ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
On harrell st (house #3516) provide access from sewer manholes to rehab 8 inch sewer main by installing a liner inside pipe in accordance with wssc plans and specifications. Construct excavation and compaction for water and sewer house connections in accordance with wssc plans and specifications. Construct utility pavement patch in kind as directed. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current maryland state highway administration (msha) specifications and montgomery county specifications for utility construction permit. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector richard boylan at 301-674-70 before and after installation. Date: May 16, 2007Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 252806 |