ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Existing plumbing currently run above grade along the west wall of the house. New work is to move the plumbing off of the west wall and below grade so it will be underneath the finished floor of the basement. Installations per file wheaton basement picture of current main drainage line and proposed location is included in file plumbing adding floor drain by existing hot water heater because no floor drain is present currently adding rough installation of a toilet, sink, and floor drain on the south end of the basement expanding the outer portion of the house to attach existing garage to the house. Current stairwell is too narrow and does not meet code. The additional square footage of the house extending toward existing garage will allow new stairwell to be built to code. Addition is indicated on file site plan and details are in attached engineering drawings in the as built folder. Date: March 29, 2016Permit status: Inspections | Permit id: Bld2016-02055 | |||||
SCORE 56 Replacing sub rough plumbing and adding sub rough plumbing for future bath, Date: February 24, 2016 Contractor: Barnes Plumbing And Excavating IncPermit type: Plumbing | Permit id: Bld2016-01621 | |||||
SCORE 56 Replacing sub rough plumbing and adding sub rough plumbing for future bath, Date: February 24, 2016 Contractor: Barnes Plumbing And Excavating, IncPermit type: Plumbing | Permit id: Bld2016-01621 | |||||
SCORE 82 Please pay balance due. New wiring for addition and replacing cloth ungrounded or unprotected wiring in basement in preparation for finishing. Date: October 6, 2016 Contractor: MrPermit type: Electrical | Permit status: Need info | Permit id: Bld2016-09304 |