| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Construct an hdtv broadcast production room, two storage rooms and one storage closet in the receiving area of the crypt level of the basilica of the national shrine including mechanical and electrical work. All work is interior work. Date: June 29, 2012Client: National Shrine Of The Immaculate Conception | Applicant: Basilica Of The Of The Immaculate Conception; Anthony J. Segreti | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1210853 | |||||
Electrical Date: August 20, 2012Client: National Shrine Of The Immaculate Conception | Applicant: Ronald S Coffey | Permit status: Completed | Permit id: E1208818 | |||||
Remove existing 3/4 inch thick gypsum plaster from the vaulted gustavino dome of the south choir/organ gallery on the 2nd floor gallery level of the upper church and replace same with 3/4 inch thick portland cement plaster. All interior work. No mechanical, plumbing or electrical work. Date: April 26, 2013Client: Basilica Of The National Shrine Of The Immaculate Conception | Applicant: Anthony J. Segreti, Aia | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1306215 | |||||
Construct a scaffold platform on the south gallery level of the south choir/organ gallery Date: March 29, 2013Client: National Shrine Of The Immaculate Conception | Applicant: Anthony J. Segreti, Aia Architect | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sc1300093 | |||||
Electrical Date: May 28, 2013Client: National Shrine Of The Immaculate Conception | Applicant: Ronald S Coffey | Permit status: Permit issued | Permit id: E1305560 | |||||
Construct the hungarian chapel on the crypt level on the east aisle near the east transept including all structural, mechanical and electrical work. All work is interior work. Date: July 2, 2014Client: Basilica Of The National Shrine Of The Immaculate Conception | Applicant: Anthony J. Segreti | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1409267 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfi9mrcuh%2fppjq6ukhbakjg Date: April 7, 2014Client: Basilica Of The National Shrine Of The Immaculate Conception | Applicant: Lorraine Johnson; Basilica Of The Of The Immaculate Conception; Ronald Coffey | Permit type: Electrical | Permit status: Permit issued | Permit id: E27779329 | |||||
Replacing wireless fire alarm sub-system Date: March 31, 2014Client: Basilica Of The National Shrine Of The Immaculate | Applicant: Spurge Eismeier / Permits By Pinecrest | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1405640 | |||||
SCORE 96 Electrical Date: August 20, 2012 Contractor: Ronald S CoffeyClient: National Shrine Of The Immaculate Conception | Permit status: Completed | Permit id: E1208818 | |||||
SCORE 96 Mechanical Date: August 23, 2012 Contractor: John A KeisterClient: National Shrine Of The Immaculate Conception | Permit status: Completed | Permit id: M1202745 | |||||
SCORE 96 Electrical Date: May 28, 2013 Contractor: Ronald S CoffeyClient: National Shrine Of The Immaculate Conception | Permit status: Permit issued | Permit id: E1305560 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfi9mrcuh%2fppjq6ukhbakjg Date: April 7, 2014Client: Basilica Of The National Shrine Of The Immaculate Conception | Permit type: Electrical | Permit status: Permit issued | Permit id: E27779329 | |||||
SCORE 96 Electrical Date: December 3, 2012 Contractor: Ronald S CoffeyClient: National Shrine Of The Immaculate Conception | Permit status: Permit issued | Permit id: E1301472 | |||||
SCORE 56 Remove existing 3/4 inch thick gypsum plaster from the vaulted gustavino dome of the south choir/organ gallery on the 2nd floor gallery level of the upper church and replace same with 3/4 inch thick portland cement plaster. All interior work. No mechanical, plumbing or electrical work. Date: April 26, 2013 Contractor: Anthony J. Segreti AiaClient: Basilica Of The National Shrine Of The Immaculate Conception | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1306215 | |||||
SCORE 96 Mechanical Date: August 23, 2012 Contractor: John A KeisterClient: National Shrine Of The Immaculate Conception | Permit status: Completed | Permit id: M1202745 | |||||
SCORE 96 Electrical Date: May 28, 2013 Contractor: Ronald S CoffeyClient: National Shrine Of The Immaculate Conception | Permit status: Permit issued | Permit id: E1305560 | |||||
SCORE 56 Construct a scaffold platform on the south gallery level of the south choir/organ gallery Date: March 29, 2013 Contractor: Anthony J. Segreti Aia ArchitectClient: National Shrine Of The Immaculate Conception | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sc1300093 | |||||
SCORE 56 Construct an hdtv broadcast production room, two storage rooms and one storage closet in the receiving area of the crypt level of the basilica of the national shrine including mechanical and electrical work. All work is interior work. Date: June 29, 2012Client: National Shrine Of The Immaculate Conception | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1210853 | |||||
SCORE 56 Furnish and install new italian travertine marble wall cladding on the four existing brick arches of the basilicas crossing dome to match existing travertine marble wall cladding installed in the 1960s on the masonry piers of the crossing dome below the existing 39 inch high marble cornice which separates the brick arches from the piers below. The bottom and the top of the existing brick arches are 61 feet and 106 feet respectively above the floor of the church. All interior work. No permanent mechanical, plumbing or electrical work. The temporary scaffold structure constructed under scaffold permit no. Sc1600045 issued january 26, 2016 will be used to facilitate this work. Date: October 24, 2016Client: Kevin A. Kavanaugh Basilica -National Shrine -Immaculate Concept | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1700345 | |||||
SCORE 86 Replacing wireless fire alarm sub-system Date: March 31, 2014 Contractor: Spurge Eismeier Permits By PinecrestClient: Basilica Of The National Shrine Of The Immaculate | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1405640 | |||||
SCORE 56 Construct the hungarian chapel on the crypt level on the east aisle near the east transept including all structural, mechanical and electrical work. All work is interior work. Date: July 2, 2014 Contractor: Anthony J. SegretiClient: Basilica Of The National Shrine Of The Immaculate Conception | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1409267 | |||||
SCORE 56 Construct an hdtv broadcast production room, two storage rooms and one storage closet in the receiving area of the crypt level of the basilica of the national shrine including mechanical and electrical work. All work is interior work. Date: June 29, 2012Client: National Shrine Of The Immaculate Conception | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1210853 | |||||
SCORE 96 Electrical Date: December 3, 2012 Contractor: Ronald S CoffeyClient: National Shrine Of The Immaculate Conception | Permit status: Permit issued | Permit id: E1301472 | |||||
SCORE 96 Electrical Date: August 20, 2012 Contractor: Ronald S CoffeyClient: National Shrine Of The Immaculate Conception | Permit status: Completed | Permit id: E1208818 | |||||
SCORE 96 Mechanical Date: August 23, 2012 Contractor: John A KeisterClient: National Shrine Of The Immaculate Conception | Permit status: Completed | Permit id: M1202745 | |||||
SCORE 56 Construct a scaffold platform on the south gallery level of the south choir organ gallery Date: March 29, 2013 Contractor: Anthony J. Segreti, Aia ArchitectClient: National Shrine Of The Immaculate Conception | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sc1300093 | |||||
SCORE 56 Remove existing 3 4 inch thick gypsum plaster from the vaulted gustavino dome of the south choir organ gallery on the 2nd floor gallery level of the upper church and replace same with 3 4 inch thick portland cement plaster. All interior work. No mechanical, plumbing or electrical work. Date: April 26, 2013 Contractor: Anthony J. Segreti, AiaClient: Basilica Of The National Shrine Of The Immaculate Conception | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1306215 | |||||
SCORE 96 Electrical Date: May 28, 2013 Contractor: Ronald S CoffeyClient: National Shrine Of The Immaculate Conception | Permit status: Permit issued | Permit id: E1305560 | |||||
SCORE 56 Furnish and install new italian travertine marble wall cladding on the four existing brick arches of the basilicas crossing dome to match existing travertine marble wall cladding installed in the 1960s on the masonry piers of the crossing dome below the existing 39 inch high marble cornice which separates the brick arches from the piers below. The bottom and the top of the existing brick arches are 61 feet and 106 feet respectively above the floor of the church. All interior work. No permanent mechanical, plumbing or electrical work. The temporary scaffold structure constructed under scaffold permit no. Sc1600045 issued january 26, 2016 will be used to facilitate this work. Date: October 24, 2016Client: Kevin A. Kavanaugh Basilica -National Shrine -Immaculate Concept | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1700345 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfi9mrcuh%2fppjq6ukhbakjg Date: April 7, 2014Client: Basilica Of The National Shrine Of The Immaculate Conception | Permit type: Electrical | Permit status: Permit issued | Permit id: E27779329 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildndhnkdppju0ukhlso7kau Date: July 30, 2016 Contractor: Lorraine Johnson; Kevin Kavanaugh; Ronald CoffeyClient: Kevin Kavanaugh | Permit type: Electrical | Permit status: Permit issued | Permit id: E38761651 | |||||
SCORE 56 Construct a temporary scaffold platform in the existing crossing dome of the upper church of the basilica for the purpose of removing existing all 3/4 inch thick gypsum plaster from the 4 vaulted guastavino tile pendentives, the ring and the spherical upper dome above including the sills, jambs and arched heads of the 36 existing stained glass windows and and re-plastering the guastavino tile surfaces with 3/4 inch thick portland cement plaster. All interior work. No permanent mechanical, plumbing or electrical work. Please note that the size of the crossing dome is 89 feet square and the height to the top of dome from the floor of the upper church is 159 feet. Date: January 26, 2016 Contractor: Anthony J. Segr Anthony J. Segreti Aia ArchitectClient: Kevin A. Kavanaugh, Comptroller Basilica - National Shrine - Imm | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sc1600045 | |||||
SCORE 56 Construct a temporary scaffold platform in the existing crossing dome of the upper church of the basilica for the purpose of removing existing all 3 4 inch thick gypsum plaster from the 4 vaulted guastavino tile pendentives, the ring and the spherical upper dome above including the sills, jambs and arched heads of the 36 existing stained glass windows and and re-plastering the guastavino tile surfaces with 3 4 inch thick portland cement plaster. All interior work. No permanent mechanical, plumbing or electrical work. Please note that the size of the crossing dome is 89 feet square and the height to the top of dome from the floor of the upper church is 159 feet. Date: January 26, 2016Client: Kevin A. Kavanaugh, Comptroller Basilica - National Shrine - Imm | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sc1600045 |