ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Heavy-up Date: June 22, 2006Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 425226 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: October 13, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: November 22, 2015 | Current use: Single family dwelling | Permit id: 691112 | |||||
Geothermal system well permit #692483 Date: November 24, 2014Permit type: Mechanical permit | Permit status: Finaled | Completion date: November 22, 2015 | Current use: Single family dwelling | Permit id: 695658 | |||||
Deck Date: October 17, 2014 Value: $10,000Permit type: Building residential | Permit status: Finaled | Completion date: November 19, 2015 | Current use: Deck | Permit id: 691741 | |||||
Addition family room-kitchen-garage Date: February 28, 2014 Value: $900,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 659840 | |||||
Replacegas service in accordance with washington gas plan no. 391874. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: February 13, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 330292 | |||||
Update existing 2 ampoverhead residential service to 4 amp urd and associated equipment in accordance with pepco plan no. 3454854. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: August 4, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 319386 |