ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Drill and sample 6 borings on the site. The borings will be drilled using a hollow stem auger and truck mount or track mounted drill rig. The borings are expected to be advanced about below the ground surface or to refusal. During the course of the field investigation, sampling will be collected by either the standard penetration (spt) split spoon sampler or with the core barrel sampler Date: May 22, 2013Client: Dc Department Of Public Works | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300227 | |||||
Drill and sample 6 borings on the site. The borings will be drilled using a hollow stem auger and truck mount or track mounted drill rig. The borings are expected to be advanced about below the ground surface or to refusal. During the course of the field investigation, sampling will be collected by either the standard penetration (spt) split spoon sampler or with the core barrel sampler Date: May 22, 2013Client: Dc Department Of Public Works | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300227 | |||||
Drill and sample 6 borings on the site. The borings will be drilled using a hollow stem auger and truck mount or track mounted drill rig. The borings are expected to be advanced about below the ground surface or to refusal. During the course of the field investigation, sampling will be collected by either the standard penetration (spt) split spoon sampler or with the core barrel sampler Date: May 22, 2013Client: Dc Department Of Public Works | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300227 | |||||
Drill and sample 6 borings on the site. The borings will be drilled using a hollow stem auger and truck mount or track mounted drill rig. The borings are expected to be advanced about below the ground surface or to refusal. During the course of the field investigation, sampling will be collected by either the standard penetration (spt) split spoon sampler or with the core barrel sampler Date: May 22, 2013Client: Dc Department Of Public Works | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300227 |