ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Located on dalewood dr dirt cut,expose 2" w/s 2 valve # 25& install 1 anode, plastic gas service in accordance with washington gas plan no. 113272. Construct utility pavement patch in kind as directed by the inspector in the field. All above & below grade facilities shall be placed in public utility easements or adjacent to the right-of-way line unless approved otherwise by the mcdps right-of-way (row) inspector. Work shall comply with the current montgomery county specifications for utility construction permit. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting required contact mcdps inspector before and after installation. Date: August 6, 2010Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 266293 | |||||
Dw permit (residential) construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) roadside tree protection plan root pruning to be performed and tree protection fence installed along limits of new driveway apron prior to excavation. 20" silver maple is 15 from new apron. Sav Date: October 12, 2015Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 346179 |