ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Curb cut for private drainage installprivatedrainage connection within the county right of way. Curb face will be saw cut to accept a maximum 4 diameter pvc drainage pipe. Concrete epoxy non? Shrink grout will be used to patch the cut curb face. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be complete as directed by the dps row inspector. (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) Date: October 24, 2014Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 324972 |