, 2015 | Permit id: 2015-208516-000 | |||||
Nest building - mechanical system is a chilled water hot water hydronic central system with radiant floor piping and fan coil units. Plans w co Date: January 5, 2016Permit type: Intake | Permit status: Closed | Completion date: September 1, 2015 | Permit id: 2015-215623-000 | |||||
14 sf train platform is the entry exit point for the zoo train Date: January 5, 2016Permit type: Application | Permit status: Approved | Completion date: September 1, 2015 | Permit id: 2015-215677-000 | |||||
Zoos train station - small a c Date: January 5, 2016Permit type: Intake | Permit status: Closed | Completion date: September 1, 2015 | Permit id: 2015-215967-000 | |||||
B2 treetops, exterior wall repair of water damage, siding, framing Date: September 3, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 3, 2015 | Permit id: 2015-231362-000 | |||||
9-18-15 kc - received complaint regarding construction activities, including back up beepers, at 5: am. Audible in home with doors and windows closed. Permit type: Request | Permit status: Closed | Completion date: September 18, 2015 | Permit id: 2015-238899-000 | |||||
B2 rtu, (hoof stock) air handler replacement, same location Date: October 20, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 20, 2015 | Permit id: 2015-253129-000 | |||||
Installation of 2048 storm pipe mhs cleanout. Installation of 496 of sewer pipe. See 15-215628 co add (3) hose bib & (2) int gt 12 14 15 Date: October 26, 2015Permit type: Intake | Permit status: Closed | Completion date: October 26, 2015 | Permit id: 2015-256133-000 | |||||
Pwr - rtu, (hoof stock) air handler replacement - pwr Permit type: Intake | Permit status: Closed | Completion date: November 16, 2015 | Permit id: 2015-265541-000 | |||||
B1 colobus - replace gas heater Date: January 7, 2016Permit type: Reviews | Permit status: Approved | Completion date: January 7, 2016 | Permit id: 2016-102054-000 | |||||
Sprinkler - installation of wet sprinkler system inside the bldg and dry system to protect combustible exterior spaces Permit type: Intake | Permit status: Approved | Completion date: March 22, 2016 | Permit id: 2016-138365-000 | |||||
Sprinkler - installation of wet sprinkler system inside the bldg and dry system to protect combustible exterior spaces Permit type: Intake | Permit status: Closed | Completion date: March 22, 2016 | Permit id: 2016-138365-000 | |||||
Sprinkler - installation of wet sprinkler system inside the building and dry sprinkler system to protect combustible exterior spaces Permit type: Intake | Permit status: Approved | Completion date: March 22, 2016 | Permit id: 2016-138367-000 | |||||
Sprinkler - installation of wet sprinkler system inside the building and dry sprinkler system to protect combustible exterior spaces Permit type: Intake | Permit status: Closed | Completion date: March 22, 2016 | Permit id: 2016-138367-000 | |||||
Alarm-fire alarm for new oregon zoo education building Permit type: Intake | Permit status: Approved | Completion date: April 8, 2016 | Permit id: 2016-147324-000 | |||||
Alarm-fire alarm for new oregon zoo education building Permit type: Intake | Permit status: Closed | Completion date: April 8, 2016 | Permit id: 2016-147324-000 | |||||
1111 feet of sanitary sewer and 2456 feet of storm sewer; all on property 8 29 13 add 25 feet of fire water line add 2 of storm sewer 7 17 14 Date: June 5, 2013Permit type: Intake | Permit status: Closed | Completion date: June 5, 2013 | Permit id: 2013-164331-000 | |||||
Dfs for shotcrete soil nails Date: July 31, 2014Permit type: Application | Permit status: Approved | Completion date: May 8, 2014 | Permit id: 2013-171122-Dfs | |||||
Dfs - seismic of plumbing mechanical Date: February 16, 2016Permit type: Application | Permit status: Approved | Completion date: November 19, 2015 | Permit id: 2013-171122-Dfs | |||||
Revisions - eliminate portion of soil nail wall that was approved under service road permit 12-1916 co but impacts elephant site work w exception of forest hall soil nail wall, mse and soil nail walls are deferred submittals and are not included in this rev. See main permit for complete list of deferred walls. Date: December 26, 2013Permit type: Application | Permit status: Approved | Completion date: November 20, 2013 | Permit id: 2013-171122-Rev | |||||
Hrus, two condensing boilers, two 45-ton wshps, misc pumps, radiant heaters, plans w co Date: November 1, 2013Permit type: Intake | Permit status: Closed | Completion date: June 27, 2013 | Permit id: 2013-171124-000 | |||||
Dfs - joist girder system Date: January 10, 2014Permit type: Application | Permit status: Approved | Completion date: December 23, 2013 | Permit id: 2013-171125-Dfs | |||||
Gas piping 2 and 1-3 4 Date: August 1, 2013Permit type: Intake | Permit status: Closed | Completion date: August 1, 2013 | Permit id: 2013-187859-000 | |||||
Install (3) temp service feeders 2 amp in oregon zoo asian elephant habitat Date: October 8, 2013Permit type: Intake | Permit status: Closed | Completion date: October 8, 2013 | Permit id: 2013-214190-000 | |||||
Elec: forest hall and n s habitat Date: December 27, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: February 9, 2015 | Permit id: 2013-241908-000 | |||||
Encounter yard shade structure. Ref: 13-213248-co Date: December 26, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: August 21, 2015 | Permit id: 2013-241926-000 | |||||
Complaint - the structure is the concert stage and structural canopy. The structures were installed over two weeks ago permit case number 2014-138009-000-00-co - under review (not sure if related) Permit type: Request | Permit status: Closed | Completion date: May 4, 2015 | Permit id: 2014-176365-000 | |||||
Complaint - the structure is the concert stage and structural canopy. The structures were installed over two weeks ago permit case number 2014-138009-000-00-co - under review (not sure if related) Permit type: Under inspection | Permit status: In progress | Completion date: September 5, 2014 | Permit id: 2014-176365-000 | |||||
Complaint - the structure is the concert stage and structural canopy. The structures were installed over two weeks ago permit case number 2014-138009-000-00-co - under review (not sure if related) Permit type: Enforcement | Permit status: Closed | Completion date: December 20, 2014 | Permit id: 2014-176365-000 | |||||
Fire sprinkler - new wet dry auto sprinkler system in new zoo elephant habitat. Date: September 22, 2014Permit type: Intake | Permit status: Approved | Completion date: September 2, 2014 | Permit id: 2014-206826-000 | |||||
F3 elevator renovation, hoistway, door control, new pit ladder, electrical, Date: March 26, 2015Permit type: Intake | Permit status: Closed | Completion date: March 17, 2015 | Permit id: 2015-135448-000 | |||||
B2 concert area, extend retaining wall, guard rail, irrigation, raise lawn level Date: April 10, 2015Permit type: Intake | Permit status: Closed | Completion date: March 19, 2015 | Permit id: 2015-136917-000 | |||||
F10 install a replacement ozone system, new mechanical equipment, elec Date: April 22, 2015Permit type: Intake | Permit status: Closed | Completion date: March 25, 2015 | Permit id: 2015-140237-000 | |||||
B2 dfs for equipment holddowns Date: June 2, 2015Permit type: Intake | Permit status: Closed | Completion date: May 29, 2015 | Permit id: 2015-140237-Dfs | |||||
B2 dfs of additional holdown detail at oxygen concentrator Date: June 12, 2015Permit type: Intake | Permit status: Closed | Completion date: June 4, 2015 | Permit id: 2015-140237-Dfs | |||||
F10 roof replacement, chiller replacement Date: April 27, 2015Permit type: Reviews | Permit status: Approved | Completion date: April 27, 2015 | Permit id: 2015-159178-000 | |||||
F10 chiller replacement Date: May 13, 2015Permit type: Intake | Permit status: Closed | Completion date: April 27, 2015 | Permit id: 2015-159191-000 | |||||
B2 concert platform stage assembly Date: May 5, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 5, 2015 | Permit id: 2015-164855-000 | |||||
B2 concert platform stage assembly with steel stair Date: May 19, 2015Permit type: Intake | Permit status: Closed | Completion date: May 5, 2015 | Permit id: 2015-164858-000 | |||||
Dfs - wood i-joists and open web joists Permit type: Application | Permit status: Approved | Completion date: April 15, 2016 | Permit id: 2015-172517-Dfs | |||||
Dfs - wood i-joists and open web joists Permit type: Issuance/intake | Permit status: Intake | Completion date: April 15, 2016 | Permit id: 2015-172517-Dfs | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Application | Permit status: Approved | Completion date: March 3, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Issuance/intake | Permit status: Intake | Completion date: March 3, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Process management | Permit status: Closed | Completion date: March 3, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Process management | Permit status: Closed | Completion date: April 13, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Process management | Permit status: Closed | Completion date: April 21, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Planning and zoning | Permit status: Approved | Completion date: April 20, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Life safety | Permit status: Not reqd | Completion date: March 3, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Parks bureau | Permit status: Approved | Completion date: March 30, 2016 | Permit id: 2015-172517-Rev | |||||
Rev 03 - remove 3 additional trees, trees 5, 8, & 11, from zoo property related to the new education center, one from cu master plan key area iii-3g4 and two from iii-3f. Permit type: Issuance | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2015-172517-Rev | |||||
B1 add new storm catch basin to low point of the cascades building path Date: June 1, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 1, 2015 | Permit id: 2015-178181-000 | |||||
B1 plumbing renovation at oregon zoo to add 2 catch basins Date: June 3, 2015Permit type: Intake | Permit status: Closed | Completion date: June 3, 2015 | Permit id: 2015-179759-000 | |||||
Land use compatibility statement Permit type: Land use review | Permit status: Closed | Completion date: July 6, 2015 | Permit id: 2015-196134-000 | |||||
Land use compatibility statement Permit type: Land use review | Permit status: Letter sent | Completion date: July 8, 2015 | Permit id: 2015-196134-000 | |||||
Set up in error entryway sculpture @ stellar cove Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: July 7, 2000 | Current use: Utility | Permit id: 1998-121271-000 | |||||
Sculpture at entry to stellars cove (replaces 98-121271, set up in error) Date: February 14, 2000Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: February 29, 2000 | Current use: Utility | Permit id: 2000-128458-000 | |||||
Art work & designing a support pole and connection of the pole base to the existing wood-framed pedestrian bridge at the oregon zoo Date: May 22, 2000Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: March 18, 2003 | Current use: Business | Permit id: 2000-129938-000 | |||||
Build 21 x 36 greenhouse at the zoo - not open to the public. Date: December 17, 2001Client: Neighbors West Northwest | Permit type: Addition | Permit status: Final | Completion date: June 11, 2002 | Current use: Business | Permit id: 2000-182238-000 | |||||
Erect a temporary tent structure for reptile exhibit & asphalt pathways to exhibit tent duration 6-6-01 til 9-4-01. Asphalt pathway will remain. Separate tent permit notrequired from fmo. See comments Date: May 11, 2001Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: May 12, 2005 | Current use: Assembly | Permit id: 2001-133038-000 | |||||
Remove and replace light pole with antenna. Same proximity Date: December 13, 2001Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: September 20, 2002 | Current use: Utility | Permit id: 2001-156868-000 | |||||
Eagle salmon exhibit: construct shed structures for bird shelter and viewing, covered bridge, mesh enclosure, tunnel and pool, landscaping and path work. Date: March 21, 2003Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: August 24, 2004 | Current use: Business | Permit id: 2002-149986-000 | |||||
2 new ticket kiosks sf at existing zoo entrance. Relocaten entry fence and gates to allow for new kiosks. Date: November 19, 2002Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: May 12, 2005 | Current use: Business | Permit id: 2002-151428-000 | |||||
Farm house for education Date: January 30, 2004Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: August 20, 2004 | Current use: Assembly | Permit id: 2003-154813-000 | |||||
New barn for exhibits Date: January 30, 2004Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: August 20, 2004 | Current use: Assembly | Permit id: 2003-153909-000 | |||||
Suspension bridge Date: January 9, 2006Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: February 22, 2007 | Current use: Utility | Permit id: 2005-148859-000 | |||||
New lower bear viewing structure Date: January 9, 2006Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: March 6, 2007 | Current use: Assembly | Permit id: 2005-148873-000 | |||||
New cougar holding building Date: January 9, 2006Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: March 6, 2007 | Current use: Assembly | Permit id: 2005-148868-000 | |||||
New bear bobcat holding viewing structure w associated pathway and site work Date: January 9, 2006Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: April 18, 2007 | Current use: Assembly | Permit id: 2005-148870-000 | |||||
New cougar viewing building Date: January 9, 2006Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: March 6, 2007 | Current use: Assembly | Permit id: 2005-147434-000 | |||||
Addition to [e] retail building - black bear holding facility Date: January 9, 2006Client: Neighbors West Northwest | Permit type: Addition | Permit status: Final | Completion date: March 6, 2007 | Current use: Assembly | Permit id: 2005-148865-000 | |||||
Remove some of the parking lot medians and replace with stormwater flow thru planters Date: March 8, 2006Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: August 1, 2006 | Current use: Business | Permit id: 2006-101975-000 | |||||
New additions, renovation and partial demolition of existing interpretive and animal holding buildings creating a new predators of the serengeti exhibit Date: July 28, 2008Client: Neighbors West Northwest | Permit type: Addition | Permit status: Final | Completion date: April 13, 2010 | Current use: Assembly | Permit id: 2007-184596-000 | |||||
New additions, renovation and partial demolition of existing primate building for new red ape reserve exhibit Date: July 28, 2008Client: Neighbors West Northwest | Permit type: Addition | Permit status: Final | Completion date: April 9, 2010 | Current use: Assembly | Permit id: 2007-184601-000 | |||||
5 new hut like structures located in the plaza area north of exhibit Date: July 28, 2008Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: October 27, 2009 | Current use: Assembly | Permit id: 2007-184599-000 | |||||
Alterations to existing cheetah holding structure Date: July 28, 2008Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: October 27, 2009 | Current use: Assembly | Permit id: 2008-120579-000 | |||||
Construct single story, 16,948 sf veterinary hospital. See 10-113106-lu Date: September 16, 2010Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: February 9, 2012 | Current use: Business | Permit id: 2009-165654-000 | |||||
Demolish quarantine building and remove designated trees approved under land use application 10-113166 en (no fine or rough grading this permit. Not utiltiy removal this permit. ) Date: August 20, 2010Client: Neighbors West Northwest | Permit type: Demolition | Permit status: Final | Completion date: December 28, 2010 | Current use: Business | Permit id: 2010-164734-000 | |||||
New soldier pile wall Date: February 1, 2012Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: February 21, 2012 | Current use: Business | Permit id: 2011-121104-000 | |||||
Remodel two holding rooms within swamp building; new retaining walls, guardrail; new bird pool Date: November 20, 2012Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: February 1, 2013 | Current use: Business | Permit id: 2012-113799-000 | |||||
Demo bird barn building no basement Date: October 5, 2012Client: Neighbors West Northwest | Permit type: Demolition | Permit status: Final | Completion date: November 9, 2012 | Current use: Utility | Permit id: 2012-113822-000 | |||||
New bird barn building Date: October 5, 2012Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: February 1, 2013 | Current use: Utility | Permit id: 2012-113827-000 | |||||
Demolish existing wild life live building Date: March 27, 2013Client: Neighbors West Northwest | Permit type: Demolition | Permit status: Final | Completion date: August 9, 2013 | Current use: Business | Permit id: 2012-194349-000 | |||||
Demolish elk meadow viewing platform Date: March 27, 2013Client: Neighbors West Northwest | Permit type: Demolition | Permit status: Final | Completion date: August 12, 2013 | Current use: Utility | Permit id: 2012-194554-000 | |||||
Demolish concrete bridge structure Date: March 27, 2013Client: Neighbors West Northwest | Permit type: Demolition | Permit status: Final | Completion date: January 6, 2014 | Current use: Utility | Permit id: 2012-194562-000 | |||||
Demolish train concrete bridge structure & covered eating area Date: March 27, 2013Client: Neighbors West Northwest | Permit type: Demolition | Permit status: Final | Completion date: August 12, 2013 | Current use: Utility | Permit id: 2012-194565-000 | |||||
New 425 sf condor keepers structure and habitat enclosure with associated site work Date: May 7, 2013Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: April 7, 2014 | Current use: Business | Permit id: 2012-219447-000 | |||||
New 3 sf addition, minor reconfiguration of existing building, addition of exterior enclosures. Date: January 23, 2013Client: Neighbors West Northwest | Permit type: Addition | Permit status: Final | Completion date: July 10, 2013 | Current use: Business | Permit id: 2012-174274-000 | |||||
Demolish existing train storage shed Date: March 27, 2013Client: Neighbors West Northwest | Permit type: Demolition | Permit status: Final | Completion date: August 12, 2013 | Current use: Storage | Permit id: 2012-194355-000 | |||||
Demolish elk meadow storage shed Date: March 27, 2013Client: Neighbors West Northwest | Permit type: Demolition | Permit status: Final | Completion date: August 12, 2013 | Current use: Storage | Permit id: 2012-194559-000 | |||||
Demolish elk meadow holding building Date: March 27, 2013Client: Neighbors West Northwest | Permit type: Demolition | Permit status: Final | Completion date: August 9, 2013 | Current use: Storage | Permit id: 2012-194372-000 | |||||
Repair and relocate a portion of existing fence at cheetah enclosure Date: April 9, 2013Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: July 3, 2013 | Current use: Utility | Permit id: 2013-136566-000 | |||||
New covered structure at front of hort bay "d" Date: April 25, 2013Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: June 11, 2013 | Current use: Storage | Permit id: 2013-134795-000 | |||||
New covered structure at back of hort bay "d" Date: April 25, 2013Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: June 11, 2013 | Current use: Storage | Permit id: 2013-134809-000 | |||||
Demolish education building Date: November 1, 2013Client: Neighbors West Northwest | Permit type: Demolition | Permit status: Final | Completion date: May 20, 2014 | Current use: Business | Permit id: 2013-213246-000 | |||||
Encounter yard shade structure 592 sf Date: November 1, 2013Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: June 12, 2014 | Current use: Utility | Permit id: 2013-213248-000 | |||||
Construct 3 new art towers at different locations within the elephant exhibit, each tower is placed on a 64 sf concrete pad and is 30-3" tall Date: March 31, 2015Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: November 24, 2015 | Current use: Utility | Permit id: 2014-251160-000 | |||||
New construction of sf employee bike shelter Date: August 8, 2016Client: Neighbors West Northwest | Permit type: New construction | Permit status: Under inspection | Current use: Storage | Permit id: 2016-212206-000 | |||||
Additon to house mechanical filtration system equipment for penguin pool Date: October 29, 2010Permit type: Addition | Permit status: Final | Completion date: January 31, 2012 | Current use: Institutional | Permit id: 2010-144081-000 |