ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Date: January 15, 2003Permit id: 03-01-076 | Parcel: 046050022000 | |||||
Date: March 11, 2004Permit id: 04-03-123 | Parcel: 046050022000 | |||||
Date: March 2, 2006Permit id: 06-03-001 | Parcel: 046050022000 | |||||
Date: January 22, 2008Permit id: 08-01-085 | Parcel: 046050022000 | |||||
Date: February 24, 2009Permit id: 09-02-072 | Parcel: 046050022000 | |||||
Date: April 9, 2010Permit id: 10-04-034 | Parcel: 046050022000 | |||||
Date: June 25, 2012Permit id: 12-06-118 | Parcel: 046050022000 | |||||
Date: October 23, 1997Permit id: 97-04-028 | Parcel: 046050022000 | |||||
Stock pile Date: August 15, 2013Permit id: 13-0278 | Parcel: 046050022000 | |||||
Place 8" casing in south river rd through the levee. Prior to work contact cvf. Place 8" casing in south river rd through the levee. Prior to work contact cvf. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the right-of-way will be repaired to normal condition or better. Date: July 18, 2013Permit id: 13-0261 | Parcel: 046050022000 | |||||
Replace dock; ada upgrades; electrical Date: April 14, 2010Permit id: 10-0134 | Parcel: 046050022000 |