ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
San conn: 136 lf of 36 rcp main, approx d=16, in sw us veterens hosptl rd. Contractor shall build new 6 branch per std p-262 and tap 36 main. Contractor to verify all depths and locations in field. Contact x37869 Date: November 12, 2014Permit type: Intake | Permit status: Closed | Completion date: November 12, 2014 | Permit id: 2014-236816-000 | |||||
69 unit building. Largest unit is 9 sqft - oar 918 reduced fees apply only to residential units. Date: December 23, 2014Permit type: Intake | Permit status: Closed | Completion date: November 21, 2014 | Permit id: 2014-241012-000 | |||||
Street tree removal /replant permit Date: January 30, 2015Permit type: A - research | Permit status: Title 11 permit with cond | Completion date: February 11, 2015 | Permit id: 2015-112269-000 | |||||
Alarm-installing fire alarm system Date: February 24, 2015Permit type: Intake | Permit status: Approved | Completion date: February 11, 2015 | Permit id: 2015-117595-000 | |||||
42 ft of sewer lateral repair Date: February 24, 2015Permit type: Intake | Permit status: Closed | Completion date: February 24, 2015 | Permit id: 2015-124255-000 | |||||
Gas piping to (3) water heaters in mechanical room and (1) fire place in lobby Date: March 4, 2015Permit type: Intake | Permit status: Closed | Completion date: March 4, 2015 | Permit id: 2015-128092-000 | |||||
Hazardous/tank - install generator and remote fuel station. Date: June 26, 2015Permit type: Intake | Permit status: Approved | Completion date: March 4, 2015 | Permit id: 2015-128105-000 | |||||
25. 4 sq ft non-illuminated wall sign Date: July 2, 2015Permit type: Intake | Permit status: Closed | Completion date: July 2, 2015 | Permit id: 2015-195939-000 | |||||
Approval of a new 7-story apartment building in the marquam hill plan district to include 69 residential units, a ground floor retail space, and rooftop deck. Twelve existing parking spaces are proposed to be reconfigured to serve the new building. Bicycle parking will be provided with long-term spaces and short-term spaces. Proposed exterior materials include metal panel, painted concrete, aluminum storefront systems, black vinyl window systems, steel, and ip decking. Modifications are requested to the following standards: 33. 555. 2 formal open areas in subdistricts a through d to reduce the amount of formal open area required to zero square feet; and 33. 266. 220. C standards for all bicycle parking to reduce the required 2 width to 1-6 for 24 of the 78 required long-term bicycle parking spaces; and 33. 266. 130. G parking area setbacks and landscaping to reduce the required landscaped setback along the unimproved sw 9th avenue from 5 of l2 to 0. This approval is per the approved site plans Date: July 11, 2014Permit type: Land use review | Permit status: Completed | Completion date: March 20, 2014 | Permit id: 2014-127782-000 | |||||
Hearings officer decision: it is the decision of the hearings officer to adopt and incorporate into this decision the facts, findings, and conclusions of the bureau of development services in their staff report and recommendation to the hearings officer dated june 27, 2014. Approval of conditional use review to allow construction of a new mixed-use, seven-story structure on this site, which would include 69 multi-dwelling residential units and 2,2 square feet of retail floor area, in general compliance with the site plan, landscape plan, and parking plan, exhibits c-1, c-2 and c-3, and also subject to the following condition:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1 through c. 3. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-142273 cu. Basis for Date: July 28, 2014Permit type: Land use review | Permit status: Completed | Completion date: April 16, 2014 | Permit id: 2014-142273-000 | |||||
Demolition of existing building. Elevator pit. Not residential comprehensive plan designation - zoning is exd within marquam hill plan district Date: May 9, 2014Permit type: Application | Permit status: Approved | Completion date: May 9, 2014 | Permit id: 2014-154864-000 | |||||
Added value revision to add tree removal Date: August 26, 2014Permit type: Application | Permit status: Approved | Completion date: July 15, 2014 | Permit id: 2014-154864-Rev | |||||
Revision - provide temporary shoring not residential comprehensive plan designation - zoning is exd within marquam hill plan district Date: September 8, 2014Permit type: Application | Permit status: Approved | Completion date: August 4, 2014 | Permit id: 2014-154864-Rev | |||||
Seven story, 69 unit apartment building with retail and covered parking area on ground floor, includes associated site work and stormwater facilities Date: October 27, 2014Permit type: Application | Permit status: Approved | Completion date: May 15, 2014 | Permit id: 2014-157004-000 | |||||
Dfs for pt cable shops and calcs Date: December 16, 2014Permit type: Application | Permit status: Approved | Completion date: October 29, 2014 | Permit id: 2014-157004-Dfs | |||||
Hold down system Date: January 20, 2015Permit type: Application | Permit status: Approved | Completion date: December 1, 2014 | Permit id: 2014-157004-Dfs | |||||
Dfs - floor i joist design Date: April 2, 2015Permit type: Application | Permit status: Approved | Completion date: January 20, 2015 | Permit id: 2014-157004-Dfs | |||||
Dfs - seismic attachment for generator Date: June 16, 2015Permit type: Application | Permit status: Approved | Completion date: January 20, 2015 | Permit id: 2014-157004-Dfs | |||||
Dfs - storefront system Date: March 10, 2015Permit type: Application | Permit status: Approved | Completion date: January 20, 2015 | Permit id: 2014-157004-Dfs | |||||
Dfs for seismic design of mechanical equipment at roof Date: June 16, 2015Permit type: Application | Permit status: Approved | Completion date: March 4, 2015 | Permit id: 2014-157004-Dfs | |||||
Dfs for roof truss design Date: April 2, 2015Permit type: Application | Permit status: Approved | Completion date: March 6, 2015 | Permit id: 2014-157004-Dfs | |||||
Revision - replace cmu wall with chainlink fence inside parking garage for generator room Date: November 5, 2014Permit type: Application | Permit status: Approved | Completion date: November 5, 2014 | Permit id: 2014-157004-Rev | |||||
Revision - change handrails from steel to wood, eliminate steel planters from roof, modify framing of roof deck and modify bridge Date: March 10, 2015Permit type: Application | Permit status: Approved | Completion date: January 13, 2015 | Permit id: 2014-157004-Rev | |||||
Revision to reconfigure perforated metal vent screen covers on exterior walls. Date: June 26, 2015Permit type: Application | Permit status: Approved | Completion date: June 26, 2015 | Permit id: 2014-157004-Rev | |||||
10-ton packaged heat pump for corridors, ductless splits for apartments, in-line exhaust from kitchen and restroom in dropped ceiling, dryer ventinghvac associated with new apartment building, e-gen, plans w/co Date: January 27, 2015Permit type: Intake | Permit status: Closed | Completion date: May 15, 2014 | Permit id: 2014-157009-000 | |||||
Alarm - add dact communicator Date: May 16, 2014Permit type: Intake | Permit status: Approved | Completion date: May 16, 2014 | Permit id: 2014-158068-000 | |||||
Street tree removal /replant permit Permit type: D - permit request | Permit status: No permit required | Completion date: September 2, 2014 | Permit id: 2014-190444-000 | |||||
Fire sprinkler - nfpa 13 fire sprinkler system Date: September 30, 2014Permit type: Intake | Permit status: Approved | Completion date: September 5, 2014 | Permit id: 2014-208810-000 | |||||
Temp power for new construction Date: September 30, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: October 2, 2014 | Permit id: 2014-219150-000 | |||||
Plumbing for 7-story apartment building Date: November 5, 2014Permit type: Intake | Permit status: Closed | Completion date: November 5, 2014 | Permit id: 2014-234560-000 | |||||
Alarm - design and installation of das system (alarm permit 15-117595fs) Date: August 21, 2015Permit type: Intake | Permit status: Approved | Completion date: August 12, 2015 | Permit id: 2015-216271-000 | |||||
Tenant improvement for first time restaurant tenant, new walls to create (2) bathrooms. Date: November 30, 2015Permit type: Application | Permit status: Approved | Completion date: November 2, 2015 | Permit id: 2015-259152-000 | |||||
New tenant build out, 18 total plumbing fixtures. Date: December 2, 2015Permit type: Intake | Permit status: Closed | Completion date: December 2, 2015 | Permit id: 2015-272152-000 | |||||
Electrical for ti, 33 circuits and 1 low voltage Date: January 15, 2016Permit type: Intake | Permit status: Closed | Completion date: January 15, 2016 | Permit id: 2016-106291-000 | |||||
Install walk-in cooler Date: February 2, 2016Permit type: Application | Permit status: Approved | Completion date: January 25, 2016 | Permit id: 2016-110171-000 | |||||
Condenser for walk-in cooler, installed inside building in garage. Outdoor unit in the parking garage. Date: February 2, 2016Permit type: Intake | Permit status: Closed | Completion date: January 25, 2016 | Permit id: 2016-110175-000 | |||||
Install hood and ductwork type 1. Install ductwork to existing 5t fan coil units and distribution ductwork. Install two bathroom exhaust fans . Install water heater venting. Date: January 26, 2016Permit type: Intake | Permit status: Closed | Completion date: January 26, 2016 | Permit id: 2016-111431-000 | |||||
Fixed-installation of a pyro chem pcl-4 restaurant fire system into an exhaust hood. Date: March 1, 2016Permit type: Intake | Permit status: Approved | Completion date: February 26, 2016 | Permit id: 2016-126798-000 | |||||
Add/relocate nine fire sprinklers based on new tenant improvement wall/ceilings. Date: March 7, 2016Permit type: Intake | Permit status: Approved | Completion date: March 7, 2016 | Permit id: 2016-131419-000 | |||||
Alarm - relocate 1 & add 1 horn strobe, add 3 strobes Date: March 10, 2016Permit type: Intake | Permit status: Approved | Completion date: March 10, 2016 | Permit id: 2016-133284-000 | |||||
Nesst at treehouse apts - fire alarm wiring Date: March 10, 2016Permit type: Electrical inspections | Permit status: Approved | Completion date: March 17, 2016 | Permit id: 2016-133659-000 | |||||
Request for zoning confirmation letter (zcl) Permit type: Land use review | Permit status: Closed | Completion date: April 4, 2016 | Permit id: 2016-144608-000 | |||||
Revision to add connections for planter at roof deck Date: July 29, 2015Permit type: Application | Permit status: Approved | Completion date: July 14, 2015 | Permit id: 2014-157004-Rev | |||||
Temp power for new constructionfaxed Date: September 30, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: October 2, 2014 | Permit id: 2014-219150-000 | |||||
Install 1 catch basin, install 3 lf of rain drains, install 5 lf of storm pipe, install 1 stormwater detention facility, install 1 backflow preventer/ added 1 ft of storm 6/23/15 / Date: October 10, 2014Permit type: Plumbing inspections | Permit status: Approved | Completion date: March 14, 2016 | Permit id: 2014-224136-000 | |||||
Install fire alarm system. 5 circuits for fire alarm system Date: March 18, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: August 24, 2015 | Permit id: 2015-135712-000 | |||||
Installation of data, cctv and access control systems Date: April 1, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: August 28, 2015 | Permit id: 2015-143402-000 | |||||
Add relocate nine fire sprinklers based on new tenant improvement wall ceilings. Date: March 7, 2016Permit type: Intake | Permit status: Approved | Completion date: March 7, 2016 | Permit id: 2016-131419-000 | |||||
Request for zoning confirmation letter (zcl) Permit type: Land use review | Permit status: Closed | Completion date: April 4, 2016 | Permit id: 2016-144608-000 | |||||
10-ton packaged heat pump for corridors, ductless splits for apartments, in-line exhaust from kitchen and restroom in dropped ceiling, dryer ventinghvac associated with new apartment building, e-gen, plans w co Date: January 27, 2015Permit type: Intake | Permit status: Closed | Completion date: May 15, 2014 | Permit id: 2014-157009-000 | |||||
Install 1 catch basin, install 3 lf of rain drains, install 5 lf of storm pipe, install 1 stormwater detention facility, install 1 backflow preventer added 1 ft of storm 6 23 15 Date: October 10, 2014Permit type: Plumbing inspections | Permit status: Approved | Completion date: March 14, 2016 | Permit id: 2014-224136-000 | |||||
Hazardous tank - install generator and remote fuel station. Date: June 26, 2015Permit type: Intake | Permit status: Approved | Completion date: March 4, 2015 | Permit id: 2015-128105-000 | |||||
New 62sq ft canopy over existing imprevious parking garage Date: July 12, 2016Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: October 28, 2016 | Current use: Apartments/condos (3 or more units) | Permit id: 2016-202775-000 |