ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
The maidens choice run (mc-10) ecosystem resoration project includes bank grading to establish adequate floodplain access the installation of bank protection and grade control sturctures where necessary to stabilize the stream channel banks and bed. Ri Date: May 9, 2007 Value: $250,000Permit id: Com2006-39593 | |||||
Replace fixture first and second floor and add gas line. Date: March 28, 2005 Value: $9,000Permit id: Com2005-08241 | |||||
The maidens choice run (mc-10) ecosystem resoration project includes bank grading to establish adequate floodplain access the installation of bank protection and grade control sturctures where necessary to stabilize the stream channel banks and bed. Riparian buffer establishment is proposed. In addition ball fields adjacent to the stream will be re-graded and re-aligned. As per plans as per code. 25. Filing fees credited from com2006-01475 on 01/18/06 per peggy white on 4/24/07 Date: May 9, 2007 Value: $250,000Expiration date: May 9, 2008 | Permit id: Com2006-39593 | |||||
The maidens choice run (mc-10) ecosystem resoration project includes bank grading to establish adequate floodplain access the installation of bank protection and grade control sturctures where necessary to stabilize the stream channel banks and bed. Riparian buffer establishment is proposed. In addition ball fields adjacent to the stream will be re-graded and re-aligned. As per plans as per code. 25. Filing fees credited from com2006-01475 on 01 18 06 per peggy white on 4 24 07 Date: May 9, 2007 Value: $250,000Expiration date: May 9, 2008 | Permit id: Com2006-39593 |