ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Final stream and wetlands mitigation plan for the shops at dakota crossing. Excavation and proposed stream and wetlands mitigation site. Date: July 2, 2012Client: Fort Lincoln Retail, Llc Co Trammell Crow Co. | Applicant: Fort Lincoln Re C/o Trammell Crow Co.; David Fontana Mckeever Services Corp. | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1200045 | |||||
Drill 28 geotechnical soil test borings to feet and 7 gas probe monitoring wells to feet below the existing ground surface using six-inch hollow stem augers. All geotechnical borings will be abandoned on the same day of work. The gas probe monitoring wells will be abandoned two days after drilling is complete. All work will be conducted as per attached work plan and boring schematics. Date: November 27, 2013Client: Poc: Ivan Matthews Goverment Of The District Of Columbia | Applicant: Poc: Josh April Geoconcepts Engineering, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400065 | |||||
SCORE 56 Final stream and wetlands mitigation plan for the shops at dakota crossing. Excavation and proposed stream and wetlands mitigation site. Date: July 2, 2012Client: Fort Lincoln Retail, Llc Co Trammell Crow Co. | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1200045 | |||||
SCORE 56 Drill 28 geotechnical soil test borings to feet and 7 gas probe monitoring wells to feet below the existing ground surface using six-inch hollow stem augers. All geotechnical borings will be abandoned on the same day of work. The gas probe monitoring wells will be abandoned two days after drilling is complete. All work will be conducted as per attached work plan and boring schematics. Date: November 27, 2013 Contractor: Poc: Josh April Geoconcepts Engineering IncClient: Poc: Ivan Matthews Goverment Of The District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400065 | |||||
SCORE 62 Final stream and wetlands mitigation plan for the shops at dakota crossing. Excavation and proposed stream and wetlands mitigation site. Date: July 2, 2012Client: Fort Lincoln Retail, Llc C O Trammell Crow Co. | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1200045 | |||||
SCORE 56 Drill 28 geotechnical soil test borings to feet and 7 gas probe monitoring wells to feet below the existing ground surface using six-inch hollow stem augers. All geotechnical borings will be abandoned on the same day of work. The gas probe monitoring wells will be abandoned two days after drilling is complete. All work will be conducted as per attached work plan and boring schematics. Date: November 27, 2013 Contractor: Poc: Josh April Geoconcepts Engineering, IncClient: Poc: Ivan Matthews Goverment Of The District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400065 |