ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electric heat pump and or air conditioner replacement, no modifications or alterations to existing system Date: September 14, 2017Permit type: Addn | Permit status: Completed | Completion date: October 25, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: October 20, 2017Permit status: Pass | Permit id: Pds2017-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 5 7 15 plan change - remove subpanel; see c of a... Vmt Date: April 23, 2015 Contractor: Verengo IncPermit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2015-Resalt- | |||||
Electric heat pump and or air conditioner replacement, no modifications or alterations to existing system Date: September 14, 2017Permit type: Hra electric heat pump/ac r&r | Permit status: Issued | Permit id: Pds2017-Resalt- |