Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 84 New high pile storage racks Engineer: Nathan Bissonnltte P. E. | Engineer Phone: (310) 260-2537 | Applicant: Landeros Tony | Applicant Phone: (714) 223-6844 | Permit id: 1404100047 | |||||
SCORE 77 Installation 0f conveyer Engineer: Seizmic | Engineer Phone: (909) 869-0989 | Applicant: Gina Schisel | Applicant Phone: (909) 228-8086 | Permit id: 1301180014 | |||||
SCORE 84 New high pile storage racks Engineer: Nathan Bissonnltte P. E. | Engineer Phone: (310) 260-2537 | Applicant: Landeros Tony | Applicant Phone: (714) 223-6844 | Permit id: 1404100047 | |||||
SCORE 100 Tenant improvement for 1120-fixtures & 2-100amp,3-200amp & 1-400amp service panels Date: January 6, 2012 Contractor: Oltmans Construction Engineer: Nam Yong | Applicant: Rushlow Jason | Permit status: Finaled | Completion date: March 8, 2012 | Expiration date: January 5, 2013 | Permit id: 1110200036 | |||||
SCORE 100 Tenant improvemnt;39-fixtures Date: January 6, 2012 Contractor: Oltmans Construction Engineer: American Contractor Inc. * | Applicant: Alan Graham | Permit status: Finaled | Completion date: March 8, 2012 | Expiration date: January 5, 2013 | Permit id: 1109270015 | |||||
SCORE 88 Install cord drops-temp. Work benches wire cardboard bailer Date: October 26, 2012 Contractor: Dans Electric Inc Applicant: Spangler Jeff | Permit status: Finaled | Completion date: November 9, 2012 | Expiration date: October 26, 2013 | Permit id: 1210260004 | |||||
SCORE 88 Power to new conveyor system & general use Date: May 3, 2013 Contractor: Dans Electric Inc Engineer: Dmi Engineers | Applicant: Freddy Iyengar | Permit status: Permisud | Expiration date: May 3, 2014 | Permit id: 1301240042 | |||||
SCORE 66 682 sq ft lunch room expansion. Date: February 26, 2013 Contractor: Rj Miller Construction Applicant: Gina Schisel | Permit status: Finaled | Completion date: May 2, 2013 | Expiration date: February 26, 2014 | Permit id: 1301310024 | |||||
SCORE 56 Electrical conveyor system & general use Date: May 30, 2013 Contractor: Inc Electrical Design And Motor Control Engineer: Seizmic Engineering | Applicant: Gina Schisel | Permit status: Permisud | Expiration date: May 30, 2014 | Permit id: 1301310052 | |||||
SCORE 87 Install 21 exhaust fans Date: May 10, 2013 Contractor: Danco Companies Engineer: Plump Engineering | Applicant: Spangler Dan | Permit status: Permisud | Expiration date: May 10, 2014 | Permit id: 1305100004 | |||||
SCORE 86 Install generator & ats for back-up power Date: July 10, 2014 Contractor: Gammill Electric Engineer: A And F Engineering | Applicant: Paul Rasmussen | Permit status: Finaled | Completion date: December 10, 2014 | Expiration date: July 10, 2015 | Permit id: 1312230029 | |||||
SCORE 86 600a 480v panel w 5kv Date: August 6, 2014 Contractor: Gammill Electric Engineer: Gregory Panek | Applicant: Paul Rasmussen | Permit status: Finaled | Completion date: August 18, 2014 | Expiration date: August 6, 2015 | Permit id: 1404290027 | |||||
SCORE 77 Installation of electrical for conveyor supports. Date: September 8, 2014 Contractor: Fletchline Inc Engineer: Nathan Bissonnltte P. E. | Applicant: Gina Schisel | Permit status: Finaled | Completion date: September 16, 2014 | Expiration date: September 8, 2015 | Permit id: 1405010029 | |||||
SCORE 77 Lighting for storage racks Date: June 19, 2014 Contractor: Electrical Work Inc Engineer: Nathan Bissonnltte P. E. | Applicant: John Reuter | Permit status: Finaled | Completion date: September 5, 2014 | Expiration date: June 19, 2015 | Permit id: 1406180032 | |||||
SCORE 86 Install (2) 3 phase 480v 2 a ckts to feed control panels cc-7 & cc-11 from pl deb Date: July 21, 2014 Contractor: Gammill Electric Engineer: Gregory Panek | Applicant: Paul Rasmussen | Permit status: Finaled | Completion date: December 10, 2014 | Expiration date: July 21, 2015 | Permit id: 1407210036 | |||||
SCORE 86 Install (2) 150v 2 a ckts & 90a for new load center cc-8 & cc-9 Date: August 11, 2014 Contractor: Gammill Electric Engineer: Gregory Panek | Applicant: Paul Rasmussen | Permit status: Finaled | Completion date: August 18, 2014 | Expiration date: August 11, 2015 | Permit id: 1408110053 | |||||
SCORE 59 Us field evaluation (2) pieces of equipment report #2763636 master contract # 262068 Date: October 21, 2014 Contractor: Csa Group Applicant: Csa Group | Permit status: Finaled | Completion date: March 24, 2015 | Expiration date: October 21, 2015 | Permit id: 1410210050 | |||||
SCORE 77 Install circulation fan through out the ware house Date: November 6, 2014 Contractor: Electrical Work Inc Applicant: Jon Thomas Reuter | Permit status: Finaled | Completion date: January 26, 2015 | Expiration date: November 6, 2015 | Permit id: 1411060056 | |||||
SCORE 70 Electrical for (2) roof top a/c units Date: May 20, 2015 Contractor: B D B Inc Applicant: Steve Morini | Permit status: Finaled | Completion date: July 14, 2015 | Expiration date: May 19, 2016 | Permit id: 1505200045 | |||||
SCORE 62 Install 800a, 480v distribution board for forklift chargers Date: November 6, 2015 Contractor: Morrow Meadows Applicant: Medina Sergio | Permit status: Finaled | Completion date: December 30, 2015 | Expiration date: November 5, 2016 | Permit id: 1508240048 | |||||
SCORE 98 Rooftop exhaust fan Date: July 6, 2004 Contractor: Thermalair Inc Applicant: Thermalair, Inc | Permit status: Finaled | Completion date: March 4, 2005 | Expiration date: January 2, 2005 | Permit id: 407060021 | |||||
SCORE 100 Mechanical for new office t. I. (4211 sq. Ft.) & office addition at existing office(1192 sq. Ft.) Date: January 6, 2012 Contractor: Oltmans Construction Engineer: Hpa | Applicant: Willcutt Roger | Permit status: Finaled | Completion date: March 8, 2012 | Expiration date: January 5, 2013 | Permit id: 1111300016 | |||||
SCORE 86 Replaceing 2. 5 ton unit on roof w/new 5-ton unit for lunch- room expansion. Date: February 15, 2013 Contractor: Thermal Air Inc Engineer: Yong Nam | Applicant: Roger Willcutt | Permit status: Finaled | Completion date: May 2, 2013 | Expiration date: February 15, 2014 | Permit id: 1301220014 | |||||
SCORE 98 (2) platforms for (2) new rooftop a/c units. Date: May 13, 2015 Contractor: Thermalair Inc Applicant: Steve Morini | Permit status: Finaled | Completion date: July 14, 2015 | Expiration date: May 12, 2016 | Permit id: 1505130006 | |||||
SCORE 56 Lot line adjustment to facilitate the eventual sale of the property Date: June 5, 2008 Contractor: Kenneth Quan Applicant: Quan Kenneth | Permit status: Finaled | Completion date: June 20, 2008 | Expiration date: December 2, 2008 | Permit id: 806050002 | |||||
Lot line adjustment. Date: September 23, 2014 Applicant: Same As Owner | Permit status: Finaled | Completion date: September 24, 2014 | Expiration date: March 22, 2015 | Permit id: 1409230001 | |||||
SCORE 100 For bl#0305150066 Date: May 3, 2004 Contractor: American Contractors Applicant: American Contractors | Permit status: Finaled | Completion date: September 30, 2005 | Expiration date: October 30, 2004 | Permit id: 405030016 | |||||
SCORE 69 Landscape backflow devices - bldg b Date: November 10, 2004 Contractor: Hunter Landscape Applicant: Hunter Landscape | Permit status: Finaled | Completion date: September 30, 2005 | Expiration date: May 9, 2005 | Permit id: 411100032 | |||||
SCORE 99 For bl #0505250106 Date: August 12, 2005 Contractor: American Contractors Inc Applicant: American Contractors | Permit status: Finaled | Completion date: September 26, 2005 | Expiration date: February 8, 2006 | Permit id: 508120001 | |||||
SCORE 100 3-fixtures for lunch room Date: February 28, 2013 Contractor: American Contractors Engineer: Yong Nam | Applicant: American Contractors | Permit status: Finaled | Completion date: May 2, 2013 | Expiration date: February 28, 2014 | Permit id: 1302280005 | |||||
SCORE 100 New warehouse shell Applicant: Chang Insik | Permit status: Finaled | Completion date: September 30, 2005 | Expiration date: April 24, 2005 | Permit id: 305150066 | |||||
SCORE 100 Foundation only-bldg b Applicant: Oltmans Construction | Permit status: Finaled | Completion date: September 30, 2005 | Expiration date: February 4, 2005 | Permit id: 402100045 | |||||
SCORE 98 Fire sprinklers Applicant: Chu Yim | Permit status: Finaled | Completion date: September 30, 2005 | Expiration date: July 17, 2005 | Permit id: 402120056 | |||||
SCORE 64 Installation of methane barrier Applicant: Allwest Remediation | Permit status: Finaled | Completion date: September 30, 2005 | Expiration date: March 11, 2005 | Permit id: 403160001 | |||||
SCORE 59 Storage racks Applicant: Interlake Material Handling | Permit status: Permisud | Expiration date: July 2, 2006 | Permit id: 506170021 | |||||
SCORE 82 Alteration of existing fire sprinklers for office area Applicant: Carden Sprinklers | Permit status: Finaled | Completion date: September 26, 2005 | Expiration date: July 24, 2006 | Permit id: 507290033 | |||||
SCORE 91 Horizontal lpg tank Applicant: 51-R Electric | Permit status: Finaled | Completion date: October 11, 2005 | Expiration date: September 10, 2006 | Permit id: 509150021 | |||||
SCORE 83 Formica letters non-illuminated Applicant: Professional Sign Installers | Permit status: Finaled | Completion date: June 23, 2008 | Expiration date: July 22, 2008 | Permit id: 801240010 | |||||
SCORE 77 Adding (1) sprinkler head to office area. Applicant: Michael Matsui | Permit status: Finaled | Completion date: May 21, 2010 | Expiration date: May 4, 2011 | Permit id: 1005040029 | |||||
SCORE 77 Install (45) q. R. Ssp heads in new light hazard office t. I. Applicant: Michael Matsui | Permit status: Finaled | Completion date: March 8, 2012 | Expiration date: October 25, 2012 | Permit id: 1110260048 | |||||
SCORE 100 Tenant improvement for new office(4211 sq. Ft.) & office addition at existing office(1192 sq. Ft.) Engineer: Nam Yong | Applicant: Galindo Chris | Permit status: Finaled | Completion date: March 8, 2012 | Expiration date: January 5, 2013 | Permit id: 1111010080 | |||||
SCORE 99 Storage racks - 25 in height Engineer: Structural Concepts Engineering | Applicant: Martinez John | Permit status: Finaled | Completion date: March 8, 2012 | Expiration date: December 12, 2012 | Permit id: 1111100053 | |||||
SCORE 66 682 sq ft lunch room expansion. Engineer: Yong Nam | Applicant: Chris Galindo | Permit status: Finaled | Completion date: May 2, 2013 | Expiration date: February 26, 2014 | Permit id: 1208030011 | |||||
SCORE 99 High pile storage racks 25 in height. Engineer: Structural Concepts Engineering | Applicant: John Martinez | Permit status: Finaled | Completion date: November 9, 2012 | Expiration date: September 20, 2013 | Permit id: 1208230061 | |||||
SCORE 61 New footing pads for future use. Engineer: Sal Fateen P. E. | Applicant: Gina Schisel | Permit status: Permisud | Expiration date: January 15, 2014 | Permit id: 1212170003 | |||||
SCORE 77 Installation 0f conveyer Engineer: Seizmic, Inc. | Applicant: Gina Schisel | Permit status: Permisud | Expiration date: May 30, 2014 | Permit id: 1301180014 | |||||
SCORE 75 Installation of platform Engineer: Seizmic, Inc. | Applicant: Gina Schisel | Permit status: Permisud | Expiration date: February 28, 2014 | Permit id: 1301180017 | |||||
SCORE 86 New supporting deck for roof top a/c unit. Engineer: Yong Nam | Applicant: Roger Willcutt | Permit status: Finaled | Completion date: May 2, 2013 | Expiration date: February 15, 2014 | Permit id: 1302150001 | |||||
SCORE 59 Reinstall 11 gallon propane tank. Engineer: Ernest J De Leon | Applicant: Arlene Bishop | Permit status: Finaled | Completion date: April 25, 2013 | Expiration date: April 8, 2014 | Permit id: 1303260022 | |||||
SCORE 90 Relocate (4) sprinkler heads & add (4) new sprinkler heads. Engineer: Fred Golnargni | Applicant: Priscilla Herrera | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303270024 | |||||
SCORE 86 New concrete pad 8 sq ft & pour in place 16 wall for new stand by generator system. Engineer: Gregory Panek | Applicant: Paul Rasmussen | Permit status: Finaled | Completion date: December 10, 2014 | Expiration date: July 10, 2015 | Permit id: 1401140036 | |||||
SCORE 84 New high pile storage racks Engineer: Nathan Bissonnltte P. E. | Applicant: Landeros Tony | Permit status: Finaled | Completion date: September 10, 2014 | Expiration date: June 9, 2015 | Permit id: 1404100047 | |||||
SCORE 77 Installation of conveyor supports Engineer: Seizmic | Applicant: Schiszl Gina | Permit status: Finaled | Completion date: September 10, 2014 | Expiration date: August 5, 2015 | Permit id: 1405020005 | |||||
SCORE 98 (2) platforms for (2) new rooftop a/c units. Applicant: Steve Morini | Permit status: Finaled | Completion date: July 14, 2015 | Expiration date: May 12, 2016 | Permit id: 1505130020 | |||||
SCORE 98 New warehouse shell. Bldg b. Date: September 29, 2004 Contractor: Gregg Electric Engineer: Hpa | Applicant: David Fehlman | Permit status: Finaled | Completion date: September 30, 2005 | Expiration date: March 28, 2005 | Permit id: 307210045 | |||||
SCORE 100 For bl #0505250106 Date: August 10, 2005 Contractor: Oltmans Construction Applicant: Oltmans Construction Co | Permit status: Finaled | Completion date: September 26, 2005 | Expiration date: February 6, 2006 | Permit id: 508100016 | |||||
SCORE 91 Horizontal lpg tank Date: October 11, 2005 Contractor: 51r Electric Applicant: 51-R Electric | Permit status: Finaled | Completion date: October 11, 2005 | Expiration date: April 9, 2006 | Permit id: 510110008 | |||||
SCORE 77 Installation of conveyor supports Engineer: Seizmic | Engineer Phone: (909) 869-0986 | Applicant: Schiszl Gi | Applicant Phone: (909) 228-8086 | Permit id: 1405020005 | |||||
SCORE 86 New concrete pad 860 sq ft & pour in place 16 wall for new stand by generator system. Engineer: Gregory Panek | Engineer Phone: (714) 385-1835 | Applicant: Paul Rasmussen | Applicant Phone: (626) 812-4515 | Permit id: 1401140036 | |||||
SCORE 87 Replace 21 skylights w 21 exhaust fans Engineer: Plump Engineering | Engineer Phone: (714) 385-1835 | Applicant: Spangler Dan | Applicant Phone: (626) 966-5401 | Permit id: 1304110047 | |||||
SCORE 75 Installation of platform Engineer: Seizmic | Engineer Phone: (909) 869-0989 | Applicant: Gina Schisel | Applicant Phone: (909) 228-8086 | Permit id: 1301180017 | |||||
SCORE 66 682 sq ft lunch room expansion. Engineer: Yong Nam | Engineer Phone: (949) 862-2132 | Applicant: Chris Galindo | Applicant Phone: (949) 862-2112 | Permit id: 1208030011 | |||||
SCORE 61 New footing pads for future use. Engineer: Sal Fateen | Engineer Phone: (909) 869-0989 | Applicant: Gina Schisel | Applicant Phone: (909) 228-8086 | Permit id: 1212170003 | |||||
SCORE 99 High pile storage racks 25 in height. Engineer: Structural Concepts Engineering | Engineer Phone: (714) 632-7330 | Applicant: John Martinez | Applicant Phone: (714) 269-8693 | Permit id: 1208230061 | |||||
SCORE 56 Storage racks Applicant: Interlake Material Handling | Permit status: Permisud | Expiration date: July 2, 2006 | Permit id: 506170021 | |||||
SCORE 75 Alteration of existing fire sprinklers for office area Applicant: Carden Sprinklers | Permit status: Finaled | Completion date: September 26, 2005 | Expiration date: July 24, 2006 | Permit id: 507290033 | |||||
SCORE 65 Installation 0f conveyer Engineer: Seizmic, Inc. | Applicant: Gina Schisel | Permit status: Permisud | Expiration date: May 30, 2014 | Permit id: 1301180014 | |||||
SCORE 74 New supporting deck for roof top a c unit. Engineer: Yong Nam | Applicant: Roger Willcutt | Permit status: Finaled | Completion date: May 2, 2013 | Expiration date: February 15, 2014 | Permit id: 1302150001 | |||||
SCORE 90 Relocate (4) sprinkler heads & add (4) new sprinkler heads. Engineer: Fred Golnargni | Applicant: Priscilla Herrera | Permit status: Permisud | Expiration date: March 28, 2014 | Permit id: 1303270024 | |||||
SCORE 65 Installation of conveyor supports Engineer: Seizmic | Applicant: Schiszl Gina | Permit status: Finaled | Completion date: September 10, 2014 | Expiration date: August 5, 2015 | Permit id: 1405020005 | |||||
SCORE 88 (2) platforms for (2) new rooftop a c units. Applicant: Steve Morini | Permit status: Finaled | Completion date: July 14, 2015 | Expiration date: May 12, 2016 | Permit id: 1505130020 | |||||
SCORE 80 Install cord drops-temp. Work benches wire cardboard bailer Date: October 26, 2012 Contractor: Dans Electric, Inc Applicant: Spangler Jeff | Permit status: Finaled | Completion date: November 9, 2012 | Expiration date: October 26, 2013 | Permit id: 1210260004 | |||||
SCORE 80 Power to new conveyor system & general use Date: May 3, 2013 Contractor: Dans Electric, Inc Engineer: Dmi Engineers | Applicant: Freddy Iyengar | Permit status: Permisud | Expiration date: May 3, 2014 | Permit id: 1301240042 | |||||
SCORE 65 Installation of electrical for conveyor supports. Date: September 8, 2014 Contractor: Fletchline, Inc Engineer: Nathan Bissonnltte P. E. | Applicant: Gina Schisel | Permit status: Finaled | Completion date: September 16, 2014 | Expiration date: September 8, 2015 | Permit id: 1405010029 | |||||
SCORE 76 Lighting for storage racks Date: June 19, 2014 Contractor: Electrical Work, Inc Engineer: Nathan Bissonnltte P. E. | Applicant: John Reuter | Permit status: Finaled | Completion date: September 5, 2014 | Expiration date: June 19, 2015 | Permit id: 1406180032 | |||||
SCORE 76 Install circulation fan through out the ware house Date: November 6, 2014 Contractor: Electrical Work, Inc Applicant: Jon Thomas Reuter | Permit status: Finaled | Completion date: January 26, 2015 | Expiration date: November 6, 2015 | Permit id: 1411060056 | |||||
SCORE 76 Electrical for (2) roof top a c units Date: May 20, 2015 Contractor: B D B, Inc Applicant: Steve Morini | Permit status: Finaled | Completion date: July 14, 2015 | Expiration date: May 19, 2016 | Permit id: 1505200045 | |||||
SCORE 88 Rooftop exhaust fan Date: July 6, 2004 Contractor: Thermalair, Inc Applicant: Thermalair, Inc | Permit status: Finaled | Completion date: March 4, 2005 | Expiration date: January 2, 2005 | Permit id: 407060021 | |||||
SCORE 74 Replaceing 2. 5 ton unit on roof w new 5-ton unit for lunch- room expansion. Date: February 15, 2013 Contractor: Thermal Air, Inc Engineer: Yong Nam | Applicant: Roger Willcutt | Permit status: Finaled | Completion date: May 2, 2013 | Expiration date: February 15, 2014 | Permit id: 1301220014 | |||||
SCORE 88 (2) platforms for (2) new rooftop a c units. Date: May 13, 2015 Contractor: Thermalair, Inc Applicant: Steve Morini | Permit status: Finaled | Completion date: July 14, 2015 | Expiration date: May 12, 2016 | Permit id: 1505130006 | |||||
SCORE 100 For bl#0305150066 Date: May 3, 2004 Contractor: American Contractors Applicant: American Contractors | Permit status: Finaled | Completion date: September 30, 2005 | Expiration date: October 30, 2004 | Permit id: 405030016 | |||||
SCORE 94 For bl #0505250106 Date: August 12, 2005 Contractor: American Contractors, Inc Applicant: American Contractors | Permit status: Finaled | Completion date: September 26, 2005 | Expiration date: February 8, 2006 | Permit id: 508120001 | |||||
SCORE 100 T. I. /general merchandise wholesale import/export Applicant: Oltmans Construction Co | Permit status: Finaled | Completion date: September 26, 2005 | Expiration date: August 5, 2006 | Permit id: 505250106 | |||||
SCORE 87 Replace 21 skylights w/21 exhaust fans Engineer: Plump Engineering | Applicant: Spangler Dan | Permit status: Permisud | Expiration date: May 10, 2014 | Permit id: 1304110047 | |||||
SCORE 73 Replace (e) rooftop a/c unit with new 7 lb (4 ton) no new duct work. Applicant: Jeff Peo | Permit status: Finaled | Completion date: December 30, 2015 | Expiration date: October 14, 2016 | Permit id: 1510150058 | |||||
SCORE 82 High pile storage racks (21,5 sq ft). Engineer: Structural Concepts Engineering | Applicant: John P Ramirez | Permit status: Permisud | Expiration date: February 18, 2017 | Permit id: 1503020085 | |||||
SCORE 100 Remove (2) exist address signs & replace w new address & logo signs (non-illuminated). Applicant: Jorge Diaz | Permit status: Finaled | Completion date: July 14, 2016 | Expiration date: May 5, 2017 | Permit id: 1605050052 | |||||
SCORE 73 Replace 4 ton a/c rooftop unit. Date: October 15, 2015 Contractor: White Mechanical Applicant: Jeff Peo | Permit status: Finaled | Completion date: December 30, 2015 | Expiration date: October 14, 2016 | Permit id: 1510150019 | |||||
SCORE 86 Install misc. Circuits for outlets, ceiling fans, trash compactor, battery chargers & conveyor control panel. Date: May 26, 2015 Contractor: Gammill Electric Applicant: Paul Rasmussen | Permit status: Finaled | Completion date: July 14, 2015 | Expiration date: May 25, 2016 | Permit id: 1505260028 |