ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Date: July 6, 2001Permit id: 01-07-016 | Parcel: 045660040000 | |||||
Date: September 26, 2000Permit id: 00-09-112 | |||||
Date: March 21, 2002Permit id: 02-03-095 | Parcel: 001010001000 | |||||
Date: January 27, 2003Permit id: 03-01-152 | |||||
Date: February 9, 2004Permit id: 04-02-109 | Parcel: 045661009000 | |||||
Date: March 24, 2005Permit id: 05-03-282 | Parcel: 045661002000 | |||||
Date: December 20, 2006Permit id: 06-12-102 | Parcel: 045661010000 | |||||
Date: February 1, 2007Permit id: 07-02-005 | Parcel: 045661005000 | |||||
Date: May 12, 2008Permit id: 08-05-056 | Parcel: 045661009000 | |||||
Date: March 26, 2009Permit id: 09-03-073 | Parcel: 045661009000 | |||||
Date: March 17, 2010Permit id: 10-03-046 | Parcel: 045661002000 | |||||
Date: March 14, 2011Permit id: 11-03-030 | Parcel: 045661009000 | |||||
Pool installation Date: November 1, 2002Permit id: 01-3565 | |||||
Frontage improvements Date: November 1, 2002Permit id: 00-3204 | |||||
New sfd bridgeway v7-1 Date: January 27, 2003Permit id: 03-0110 | Parcel: 045661005000 | |||||
Res. Swimming poolswimming pool - all work shall comply with city standards. A pre-inspection is required! A final inspection is required prior to building permit final. Any damage to curb, gutter, sidewalk or landscape will be repaired prior to deposit refund. Date: September 29, 2004Permit id: 04-1079 | Parcel: 045661005000 | |||||
Code enforcement: second driveway--install a driveway access, concrete in landscape strip and replace sidewalk with driveway standard concrete. All work shall comply with city standards. An engineering pre-inspection is required! Call 916-617-4692 final engineering encroachment inspection is required prior to building permit final inspection. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to deposit refund. Date: July 19, 2005Permit id: 05-1099 | Parcel: 045661010000 | |||||
SCORE 56 Gunite pool & spa. All work shall comply with city standards. Access is limited to site driveway. Soil relocation requires written permission from receiving location. A pre-inspection is required! Final engineering encroachment inspection is required prior to building permit final inspection. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to finalization of encroachment permit and deposit refund. Engineering inspection request line (916) 617-4692 Date: December 22, 2006 Contractor: Placer PoolsPermit id: 06-0941 | Parcel: 045661010000 | |||||
SCORE 100 Swimming pool. A pre-inspection is required! Final engineering encroachment inspection is required 24 48 hrs prior to requesting for building permit final inspection. All work shall comply with city standards. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to finalization of encroachment permit and deposit refund. Engineering inspection request line (916) 617-4692 Date: May 12, 2008 Contractor: Premier PoolsPermit id: 08-0150 | Parcel: 045661009000 | |||||
Wo#99003 at&t job#7067757 - driveway repair"project light speed" located on the side of 34 st croix rd. Construction method: bore. Install at&t conduits, equipment and power conduits to provision a new at&t electronics cabinet. A pre-construction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, trees or landscape will be repaired to normal or b Date: February 19, 2010Permit id: 10-0082 |