ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Wo#99022 pg&e pm#41016995. Approx one mile of gas pipeline testing on reed ave and stillwater rd. Placing probe in contact with ground surface. If surface is hard, drilling of 1 2" diameter hole is required just through a c. Drilled hole with be filled with quikrete concrete repair to grade and quikreet black top repair is used to seal hole & match existing a c. Caulk gun is used to fill each hole. (no trenching excavating) a pre-construction meeting is required call (916) 617-4692. All work s Date: October 8, 2009Permit id: 09-0280 | Parcel: 014680012000 | |||||
Trench in parkway to a depth of 43" to place of 1-5" conduit and backfill with native and compact to 90% re-route at existing pg&e cabinet. Pull new fiber by acessing existing manholes. All work within the right-of-way shall be constructed per state and federal accessibility standards. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, s Date: March 31, 2011Permit id: 11-0066 | Parcel: 014680012000 |