| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
(use) use premises as a flower shop office a nd 2 dwelling units: 1st floor and basement-flower shop 2nd floor front-office 2nd floor rear- 1 dwelling unit 3rd floor-1 dwelling unit per bmza 2014-378 approved 10/15/2013. Date: September 10, 2014Permit id: Use2014-03456 | |||||
"replacing existing water service 1 1/2"" pipe on private property. Backflow to be installed by another plumber " Date: August 14, 2014 Value: $500Permit id: Com2014-17204 | |||||
Install a 13-d wet pipe sprinkler system as per plans and as per code. Date: May 23, 2014 Value: $80,000Permit id: Com2014-09309 | |||||
Amend permit# com2013-24732 issued on 02/06/14 with plans# 2013-2073 to add electrical contractor as listed above original permit description:(com2013-24732) interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10/1/2013 Date: April 10, 2014Permit id: Com2014-07285 | |||||
Original permit description:(com2013-24732) interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10/1/2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in Date: March 20, 2014Permit id: Com2014-05489 | |||||
Interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10/1/2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in same location with same openings. Replace Date: February 6, 2014 Value: $80,000Permit id: Com2013-24732 | |||||
Continue to use as a florist shop - change of ownership Date: September 25, 2013Permit id: Use2013-03025 | |||||
Exterior work - non-structural alterations - chemical clean & repoint exterior brick as per code. Date: August 15, 2013 Value: $3,700Permit id: Com2013-16646 | |||||
Interior demolition/category 1/non-structural alterations/interior work 1 4 - removal of trash and debris. Removal of old flooring and sheetrock non-structural as per code. (demo only)separate permit will be pulled for tenant fit-out Date: August 5, 2013 Value: $500Permit id: Com2013-16132 | |||||
Interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10/1/2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in same location with same openings. Replace exterior windows and doors. Existing 1st floor commercial space not included) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems. Date: February 6, 2014 Value: $80,000Expiration date: February 6, 2015 | Permit id: Com2013-24732 | |||||
Original permit description:(com2013-24732) interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10/1/2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in same location with same openings. Replace exterior windows and doors. Existing 1st floor commercial space not included) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems. Date: March 20, 2014Expiration date: February 6, 2015 | Permit id: Com2014-05489 | |||||
Amend permit# com2013-24732 issued on 02/06/14 with plans# 2013-2073 to add electrical contractor as listed above original permit description:(com2013-24732) interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10/1/2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in same location with same openings. Replace exterior windows and doors. Existing 1st floor commercial space not included) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems. Date: April 10, 2014Expiration date: February 6, 2015 | Permit id: Com2014-07285 | |||||
Replacing existing water service 1 1/2" pipe on private property. Backflow to be installed by another plumber Date: August 14, 2014 Value: $500Expiration date: February 14, 2015 | Permit id: Com2014-17204 | |||||
Interior fit-out of existing tenant space (into a restaurant per bmza2015-54 approved 4/21/2015) as per plans and as per code. Date: February 2, 2016 Value: $145,000Expiration date: February 2, 2017 | Permit id: Com2015-15538 | |||||
Original permit description:(com2015-15538)interior fit-out of existing tenant space (into a restaurant per bmza2015-54 approved 4/21/2015) as per plans and as per code. Date: March 1, 2016Expiration date: February 2, 2017 | Permit id: Com2016-04978 | |||||
Install wet chemical fire system in exhaust hood as per code Date: October 14, 2016 Value: $4,000Expiration date: April 14, 2017 | Permit id: Com2016-26420 | |||||
Installation of security system Date: September 14, 2016 Value: $399Expiration date: March 13, 2017 | Permit id: Com2016-50195 | |||||
Replacing existing water service 1 1 2" pipe on private property. Backflow to be installed by another plumber Date: August 14, 2014 Value: $500Expiration date: February 14, 2015 | Permit id: Com2014-17204 | |||||
Interior fit-out of existing tenant space (into a restaurant per bmza2015-54 approved 4 21 2015) as per plans and as per code. Date: February 2, 2016 Value: $145,000Expiration date: February 2, 2017 | Permit id: Com2015-15538 | |||||
(use) use premises as a flower shop office a nd 2 dwelling units: 1st floor and basement-flower shop 2nd floor front-office 2nd floor rear- 1 dwelling unit 3rd floor-1 dwelling unit per bmza 2014-378 approved 10 15 2013. Date: September 10, 2014Permit id: Use2014-03456 | |||||
Use portion of premises 1st floor as a restaurant( with liquor license) not including live entertainment and with accessory outdoor seating 3 tables not more than 12 patrons per bmza 2015-54 approved 4 21 15 Date: December 7, 2016Permit id: Use2016-02283 | |||||
Original permit description:(com2015-15538)interior fit-out of existing tenant space (into a restaurant per bmza2015-54 approved 4 21 2015) as per plans and as per code. Date: March 1, 2016Expiration date: February 2, 2017 | Permit id: Com2016-04978 | |||||
Original permit description:(com2013-24732) interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10 1 2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in same location with same openings. Replace exterior windows and doors. Existing 1st floor commercial space not included) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems. Date: March 20, 2014Expiration date: February 6, 2015 | Permit id: Com2014-05489 | |||||
Interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10 1 2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in same location with same openings. Replace exterior windows and doors. Existing 1st floor commercial space not included) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems. Date: February 6, 2014 Value: $80,000Expiration date: February 6, 2015 | Permit id: Com2013-24732 | |||||
Amend permit# com2013-24732 issued on 02 06 14 with plans# 2013-2073 to add electrical contractor as listed above original permit description:(com2013-24732) interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10 1 2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in same location with same openings. Replace exterior windows and doors. Existing 1st floor commercial space not included) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems. Date: April 10, 2014Expiration date: February 6, 2015 | Permit id: Com2014-07285 | |||||
Interior demolition category 1 non-structural alterations interior work 1 4 - removal of trash and debris. Removal of old flooring and sheetrock non-structural as per code. (demo only)separate permit will be pulled for tenant fit-out Date: August 5, 2013 Value: $500Expiration date: February 5, 2014 | Permit id: Com2013-16132 |