ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Place new conduit; 15x3; sdwk; ; boston police area c; 343-4343; ; 9: am;to 3: pm weekdays only Date: October 14, 2015Permit type: Service | Permit status: Expired | Permit id: Exca-527895 | Parcel: 0602841000 | |||||
Cutting burning welding grinding rebar and formwork and formwork accessories for building foundation and precast erection (dpl) Date: February 27, 2015Permit status: Na | Permit id: Cbw441716 | Parcel: 0602841000 | |||||
Weldingcuttingburning for installation of buildings gas meter; piping servicing hot water boilers gas water heaters &; energy recovery units dpl82115 Date: July 23, 2015Permit status: Na | Permit id: Cbw496533 | Parcel: 0602841000 | |||||
Cutting burning &; welding of gas piping/meters servicing hot water boilers gas water heaters &; energy recovery units (dpl); Date: September 1, 2015Permit status: Na | Permit id: Cbw513007 | Parcel: 0602841000 | |||||
Cutting / burning / welding of piping and sheetmetal for;installation of hvac system;to accommodate erection of new building (dpl) bfd paid detail required Date: September 14, 2015Permit status: Na | Permit id: Cbw517544 | Parcel: 0602841000 | |||||
Stand crane in street /boston police area c; 343-4343; / 6 am to 6 pm Date: February 25, 2015Permit type: Cranes | Permit status: Expired | Permit id: Occu-449546 | Parcel: 0602841000 | |||||
Cutting &; burning of steel stair erection steel elevator fronts &; railings Date: August 5, 2015Permit status: Na | Permit id: Cbw497306 | Parcel: 0602841000 | |||||
Welding soldering &; brazing steel copper pipe in the 1st floor mechanical room. Brazing on the roof for condensing unit copper refrigerant lines. The pipe needs to be welded to be able to transport water from the chiller throughout the building to the cooling tower. The copper pipe needs to be brazed to transport water throughout the building havc units and refrigerant throughout the building to condensing units on the roof. Bfd paid detail required bfd paid detail required Date: March 2, 2015Permit status: Na | Permit id: Cbw447228 | Parcel: 0602841000 | |||||
Place new conduit; 15x3; sdwk; / boston police area c; 343-4343; /; 9: am;to 3: pm / weekdays only Date: October 14, 2015Client: Intercontinental Fund Iv | Permit type: Service | Permit status: Expired | Permit id: Exca-527895 | Parcel: 0602841000 | |||||
Excavation permit Date: October 14, 2015Client: Intercontinental Fund Iv | Permit type: Service | Permit id: Exca-527895 |