ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: December 7, 2004Permit status: Issued | Current use: Single family dwelling | Permit id: 367373 | |||||
Alarm system Date: January 29, 2001Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 239395 | |||||
1 alarm system, 7 devices Date: May 24, 2001Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 249108 | |||||
3 story addition Date: December 7, 2004 Value: $35,000Permit type: Building residential permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 364972 | |||||
Building residential permit Date: December 17, 2004 Value: $6,000Permit status: Finaled | Current use: Single family dwelling | Permit id: 368314 | |||||
Altering front & side porch Date: May 10, 2016 Value: $20,000Permit type: Building residential permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 754857 | |||||
Electrical permit Date: May 19, 2016Permit status: Issued | Current use: Single family dwelling | Permit id: 756254 | |||||
Sewer main replacement and installation of new lateralsin accordance with wssc plans and specifications. Work shall comply with montgomery county specifications for utility construction permit the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures and traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 23, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 355423 |