ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Add (3) lte panel antennas, (6) radio heads, (1) dc converter, cables, (1) gps antenna, and (1) radio cabinet to existing rooftop wireless facility Date: July 17, 2014Permit type: Application | Permit status: Approved | Completion date: February 6, 2014 | Permit id: 2014-114465-000 | |||||
Rapproval of: a conditional use for a wireless facility, per the approved site plans, exhibits c-1 through c-4, signed and dated july 25, 2014, subject to the following conditions:a. As part of the building permit application submittal, the following development-related conditions (b) must be noted on each of the 4 required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page - case file lu 14-155833 cu. All requirements must be graphically represented on the site plan, landscape, or other required plan and must be labeled required. B. The antennas and associated equipment must be enclosed by shrouds. All shrouds must be painted a color that matches the color of the upper accent band around the roof parapet. Date: July 29, 2014Permit type: Land use review | Permit status: Completed | Completion date: May 15, 2014 | Permit id: 2014-155833-000 | |||||
Upgrade to cell site Date: September 24, 2014Permit type: Intake | Permit status: Closed | Completion date: September 24, 2014 | Permit id: 2014-217328-000 | |||||
Construct new rooftop wireless facility, 16 new antennas in 3 concealed structures, total 4 antenna sectors, relocated equipment to be enclosed on rooftop Date: January 26, 2016Permit type: Application | Permit status: Approved | Completion date: July 28, 2015 | Permit id: 2015-208045-000 | |||||
Remove and replace (3) antennas and install (3) radio heads on (3) separate antenna frames on the roof. Install (3) breakers inside of existing pdu cabinet on the existing raise equipment platform on roof Permit type: Application | Permit status: Approved | Completion date: April 20, 2016 | Permit id: 2016-156912-000 | |||||
Remove and replace (3) antennas and install (3) radio heads on (3) separate antenna frames on the roof. Install (3) breakers inside of existing pdu cabinet on the existing raise equipment platform on roof Permit type: Life safety | Permit status: Approved | Completion date: April 20, 2016 | Permit id: 2016-156912-000 | |||||
Remove and replace (3) antennas and install (3) radio heads on (3) separate antenna frames on the roof. Install (3) breakers inside of existing pdu cabinet on the existing raise equipment platform on roof Permit type: Life safety | Permit status: Not reqd | Completion date: April 20, 2016 | Permit id: 2016-156912-000 | |||||
Remove and replace (3) antennas and install (3) radio heads on (3) separate antenna frames on the roof. Install (3) breakers inside of existing pdu cabinet on the existing raise equipment platform on roof Permit type: Application | Permit status: Approved | Completion date: April 20, 2016 | Permit id: 2016-156912-000 | |||||
Remove and replace (3) antennas and install (3) radio heads on (3) separate antenna frames on the roof. Install (3) breakers inside of existing pdu cabinet on the existing raise equipment platform on roof Permit type: Life safety | Permit status: Approved | Completion date: April 20, 2016 | Permit id: 2016-156912-000 | |||||
Remove and replace (3) antennas and install (3) radio heads on (3) separate antenna frames on the roof. Install (3) breakers inside of existing pdu cabinet on the existing raise equipment platform on roof Permit type: Life safety | Permit status: Not reqd | Completion date: April 20, 2016 | Permit id: 2016-156912-000 | |||||
Panel antennas on rooftop with rooftop mounted equip. Date: June 29, 2001Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: February 23, 2004 | Current use: Business | Permit id: 2001-138604-000 | |||||
New antennas & equipment on existing building Date: October 6, 2006Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: January 5, 2007 | Current use: Utility | Permit id: 2006-155261-000 | |||||
Add rooftop antennas and equipment cabinets on roof Date: November 30, 2011Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: August 24, 2012 | Current use: Business | Permit id: 2010-110278-000 | |||||
Change of occupancy and interior remodel of exisiting 1963 sf ground floor elderly day use area- e3 occupancy under previous code- into additional beds of memory care -sr2 occupancy. Includes nurse station, activity and dining areas Date: October 11, 2012Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: January 2, 2013 | Current use: Institutional | Permit id: 2012-165999-000 | |||||
Remove and replace (3) antennas and install (3) radio heads on (3) separate antenna frames on the roof. Install (3) breakers inside of existing pdu cabinet on the existing raise equipment platform on roof Date: July 8, 2016Client: Southeast Uplift Neighborhood Program | Permit type: Addition | Permit status: Final | Completion date: January 6, 2017 | Current use: Utility | Permit id: 2016-156912-000 |