Building Permits at 3538 Greenmount Ave Baltimore MD


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 3538 Greenmount Ave Baltimore MD over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Original permit description:(com2012-14620)exterior work install a steel fire escape from the 3rd floor to ground level in rear of building as per plas as per code. 1-one hour fire separation is required between each dwelling unit 2-the interior stair
Date:  August 14, 2015

Permit id: Com2015-19109
2015/08/140953538 Greenmount Ave Baltimore Md
Original permit description:(com2012-14620)exterior work install a steel fire escape from the 3rd floor to ground level in rear of building as per plas as per code. 1-one hour fire separation is required between each dwelling unit 2-the interior stair
Date:  December 8, 2014

Permit id: Com2014-31083
2014/12/080953538 Greenmount Ave Baltimore Md
"amend permit#com2013-11984 issued on 6-12-13 w/completion date of 12-12-13 to extend for 6 months and also amend to add the additonal work; replace (6) 8"" dia. 9ft porch columns that were existing same size and location. Work done to code. Original permit"
Date:  January 13, 2014
Value:   $1,200

Permit id: Com2014-00649
2014/01/131200953538 Greenmount Ave Baltimore Md
Original permit description:(com2012-14620)exterior work install a steel fire escape from the 3rd floor to ground level in rear of building as per plas as per code. 1-one hour fire separation is required between each dwelling unit 2-the interior stair
Date:  August 14, 2013

Permit id: Com2013-16886
2013/08/140953538 Greenmount Ave Baltimore Md
Exterior work: repair porch roofing soffit and fasica trim and paint as per code
Date:  June 12, 2013
Value:   $3,000

Permit id: Com2013-11984
2013/06/123000953538 Greenmount Ave Baltimore Md
Request for time extension on permit# com2012-146 issued on 07/11/12 with original/amended completion date of 01/11/13original permit description:(com2012-14620)exterior work install a steel fire escape from the 3rd floor to ground level in rear of bui
Date:  January 17, 2013

Permit id: Com2013-01121
2013/01/170953538 Greenmount Ave Baltimore Md
Exterior work install a steel fire escape from the 3rd floor to ground level in rear of building as per plas as per code. 1-one hour fire separation is required between each dwelling unit 2-the interior stair shall be enclosed with no less than one-fir
Date:  July 11, 2012
Value:   $5,000

Permit id: Com2012-14620
2012/07/115000953538 Greenmount Ave Baltimore Md
Amend permit#com2012-10611 issued on 05/17/2012 without plans to add the following additional work: 1 ft fence on north property line/ ft 3ft fence on south side property line as per sketch & as per code. Original permit description:(com2012-10611)d
Date:  May 24, 2012
Value:   $50

Permit id: Com2012-11098
2012/05/2450953538 Greenmount Ave Baltimore Md
Demo and rebuild existing left brick fence/wall at front property line. Work done to code and per plans
Date:  May 16, 2012
Value:   $50

Permit id: Com2012-10611
2012/05/1650953538 Greenmount Ave Baltimore Md
Install a steel fire escape from the 3rd floor to ground level in rear of building as per plans as per code. Note: no formal plans have been filled to convert to mfd. All permits were issued over the counter (otc). 1) one hour fire separation is required be
Date:  December 18, 2009
Value:   $3,875

Permit id: Com2009-02087
2009/12/183875953538 Greenmount Ave Baltimore Md
Original permit description:(com2008-22993)supply and return ductsystem. Install (3) 1 0 btu gas furnace and 2 1/2 ton a/c system. As per code.
Date:  March 4, 2009

Permit id: Com2009-04901
2009/03/040953538 Greenmount Ave Baltimore Md
Replace all existing water sewer and gas lines as per code
Date:  September 8, 2008
Value:   $2,500

Permit id: Com2008-24430
2008/09/082500953538 Greenmount Ave Baltimore Md
Remodel and renovate the house install new windows doors floors and wall etc. As per code.
Date:  August 27, 2008
Value:   $20,000

Permit id: Com2008-23503
2008/08/2720000953538 Greenmount Ave Baltimore Md
Install low voltage wiring for phone cable and network. As per code.
Date:  August 27, 2008
Value:   $600

Permit id: Com2008-23505
2008/08/27600953538 Greenmount Ave Baltimore Md
Request for time extension on permit# com2008-04002 issued on 2/13/08 with original completion date of 8/13/05. Original permit description:(com2008-04002)replace/ instll 3 electrical services and 1 public service meter. All services are existing but outda
Date:  August 27, 2008

Permit id: Com2008-23510
2008/08/270953538 Greenmount Ave Baltimore Md
Supply and return ductsystem. Install (3) 1 0 btu gas furnace and 2 1/2 ton a/c system. As per code.
Date:  August 22, 2008
Value:   $4,000

Permit id: Com2008-22993
2008/08/224000953538 Greenmount Ave Baltimore Md
Date:  June 12, 2008

Permit id: Com2008-16306
2008/06/120953538 Greenmount Ave Baltimore Md
Install helical foundation pile to stabilize approximately 8 lf of foundation wall at rear of building. As per code.
Date:  April 21, 2008
Value:   $7,500

Permit id: Com2008-11150
2008/04/217500953538 Greenmount Ave Baltimore Md
Raise and replace front porch roof as per code
Date:  March 19, 2008
Value:   $800

Permit id: Com2008-07392
2008/03/19800953538 Greenmount Ave Baltimore Md
Replace/ instll 3 electrical services and 1 public service meter. All services are existing but outdated and damaged. Rewire all elect. And lighting in house. Work as epr code.
Date:  February 13, 2008
Value:   $6,000

Permit id: Com2008-04002
2008/02/136000953538 Greenmount Ave Baltimore Md
Remove rear brick wall and basement entrance steps and pour new footer for porch and build new rear brick wall and new steps. Remove old broken concrete floor and repour new floor at existing floor height and install drain feild. As per code.
Date:  February 6, 2008
Value:   $4,100

Permit id: Com2008-03313
2008/02/064100953538 Greenmount Ave Baltimore Md
Removal of plaster walls windows doors and floor coverings to facilitate. Remodel of home. Work as per code.
Date:  December 13, 2007
Value:   $8,000

Permit id: Com2007-37866
2007/12/138000953538 Greenmount Ave Baltimore Md
Request for time extension on permit# com2008-04002 issued on 2/13/08 with original completion date of 8/13/05. Original permit description:(com2008-04002)replace/ instll 3 electrical services and 1 public service meter. All services are existing but outdated and damaged. Rewire all elect. And lighting in house. Work as epr code.
Date:  August 27, 2008

Expiration date: February 27, 2009 | Permit id: Com2008-23510
2008/08/270953538 Greenmount Ave Baltimore Md
Install a steel fire escape from the 3rd floor to ground level in rear of building as per plans as per code. Note: no formal plans have been filled to convert to mfd. All permits were issued over the counter (otc). 1) one hour fire separation is required between each dwelling unit. 2) the interior stair shall be enclosed with no less than one-fire separation. 3) the entry doors from interior stair shall be fire rated and equipped with self-closing devices. 4) each unit shall have installed hard-wired battery back-up smoke detectors and co detectors when required. 5) field inspection shall confirm use of basement. 6) doors shall access fire escape and all material shall be non-combustible. 7) all openings within of fire escape shall be fire rated no less than 3/4 of an hour. 8) letter from owner required stating that the fire escape will be kept free and clear at all times. 9) there is to be sufficient illumination (subject to field inspection) for the fire escape.
Date:  December 18, 2009
Value:   $3,875

Expiration date: June 18, 2010 | Permit id: Com2009-02087
2009/12/183875953538 Greenmount Ave Baltimore Md
Request for time extension on permit# com2012-146 issued on 07/11/12 with original/amended completion date of 01/11/13original permit description:(com2012-14620)exterior work install a steel fire escape from the 3rd floor to ground level in rear of building as per plas as per code. 1-one hour fire separation is required between each dwelling unit 2-the interior stair shall be enclosed with no less than one-fire separation. 3-the entry doors from interior stair shall be fire rated and equipped with self-closing devices. 4-each unit shall have install hard-wired battery back-up smoke detectors and co detectors when required 5-field linspection shall confirm use of basement 6-doors shall access fire excape and all material shall be non-combustible 7-all openings within of fire escape shall be fire rated no less than 3/4 of an hour 8-letter from owner required stating that the fire escape will be kept free and clear al all times 9-there is to be sufficient illumination (subject to field in
Date:  January 17, 2013

Expiration date: July 17, 2013 | Permit id: Com2013-01121
2013/01/170953538 Greenmount Ave Baltimore Md
Amend permit#com2012-10611 issued on 05/17/2012 without plans to add the following additional work: 1 ft fence on north property line/ ft 3ft fence on south side property line as per sketch & as per code. Original permit description:(com2012-10611)demo and rebuild existing left brick fence/wall at front property line. Work done to code and per plans
Date:  May 24, 2012
Value:   $50

Expiration date: November 16, 2012 | Permit id: Com2012-11098
2012/05/2450953538 Greenmount Ave Baltimore Md
Exterior work install a steel fire escape from the 3rd floor to ground level in rear of building as per plas as per code. 1-one hour fire separation is required between each dwelling unit 2-the interior stair shall be enclosed with no less than one-fire separation. 3-the entry doors from interior stair shall be fire rated and equipped with self-closing devices. 4-each unit shall have install hard-wired battery back-up smoke detectors and co detectors when required 5-field linspection shall confirm use of basement 6-doors shall access fire excape and all material shall be non-combustible 7-all openings within of fire escape shall be fire rated no less than 3/4 of an hour 8-letter from owner required stating that the fire escape will be kept free and clear al all times 9-there is to be sufficient illumination (subject to field inspection) for the fire escape. This work was previously approved under permit #com2009-02087 and plans #2009-1448. As per plans as per code.
Date:  July 11, 2012
Value:   $5,000

Expiration date: January 11, 2013 | Permit id: Com2012-14620
2012/07/115000953538 Greenmount Ave Baltimore Md
Original permit description:(com2012-14620)exterior work install a steel fire escape from the 3rd floor to ground level in rear of building as per plas as per code. 1-one hour fire separation is required between each dwelling unit 2-the interior stair shall be enclosed with no less than one-fire separation. 3-the entry doors from interior stair shall be fire rated and equipped with self-closing devices. 4-each unit shall have install hard-wired battery back-up smoke detectors and co detectors when required 5-field linspection shall confirm use of basement 6-doors shall access fire excape and all material shall be non-combustible 7-all openings within of fire escape shall be fire rated no less than 3/4 of an hour 8-letter from owner required stating that the fire escape will be kept free and clear al all times 9-there is to be sufficient illumination (subject to field inspection) for the fire escape. This work was previously approved under permit #com2009-02087 and plans #2009-1448. As
Date:  August 14, 2013

Expiration date: February 14, 2014 | Permit id: Com2013-16886
2013/08/140953538 Greenmount Ave Baltimore Md
Amend permit#com2013-11984 issued on 6-12-13 w/completion date of 12-12-13 to extend for 6 months and also amend to add the additonal work; replace (6) 8" dia. 9ft porch columns that were existing same size and location. Work done to code. Original permit description:(com2013-11984)exterior work: repair porch roofing soffit and fasica trim and paint as per code
Date:  January 13, 2014
Value:   $1,200

Expiration date: July 13, 2014 | Permit id: Com2014-00649
2014/01/131200953538 Greenmount Ave Baltimore Md
Original permit description:(com2012-14620)exterior work install a steel fire escape from the 3rd floor to ground level in rear of building as per plas as per code. 1-one hour fire separation is required between each dwelling unit 2-the interior stair shall be enclosed with no less than one-fire separation. 3-the entry doors from interior stair shall be fire rated and equipped with self-closing devices. 4-each unit shall have install hard-wired battery back-up smoke detectors and co detectors when required 5-field linspection shall confirm use of basement 6-doors shall access fire excape and all material shall be non-combustible 7-all openings within of fire escape shall be fire rated no less than 3/4 of an hour 8-letter from owner required stating that the fire escape will be kept free and clear al all times 9-there is to be sufficient illumination (subject to field inspection) for the fire escape. This work was previously approved under permit #com2009-02087 and plans #2009-1448. As
Date:  December 8, 2014

Expiration date: June 8, 2015 | Permit id: Com2014-31083
2014/12/080953538 Greenmount Ave Baltimore Md
Original permit description:(com2012-14620)exterior work install a steel fire escape from the 3rd floor to ground level in rear of building as per plas as per code. 1-one hour fire separation is required between each dwelling unit 2-the interior stair shall be enclosed with no less than one-fire separation. 3-the entry doors from interior stair shall be fire rated and equipped with self-closing devices. 4-each unit shall have install hard-wired battery back-up smoke detectors and co detectors when required 5-field linspection shall confirm use of basement 6-doors shall access fire excape and all material shall be non-combustible 7-all openings within of fire escape shall be fire rated no less than 3/4 of an hour 8-letter from owner required stating that the fire escape will be kept free and clear al all times 9-there is to be sufficient illumination (subject to field inspection) for the fire escape. This work was previously approved under permit #com2009-02087 and plans #2009-1448. As
Date:  July 14, 2015

Expiration date: August 14, 2015 | Permit id: Com2015-16278
2015/07/140953538 Greenmount Ave Baltimore Md
Non-structural alterations/exterior work - replace 3rd flr rear window with 45 minute fire rated window/replace rear north side 1st floor window with 45 minute fire rated window as per code. Windows same side and same location.
Date:  February 17, 2016
Value:   $500

Expiration date: August 17, 2016 | Permit id: Com2016-03617
2016/02/17500953538 Greenmount Ave Baltimore Md
Extend original permit.(original permit:com2016-03617:non-structural alterations/exterior work - replace 3rd flr rear window with 45 minute fire rated window/replace rear north side 1st floor window with 45 minute fire rated window as per code. Windows same side and same location.)original permit description:(com2016-03617)non-structural alterations/exterior work - replace 3rd flr rear window with 45 minute fire rated window/replace rear north side 1st floor window with 45 minute fire rated window as per code. Windows same side and same location.
Date:  August 17, 2016

Expiration date: February 17, 2017 | Permit id: Com2016-21184
2016/08/170953538 Greenmount Ave Baltimore Md
Original permit description:(com2012-14620)exterior work install a steel fire escape from the 3rd floor to ground level in rear of building as per plas as per code. 1-one hour fire separation is required between each dwelling unit 2-the interior stair shall be enclosed with no less than one-fire separation. 3-the entry doors from interior stair shall be fire rated and equipped with self-closing devices. 4-each unit shall have install hard-wired battery back-up smoke detectors and co detectors when required 5-field linspection shall confirm use of basement 6-doors shall access fire excape and all material shall be non-combustible 7-all openings within of fire escape shall be fire rated no less than 3 4 of an hour 8-letter from owner required stating that the fire escape will be kept free and clear al all times 9-there is to be sufficient illumination (subject to field inspection) for the fire escape. This work was previously approved under permit #com2009-02087 and plans #2009-1448. As
Date:  December 8, 2014

Expiration date: June 8, 2015 | Permit id: Com2014-31083
2014/12/080953538 Greenmount Ave Baltimore Md
Original permit description:(com2012-14620)exterior work install a steel fire escape from the 3rd floor to ground level in rear of building as per plas as per code. 1-one hour fire separation is required between each dwelling unit 2-the interior stair shall be enclosed with no less than one-fire separation. 3-the entry doors from interior stair shall be fire rated and equipped with self-closing devices. 4-each unit shall have install hard-wired battery back-up smoke detectors and co detectors when required 5-field linspection shall confirm use of basement 6-doors shall access fire excape and all material shall be non-combustible 7-all openings within of fire escape shall be fire rated no less than 3 4 of an hour 8-letter from owner required stating that the fire escape will be kept free and clear al all times 9-there is to be sufficient illumination (subject to field inspection) for the fire escape. This work was previously approved under permit #com2009-02087 and plans #2009-1448. As
Date:  July 14, 2015

Expiration date: August 14, 2015 | Permit id: Com2015-16278
2015/07/140953538 Greenmount Ave Baltimore Md
Non-structural alterations exterior work - replace 3rd flr rear window with 45 minute fire rated window replace rear north side 1st floor window with 45 minute fire rated window as per code. Windows same side and same location.
Date:  February 17, 2016
Value:   $500

Expiration date: August 17, 2016 | Permit id: Com2016-03617
2016/02/17500953538 Greenmount Ave Baltimore Md
Exterior work: replace existing 3rd floor window with 45 minute rated window same size and location. Replace north side rear window with 45 min. Fire rated window same size and location as per code
Date:  May 15, 2017
Value:   $4,000

Expiration date: November 15, 2017 | Permit id: Com2017-09890
2017/05/154000953538 Greenmount Ave Baltimore Md
Extend original permit.(original permit:com2016-03617:non-structural alterations exterior work - replace 3rd flr rear window with 45 minute fire rated window replace rear north side 1st floor window with 45 minute fire rated window as per code. Windows same side and same location.)original permit description:(com2016-03617)non-structural alterations exterior work - replace 3rd flr rear window with 45 minute fire rated window replace rear north side 1st floor window with 45 minute fire rated window as per code. Windows same side and same location.
Date:  August 17, 2016

Expiration date: February 17, 2017 | Permit id: Com2016-21184
2016/08/170953538 Greenmount Ave Baltimore Md
Replace instll 3 electrical services and 1 public service meter. All services are existing but outdated and damaged. Rewire all elect. And lighting in house. Work as epr code.
Date:  February 13, 2008
Value:   $6,000

Expiration date: August 13, 2008 | Permit id: Com2008-04002
2008/02/136000953538 Greenmount Ave Baltimore Md
Request for time extension on permit# com2008-04002 issued on 2 13 08 with original completion date of 8 13 05. Original permit description:(com2008-04002)replace instll 3 electrical services and 1 public service meter. All services are existing but outdated and damaged. Rewire all elect. And lighting in house. Work as epr code.
Date:  August 27, 2008

Expiration date: February 27, 2009 | Permit id: Com2008-23510
2008/08/270953538 Greenmount Ave Baltimore Md
Install a steel fire escape from the 3rd floor to ground level in rear of building as per plans as per code. Note: no formal plans have been filled to convert to mfd. All permits were issued over the counter (otc). 1) one hour fire separation is required between each dwelling unit. 2) the interior stair shall be enclosed with no less than one-fire separation. 3) the entry doors from interior stair shall be fire rated and equipped with self-closing devices. 4) each unit shall have installed hard-wired battery back-up smoke detectors and co detectors when required. 5) field inspection shall confirm use of basement. 6) doors shall access fire escape and all material shall be non-combustible. 7) all openings within of fire escape shall be fire rated no less than 3 4 of an hour. 8) letter from owner required stating that the fire escape will be kept free and clear at all times. 9) there is to be sufficient illumination (subject to field inspection) for the fire escape.
Date:  December 18, 2009
Value:   $3,875

Expiration date: June 18, 2010 | Permit id: Com2009-02087
2009/12/183875953538 Greenmount Ave Baltimore Md
Original permit description:(com2008-22993)supply and return ductsystem. Install (3) 1 0 btu gas furnace and 2 1 2 ton a c system. As per code.
Date:  March 4, 2009

Expiration date: April 4, 2009 | Permit id: Com2009-04901
2009/03/040953538 Greenmount Ave Baltimore Md
Demo and rebuild existing left brick fence wall at front property line. Work done to code and per plans
Date:  May 16, 2012
Value:   $50

Expiration date: November 16, 2012 | Permit id: Com2012-10611
2012/05/1650953538 Greenmount Ave Baltimore Md
Amend permit#com2012-10611 issued on 05 17 2012 without plans to add the following additional work: 1 ft fence on north property line ft 3ft fence on south side property line as per sketch & as per code. Original permit description:(com2012-10611)demo and rebuild existing left brick fence wall at front property line. Work done to code and per plans
Date:  May 24, 2012
Value:   $50

Expiration date: November 16, 2012 | Permit id: Com2012-11098
2012/05/2450953538 Greenmount Ave Baltimore Md
Exterior work install a steel fire escape from the 3rd floor to ground level in rear of building as per plas as per code. 1-one hour fire separation is required between each dwelling unit 2-the interior stair shall be enclosed with no less than one-fire separation. 3-the entry doors from interior stair shall be fire rated and equipped with self-closing devices. 4-each unit shall have install hard-wired battery back-up smoke detectors and co detectors when required 5-field linspection shall confirm use of basement 6-doors shall access fire excape and all material shall be non-combustible 7-all openings within of fire escape shall be fire rated no less than 3 4 of an hour 8-letter from owner required stating that the fire escape will be kept free and clear al all times 9-there is to be sufficient illumination (subject to field inspection) for the fire escape. This work was previously approved under permit #com2009-02087 and plans #2009-1448. As per plans as per code.
Date:  July 11, 2012
Value:   $5,000

Expiration date: January 11, 2013 | Permit id: Com2012-14620
2012/07/115000953538 Greenmount Ave Baltimore Md
Supply and return ductsystem. Install (3) 1 0 btu gas furnace and 2 1 2 ton a c system. As per code.
Date:  August 22, 2008
Value:   $4,000

Expiration date: February 22, 2009 | Permit id: Com2008-22993
2008/08/224000953538 Greenmount Ave Baltimore Md
Request for time extension on permit# com2012-146 issued on 07 11 12 with original amended completion date of 01 11 13original permit description:(com2012-14620)exterior work install a steel fire escape from the 3rd floor to ground level in rear of building as per plas as per code. 1-one hour fire separation is required between each dwelling unit 2-the interior stair shall be enclosed with no less than one-fire separation. 3-the entry doors from interior stair shall be fire rated and equipped with self-closing devices. 4-each unit shall have install hard-wired battery back-up smoke detectors and co detectors when required 5-field linspection shall confirm use of basement 6-doors shall access fire excape and all material shall be non-combustible 7-all openings within of fire escape shall be fire rated no less than 3 4 of an hour 8-letter from owner required stating that the fire escape will be kept free and clear al all times 9-there is to be sufficient illumination (subject to field in
Date:  January 17, 2013

Expiration date: July 17, 2013 | Permit id: Com2013-01121
2013/01/170953538 Greenmount Ave Baltimore Md
Amend permit#com2013-11984 issued on 6-12-13 w completion date of 12-12-13 to extend for 6 months and also amend to add the additonal work; replace (6) 8" dia. 9ft porch columns that were existing same size and location. Work done to code. Original permit description:(com2013-11984)exterior work: repair porch roofing soffit and fasica trim and paint as per code
Date:  January 13, 2014
Value:   $1,200

Expiration date: July 13, 2014 | Permit id: Com2014-00649
2014/01/131200953538 Greenmount Ave Baltimore Md
Original permit description:(com2012-14620)exterior work install a steel fire escape from the 3rd floor to ground level in rear of building as per plas as per code. 1-one hour fire separation is required between each dwelling unit 2-the interior stair shall be enclosed with no less than one-fire separation. 3-the entry doors from interior stair shall be fire rated and equipped with self-closing devices. 4-each unit shall have install hard-wired battery back-up smoke detectors and co detectors when required 5-field linspection shall confirm use of basement 6-doors shall access fire excape and all material shall be non-combustible 7-all openings within of fire escape shall be fire rated no less than 3 4 of an hour 8-letter from owner required stating that the fire escape will be kept free and clear al all times 9-there is to be sufficient illumination (subject to field inspection) for the fire escape. This work was previously approved under permit #com2009-02087 and plans #2009-1448. As
Date:  August 14, 2013

Expiration date: February 14, 2014 | Permit id: Com2013-16886
2013/08/140953538 Greenmount Ave Baltimore Md
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.