ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
T8s3/pr# fm mo2 3rd fl - 3rd fl interior remodel ---see dfs permit before final--- old folder name: b-3rd fl ti - fred meyer corp-mo2 Date: June 25, 2004Permit type: Intake | Permit status: Closed | Completion date: April 29, 2004 | Permit id: 2004-019420-000 | |||||
Annual master permit inspection 12. 10. 14 Date: December 10, 2014Permit type: Intake | Permit status: Closed | Completion date: December 10, 2014 | Permit id: 2014-247887-000 | |||||
F22/ fmm03 - replacement of 85 fan powered variable air volume (vav) boxes. Like for like in same locations over five floors Date: February 10, 2015Permit type: Reviews | Permit status: Approved | Completion date: February 10, 2015 | Permit id: 2015-117561-000 | |||||
Power - fmm03 - replacement of 85 fan powered variable air volume (vav) boxes. Like for like in same locations over five floors Permit type: Intake | Permit status: Closed | Completion date: March 2, 2015 | Permit id: 2015-127266-000 | |||||
B1/ call center - add/ relocate two doors, move a wall Date: March 16, 2015Permit type: Reviews | Permit status: Approved | Completion date: March 16, 2015 | Permit id: 2015-134617-000 | |||||
Power - call center - add/ relocate two doors, move a wall Date: March 17, 2015Permit type: Intake | Permit status: Closed | Completion date: March 17, 2015 | Permit id: 2015-135231-000 | |||||
Request for a land use compatibility statement. Permit type: Land use review | Permit status: Closed | Completion date: April 24, 2015 | Permit id: 2015-154719-000 | |||||
Request for a land use compatibility statement. Permit type: Land use review | Permit status: Letter sent | Completion date: May 27, 2015 | Permit id: 2015-154719-000 | |||||
F6/ fred meyer main office 1, replace failed 15 ton rtu with new 15 ton unit with gas heat Date: May 21, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 21, 2015 | Permit id: 2015-174191-000 | |||||
B1/ main office #4 door lock upgrade Date: May 22, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 22, 2015 | Permit id: 2015-175088-000 | |||||
Power - fred meyer main office 1, replace failed 15 ton rtu with new 15 ton unit with gas heat Permit type: Intake | Permit status: Closed | Completion date: June 2, 2015 | Permit id: 2015-179495-000 | |||||
F11/ install 2 ton ductless roof top air conditioner and outside air ventilation for elevator hvac Date: June 11, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 11, 2015 | Permit id: 2015-184398-000 | |||||
Door lock reversal Date: June 15, 2015Permit type: Intake | Permit status: Closed | Completion date: June 15, 2015 | Permit id: 2015-186288-000 | |||||
F14/ replace 79 like for like vav boxes Date: July 6, 2015Permit type: Reviews | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-196611-000 | |||||
F14/ replace 79 like for like vav boxes Permit type: Intake | Permit status: Closed | Completion date: July 6, 2015 | Permit id: 2015-196621-000 | |||||
F15/ 1st floor; office remodel, remove some office partition walls, doors, install long wall to create large open office, doors, relites, ceiling, elec Date: May 12, 2014Permit type: Intake | Permit status: Closed | Completion date: April 24, 2014 | Permit id: 2014-147334-000 | |||||
F15/ 1st floor; office remodel, - rev-01 reduce length of exterior ramp to end at existing side walk and change stud size of built-up column studs from 6 to 3 5/8 Date: June 12, 2014Permit type: Intake | Permit status: Closed | Completion date: June 6, 2014 | Permit id: 2014-147334-Rev | |||||
Power - 1st floor; office remodel, remove some office partition walls, doors, install long wall to create large open office, doors, relites, ceiling, elec Date: May 2, 2014Permit type: Intake | Permit status: Closed | Completion date: May 2, 2014 | Permit id: 2014-151791-000 | |||||
Voice/data - 1st floor; office remodel, remove some office partition walls, doors, install long wall to create large open office, doors, relites, ceiling, elec Date: May 12, 2014Permit type: Intake | Permit status: Closed | Completion date: May 12, 2014 | Permit id: 2014-155263-000 | |||||
Power - flourescent ballast and lamp change out Date: June 4, 2014Permit type: Intake | Permit status: Closed | Completion date: June 4, 2014 | Permit id: 2014-165185-000 | |||||
B2/ 1st floor, replace 14 like for like suspended vav boxes Date: June 19, 2014Permit type: Intake | Permit status: Closed | Completion date: June 11, 2014 | Permit id: 2014-168327-000 | |||||
Call center- add and relocate fire sprinklers as neede for t. I.- 16 heads total Date: June 12, 2014Permit type: Intake | Permit status: Closed | Completion date: June 12, 2014 | Permit id: 2014-168681-000 | |||||
F4/ install return air grills in t-bar ceiling Date: October 3, 2014Permit type: Intake | Permit status: Closed | Completion date: September 22, 2014 | Permit id: 2014-215782-000 | |||||
B2/ reconfigure diffuser returns for ceiling layout Date: September 22, 2014Permit type: Reviews | Permit status: Approved | Completion date: September 22, 2014 | Permit id: 2014-216080-000 | |||||
Plumbing renovation at fred meyer mo 2install tankless water Date: October 3, 2014Permit type: Intake | Permit status: Closed | Completion date: September 24, 2014 | Permit id: 2014-217219-000 | |||||
Power - replace 79 like for like vav boxes Date: August 7, 2015Permit type: Intake | Permit status: Closed | Completion date: August 7, 2015 | Permit id: 2015-213559-000 | |||||
F10/gym wall bracing, brace existing wall - corporate gym - bldg 5 Date: September 2, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 2, 2015 | Permit id: 2015-230429-000 | |||||
F28/ pps mail order renovation; remodel mezzanine area, main floor, remove/add some walls, doors, remove overhead doors infill with glass windows, restroom work, new conveyor system, penetrate wall for new personnel door, concrete work, ceiling, elec, plbg, finishes Date: October 8, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 8, 2015 | Permit id: 2015-248310-000 | |||||
B2/ seismic calcs for hvac unit support Date: February 18, 2016Permit type: Intake | Permit status: Closed | Completion date: February 4, 2016 | Permit id: 2015-248335-Dfs | |||||
F28/ new rtus, ductwork, grilles Date: December 17, 2015Permit type: Intake | Permit status: Closed | Completion date: October 8, 2015 | Permit id: 2015-248344-000 | |||||
Kroger/fred meyer remodel. 23 fixtures: 7- wc, 2- ur, 9- lav, 2- fd, 1- ms, 1- wtr. Htr. 1- df. Date: February 22, 2016Permit type: Intake | Permit status: Closed | Completion date: October 26, 2015 | Permit id: 2015-256104-000 | |||||
Power - pps mail order removation; remodel mezzanine area, main floor, remove/add some walls, doors, remove overhead doors infill with glass windows, restroom work, new conveyor system, penetrate wall for new personnel door, concrete work, ceiling, elec, plbg, finishes Date: October 27, 2015Permit type: Intake | Permit status: Closed | Completion date: October 27, 2015 | Permit id: 2015-257043-000 | |||||
Voice/data, cameras, access - pps mail order renovation; remodel mezzanine area, main floor, remove/add some walls, doors, remove overhead doors infill with glass windows, restroom work, new conveyor system, penetrate wall for new personnel door, concrete work, ceiling, elec, plbg, finishes Date: December 17, 2015Permit type: Intake | Permit status: Closed | Completion date: December 17, 2015 | Permit id: 2015-278362-000 | |||||
Install 3 thermostats for roof top units Date: January 19, 2016Permit type: Intake | Permit status: Closed | Completion date: January 19, 2016 | Permit id: 2016-107255-000 | |||||
Fire alarm - pps mail order renovation; remodel mezzanine area, main floor, remove/add some walls, doors, remove overhead doors infill with glass windows, restroom work, new conveyor system, penetrate wall for new personnel door, concrete work, ceiling, elec, plbg, finishes Date: January 26, 2016Permit type: Intake | Permit status: Closed | Completion date: January 26, 2016 | Permit id: 2016-110995-000 | |||||
Pps mail order- alteration to the fire sprinklers as needed for t. I.- 169 heads total Date: January 27, 2016Permit type: Intake | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2016-111986-000 | |||||
Pps mail order- alteration to the fire alarm as needed for t. I.- 1 strobe total Date: January 27, 2016Permit type: Intake | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2016-111996-000 | |||||
F12/mo-3 5th floor office reconfiguration-demo existing office walls, casework and flooring, reinstall walls, casework for new office configuration, elec. Date: April 7, 2016Permit type: Reviews | Permit status: Approved | Completion date: April 7, 2016 | Permit id: 2016-147790-000 | |||||
F1/ racking - 12 in height Permit type: Intake | Permit status: Closed | Completion date: April 14, 2016 | Permit id: 2016-152640-000 | |||||
2 sf trash enclosure on west side, including metal framed roof, drain, privacy slats, swinging doors and interior lighting Permit type: Application | Permit status: Approved | Completion date: April 5, 2013 | Permit id: 2013-136510-000 | |||||
2 sf trash enclosure on west side, including metal framed roof, drain, privacy slats, swinging doors and interior lighting Permit type: Environmental services | Permit status: Approved | Completion date: April 5, 2013 | Permit id: 2013-136510-000 | |||||
2 sf trash enclosure on west side, including metal framed roof, drain, privacy slats, swinging doors and interior lighting Permit type: Transportation | Permit status: Closed | Completion date: April 5, 2013 | Permit id: 2013-136510-000 | |||||
2 sf trash enclosure on west side, including metal framed roof, drain, privacy slats, swinging doors and interior lighting Permit type: Transportation | Permit status: Approved | Completion date: April 5, 2013 | Permit id: 2013-136510-000 | |||||
2 sf trash enclosure on west side, including metal framed roof, drain, privacy slats, swinging doors and interior lighting Permit type: Water bureau review | Permit status: Not reqd | Completion date: April 5, 2013 | Permit id: 2013-136510-000 | |||||
Power - fmm03 - replacement of 85 fan powered variable air volume (vav) boxes. Like for like in same locations over five floors Date: July 16, 2015Permit type: Intake | Permit status: Closed | Completion date: March 2, 2015 | Permit id: 2015-127266-000 | |||||
Request for a land use compatibility statement. Permit type: Land use review | Permit status: Closed | Completion date: April 24, 2015 | Permit id: 2015-154719-000 | |||||
Request for a land use compatibility statement. Permit type: Land use review | Permit status: Letter sent | Completion date: May 27, 2015 | Permit id: 2015-154719-000 | |||||
Power - fred meyer main office 1, replace failed 15 ton rtu with new 15 ton unit with gas heat Date: July 16, 2015Permit type: Intake | Permit status: Closed | Completion date: June 2, 2015 | Permit id: 2015-179495-000 | |||||
Emergency response to tree failure Permit type: C - emergency | Permit status: Emergency resolved/follow | Completion date: July 9, 2015 | Permit id: 2015-197216-000 | |||||
Power - install 2 ton ductless roof top air conditioner and outside air ventilation for elevator hvac Date: July 16, 2015Permit type: Intake | Permit status: Closed | Completion date: July 16, 2015 | Permit id: 2015-202243-000 | |||||
Hvac controls- install 2 ton ductless roof top air conditioner and outside air ventilation for elevator hvac Date: July 20, 2015Permit type: Intake | Permit status: Closed | Completion date: July 20, 2015 | Permit id: 2015-203656-000 | |||||
F10 gym wall bracing, brace existing wall - corporate gym - bldg 5 Date: September 2, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 2, 2015 | Permit id: 2015-230429-000 | |||||
F28 pps mail order renovation; remodel mezzanine area, main floor, remove add some walls, doors, remove overhead doors infill with glass windows, restroom work, new conveyor system, penetrate wall for new personnel door, concrete work, ceiling, elec, plbg, finishes Date: October 8, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 8, 2015 | Permit id: 2015-248310-000 | |||||
B2 seismic calcs for hvac unit support Date: February 18, 2016Permit type: Intake | Permit status: Closed | Completion date: February 4, 2016 | Permit id: 2015-248335-Dfs | |||||
F28 new rtus, ductwork, grilles Date: December 17, 2015Permit type: Intake | Permit status: Closed | Completion date: October 8, 2015 | Permit id: 2015-248344-000 | |||||
Kroger fred meyer remodel. 23 fixtures: 7- wc, 2- ur, 9- lav, 2- fd, 1- ms, 1- wtr. Htr. 1- df. Date: February 22, 2016Permit type: Intake | Permit status: Closed | Completion date: October 26, 2015 | Permit id: 2015-256104-000 | |||||
Power - pps mail order removation; remodel mezzanine area, main floor, remove add some walls, doors, remove overhead doors infill with glass windows, restroom work, new conveyor system, penetrate wall for new personnel door, concrete work, ceiling, elec, plbg, finishes Date: October 27, 2015Permit type: Intake | Permit status: Closed | Completion date: October 27, 2015 | Permit id: 2015-257043-000 | |||||
Voice data, cameras, access - pps mail order renovation; remodel mezzanine area, main floor, remove add some walls, doors, remove overhead doors infill with glass windows, restroom work, new conveyor system, penetrate wall for new personnel door, concrete work, ceiling, elec, plbg, finishes Date: December 17, 2015Permit type: Intake | Permit status: Closed | Completion date: December 17, 2015 | Permit id: 2015-278362-000 | |||||
Fire alarm - pps mail order renovation; remodel mezzanine area, main floor, remove add some walls, doors, remove overhead doors infill with glass windows, restroom work, new conveyor system, penetrate wall for new personnel door, concrete work, ceiling, elec, plbg, finishes Date: January 26, 2016Permit type: Intake | Permit status: Closed | Completion date: January 26, 2016 | Permit id: 2016-110995-000 | |||||
F12 mo-3 5th floor office reconfiguration-demo existing office walls, casework and flooring, reinstall walls, casework for new office configuration, elec. Date: April 7, 2016Permit type: Reviews | Permit status: Approved | Completion date: April 7, 2016 | Permit id: 2016-147790-000 | |||||
F1 racking - 12 in height Permit type: Intake | Permit status: Closed | Completion date: April 14, 2016 | Permit id: 2016-152640-000 | |||||
2 sf trash enclosure on west side, including metal framed roof, drain, privacy slats, swinging doors and interior lighting Permit type: Application | Permit status: Approved | Completion date: April 5, 2013 | Permit id: 2013-136510-000 | |||||
2 sf trash enclosure on west side, including metal framed roof, drain, privacy slats, swinging doors and interior lighting Permit type: Environmental services | Permit status: Approved | Completion date: April 5, 2013 | Permit id: 2013-136510-000 | |||||
2 sf trash enclosure on west side, including metal framed roof, drain, privacy slats, swinging doors and interior lighting Permit type: Transportation | Permit status: Closed | Completion date: April 5, 2013 | Permit id: 2013-136510-000 | |||||
2 sf trash enclosure on west side, including metal framed roof, drain, privacy slats, swinging doors and interior lighting Permit type: Transportation | Permit status: Approved | Completion date: April 5, 2013 | Permit id: 2013-136510-000 | |||||
2 sf trash enclosure on west side, including metal framed roof, drain, privacy slats, swinging doors and interior lighting Permit type: Water bureau review | Permit status: Not reqd | Completion date: April 5, 2013 | Permit id: 2013-136510-000 | |||||
F22 fmm03 - replacement of 85 fan powered variable air volume (vav) boxes. Like for like in same locations over five floors Date: March 3, 2015Permit type: Intake | Permit status: Closed | Completion date: February 10, 2015 | Permit id: 2015-117573-000 | |||||
Request for a land use compatibility statement. Permit type: Land use review | Permit status: Closed | Completion date: April 24, 2015 | Permit id: 2015-154719-000 | |||||
Request for a land use compatibility statement. Permit type: Land use review | Permit status: Letter sent | Completion date: May 27, 2015 | Permit id: 2015-154719-000 | |||||
F6 fred meyer main office 1, replace failed 15 ton rtu with new 15 ton unit with gas heat Date: May 21, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 21, 2015 | Permit id: 2015-174191-000 | |||||
B1 main office #4 door lock upgrade Date: May 22, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 22, 2015 | Permit id: 2015-175088-000 | |||||
F11 install 2 ton ductless roof top air conditioner and outside air ventilation for elevator hvac Date: June 11, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 11, 2015 | Permit id: 2015-184398-000 | |||||
F14 replace 79 like for like vav boxes Date: July 6, 2015Permit type: Reviews | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-196611-000 | |||||
Emergency response to tree failure Permit type: C - emergency | Permit status: Emergency resolved/follow | Completion date: July 9, 2015 | Permit id: 2015-197216-000 | |||||
Replace existing concrete stair with steel stair Date: March 17, 2000Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: May 1, 2000 | Current use: Business | Permit id: 2000-140005-000 | |||||
Adding new wall per fire marshall, to separate propane hyster from employee seating smoking area. Date: May 11, 2000Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Issued | Current use: Business | Permit id: 2000-148254-000 |