ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
As per secondary rc #2002001188305 (emsl), perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw845-3050 Date: April 22, 2003Permit type: Delead | Permit id: E320985 | |||||
Apt _a3_: as per the requierment contract with hpd, provide and install 3 window guards and repair 4 throughout entire apartment. Remove all work r Date: April 8, 2014Permit type: Gc | Permit id: Ee19653 | |||||
(apt#3-d) install (5) window guards complete. (5) throughout the entire apartment. Rc# ka00794 note: contractor must contact h. P. D. @ (718) Date: November 6, 2009Permit type: Gc | Permit id: Ea14999 | |||||
Apartment# b2: demo - patch plaster ceiling and wall. Prime and paint same area in bedroom sqft. Note: contractor must call lydia santos a Date: November 20, 2001Permit type: Gc | Permit id: E208186 | |||||
Apt b2: as per the requirement contract with hpd, provide and install 5 window guards throughout entire apartment. Remove all work related debris Date: May 29, 2013Permit type: Gc | Permit id: Ed22936 | |||||
Perform total lead analysis of 14 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: May 2, 2013Permit type: Delead | Permit id: Ed21873 | |||||
As per rc #20080000875 (i. A. T. L.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 me Date: December 4, 2007Permit type: Delead | Permit id: E813733 | |||||
As per rc #20080000875 (i. A. T. L.), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 me Date: January 30, 2008Permit type: Delead | Permit id: E821060 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: November 14, 2012Permit type: Delead | Permit id: Ed09944 | |||||
Apt 1a: as per the requirements contract with hpd provide and install (4) window guards and repair (1) throughout Date: September 28, 2012Permit type: Gc | Permit id: Ed06847 | |||||
As per rc #20080000875 (i. A. T. L.), perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 me Date: February 8, 2008Permit type: Delead | Permit id: E821977 | |||||
(bkwest) local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-20 Date: December 6, 2007Permit type: Delead | Permit id: E813726 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: October 4, 2012Permit type: Delead | Permit id: Ed07450 | |||||
Make all necessary repairs to duel #2 oil and gas boiler to restore to good working condition. Restore hot water to building. Note: contract Permit type: Heat | Permit id: E104018 | |||||
Make all necessary repairs to duel #2 oil and gas boiler to restore to good working condition. Restore hot water to building. Note: contract Permit type: Heat | Permit id: E104018 | |||||
Make all necessary repairs to duel #2 oil and gas boiler to restore to good working condition. Restore hot water to building. Note: contract Permit type: Heat | Permit id: E104018 | |||||
Make all necessary repairs to duel #2 oil and gas boiler to restore to good working condition. Restore hot water to building. Note: contract Permit type: Heat | Permit id: E104018 | |||||
Make all necessary repairs to duel #2 oil and gas boiler to restore to good working condition. Restore hot water to building. Note: contract Permit type: Heat | Permit id: E104018 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 16, 2010Permit type: Delead | Permit id: Ea38855 | |||||
At apt b3: bathroom at apt # b3: trace, locate and repair concealed leak coming from bathroom above apt # b3. At bathroom: remove mold from walls Date: May 19, 2010Permit type: Gc | Permit id: Ea35588 | |||||
Apt b3: as per the requirement contract with hpd, provide and install 3 window guards and repair 4 throughout apartment. Remove all work related Date: March 28, 2014Permit type: Gc | Permit id: Ee20327 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 10, 2010Permit type: Delead | Permit id: Ea38422 | |||||
R/c 20141419802 apt d3: as per the requirement contract with hpd, provide and install 2 window guards and repair 1 throughout entire apartment. Date: September 11, 2014Permit type: Gc | Permit id: Ef05885 | |||||
Perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: September 26, 2014Permit type: Delead | Permit id: Ef07400 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: September 15, 2014Permit type: Delead | Permit id: Ef06588 | |||||
R c 20141419802 apt d3: as per the requirement contract with hpd, provide and install 2 window guards and repair 1 throughout entire apartment. Date: September 11, 2014Permit type: Gc | Permit id: Ef05885 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: December 23, 2009Permit type: Delead | Permit id: Ea18798 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: December 15, 2009Permit type: Delead | Permit id: Ea18842 | |||||
As per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 11 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: February 3, 2005Permit type: Delead | Permit id: E520417 | |||||
Local law #1 violation : as per rc #20050021129 (abax bk-w,si) and attached scope of work thoroughly remove all lead violations as per new york city Date: January 21, 2005Permit type: Delead | Permit id: E518794 | |||||
As per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: February 24, 2005Permit type: Delead | Permit id: E522450 | |||||
At bulkhead: replace with new (complete) the missing fireproof self-closing door and jamb. Make good to all affected area surrounding door and jamb. M Date: September 8, 2008Permit type: Gc | Permit id: E907474 | |||||
At bulkhead: replace with new (complete) the missing fireproof self-closing door and jamb. Make good to all affected area surrounding door and jamb. Date: March 11, 2009Permit type: Gc | Permit id: E928954 | |||||
Replace marble tread # (1) up intermediate landing 1st to 2nd story public hall 4 l. F. Note:contractor must contact hpd @ (718) 636-3045 or 636-30 Date: November 27, 2002Permit type: Gc | Permit id: E310102 | |||||
Public area: replace marble nosing at stair from west court yard from first stroy public hallway. Note: contractor must contact hpd @ (718) 636-30 Date: June 24, 2004Permit type: Gc | Permit id: E426342 | |||||
Remove broken marble tread on the step 4th story to bulkhead. 7th up and replace with marble tread. Demo defective bulkheadceiling approx. Sqft. Date: June 29, 2000Permit type: Gc | Permit id: E023325 | |||||
Ll- (clean only) thoroughly re-clean the following areas as per new york city health code section 173. 14 and as noted in the scope of work pursuant to Date: September 22, 2014 Value: $328Permit type: Delead | Permit id: Ef07125 | |||||
Apt: Date: June 12, 2010Permit type: Gc | Permit id: Ea38787 | |||||
Apt b4 ) at bathroom install window guard , at livingroom and kitchen install window stops, at bedroom install window stops for 1 window. Date: December 11, 2007 Value: $79Permit type: Gc | Permit id: E814636 | |||||
Apartment# d4: kitchen reinstall 1 w/g and stop. Livingrm reinstall 1 w/g and stop. Bedrm# 1 reinstall 1 w/g and stop. Bedrm# 2 reinstall 1 w/ Date: February 15, 2001 Value: $212Permit type: Gc | Permit id: E116456 | |||||
Reinstall 5 window guards with screws and stop at 1st to 5th story public hall .(one each) Date: December 19, 2000Permit type: Gc | Permit id: E111948 | |||||
Cap sheet approx. 1 sqft. Of roof. Apt.# a4 bdrm #1 cover floor with drop cloth. Demo approx 6 sqft ceiling. Sheetrock ceiling 6 sqft. Pla Date: April 17, 2000 Value: $991Permit type: Gc | Permit id: E020478 | |||||
Apartment# d4: kitchen reinstall 1 w g and stop. Livingrm reinstall 1 w g and stop. Bedrm# 1 reinstall 1 w g and stop. Bedrm# 2 reinstall 1 w Date: February 15, 2001 Value: $212Permit type: Gc | Permit id: E116456 | |||||
Ll- (clean only) thoroughly re-clean the following areas as per new york city health code section 173. 14 and as noted in the scope of work pursuant to Date: July 25, 2017 Value: $196Permit type: Delead | Permit id: Ei01009 | |||||
Apt#2a: provide and install repair window guards throughout apartment. Remove all work related debris. Date: October 6, 2017Permit type: Gc | Permit id: Ei04837 | |||||
R c 20141419802 at p. P as per the requirement contract with hpd, provide and install repair window guards throughout public hall. Remove all Date: August 9, 2017Permit type: Gc | Permit id: Eh20025 | |||||
At roof above apt. # 4a foyer flash seams approx. 8 ft. At apt. # 4a properly repair foyer ceiling approx. 12 sq ft, prime and apply two coats paint Date: July 20, 2010Permit type: Gc | Permit id: Eb04552 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 15, 2010Permit type: Delead | Permit id: Eb09801 | |||||
Perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw8463050b-7000b method utilizing flame atomic absorpt Date: August 4, 2017Permit type: Delead | Permit id: Ei01387 | |||||
Perform total lead analysis of 12 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: July 21, 2017Permit type: Delead | Permit id: Ei00768 | |||||
R c 20141419802 apt.# 2a as per the requirement contract with hpd, provide and install 2 window guards and repair 4 window guards throughout apartm Date: July 20, 2017Permit type: Gc | Permit id: Ei00020 | |||||
Perform total lead analysis of 14 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: July 6, 2017Permit type: Delead | Permit id: Eh20189 |