ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Basement: pump out all sewage and stagnant water in basement; vacuum dry, broom sweep and sanitize accordingly. Remove all work related debris. Date: December 22, 2010Permit type: Stopag | Permit id: Eb17884 | |||||
Public hall stairs: replace with new the (7) seven missing balusters at balustrade at public hall stairs between 1st and 2nd floors. Date: August 27, 2009 Value: $264Permit type: Gc | Permit id: Ea08066 | |||||
Basement boiler room : replace the hot water temperature controll system and make neceesary repairs to restore adequate hot water to apt#2fl apt fauce Date: May 27, 2011Permit type: Heat | Permit id: Eb32654 | |||||
Provide and install gwb approx. 30sf at bathrm ceiling. Tape compound prime and paint. Xrf tested neg. Remove all work related debris. Date: June 25, 2010Permit type: Gc | Permit id: Ea39039 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: July 7, 2010Permit type: Delead | Permit id: Eb01435 | |||||
Trace and repair defective sparking electrical wiring at ceiling light fixture at rm e-4. Remove all work related debris. Non s. W. P. Not Date: June 24, 2010Permit type: Elec | Permit id: Ea39043 |