ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
F17/ tower/ extensive upgrades to tower including porte corchere remodel, bracing of mep, fire suppression and other equipment throughout, energy efficiency upgrades including spray foam insulation, new domestic water piping, lighting, electrical and mechanical. Remodel office and community spaces on first and second floors. Frontage and site improvements including parking and stormwater Date: December 12, 2014Permit type: Reviews | Permit status: Approved | Completion date: December 12, 2014 | Permit id: 2014-249124-000 | |||||
F9/ tower/ extensive upgrades to tower including voluntary seismic upgrades, drive thru porte corchere remodel, bracing of mep, fire suppression and other equipment throughout, energy efficiency upgrades including spray foam insulation, new domestic water piping, lighting, electrical and mechanical. Remodel office and community spaces on first and second floors. Frontage and site improvements including parking and stormwater. Date: February 27, 2015Permit type: Intake | Permit status: Closed | Completion date: December 12, 2014 | Permit id: 2014-249130-000 | |||||
F9/ tower/ install motorized damper in elevator hoistway vent, decommission existing steam boilers, remove (e) exhaust fan and ductwork, new erv -2 and ductwork, remove (e) steam heating units and cap steam lines. Bracing of mechanical equipment and gas lines Date: February 27, 2015Permit type: Intake | Permit status: Closed | Completion date: December 12, 2014 | Permit id: 2014-249150-000 | |||||
F17/ annex/ upgrade exterior south exit stair, brace mep, fire suppression and other equipment, upgrade energy efficiency including new domestic water piping and storage tanks, spray foam insulation, convert floor 1 maintenance room into computer lab, add laundry room at each residential floor. Site and frontage improvements including parking and stormwater Date: December 12, 2014Permit type: Reviews | Permit status: Approved | Completion date: December 12, 2014 | Permit id: 2014-249156-000 | |||||
F9/ annex/ upgrade exterior south exit stair, brace mep, fire suppression and other equipment, upgrade energy efficiency including new domestic water piping and storage tanks, spray foam insulation, convert floor 1 maintenance room into computer lab, add laundry room at each residential floor. Site and frontage improvements including parking and stormwater Date: February 27, 2015Permit type: Intake | Permit status: Closed | Completion date: December 12, 2014 | Permit id: 2014-249160-000 | |||||
F9/ annex - new dryer vents, vent hoods, gas vents, remove steam heating, replace domestic water heater, install heat recoery units at corridor ventilation equipment Date: February 27, 2015Permit type: Intake | Permit status: Closed | Completion date: December 12, 2014 | Permit id: 2014-249164-000 | |||||
Zoning confirmation request Permit type: Land use review | Permit status: Closed | Completion date: January 5, 2015 | Permit id: 2015-100985-000 | |||||
Zoning confirmation request Permit type: Land use review | Permit status: Letter sent | Completion date: January 20, 2015 | Permit id: 2015-100985-000 | |||||
Annex- design, fabricate & install additions to the existing sprinkler system on all three levels. 286 heads totalapplication and 2 sets of plans and calcs provided. Date: January 21, 2015Permit type: Intake | Permit status: Closed | Completion date: January 13, 2015 | Permit id: 2015-104555-000 | |||||
Tower- design, fabricate & install the alterations needed to the remodeled areas on the ground floor & level one. Same for the remodeled laundry rooms & solariums on floors 2 thru 11. Application, 1 set of calcs and plans recd. Date: January 21, 2015Permit type: Intake | Permit status: Closed | Completion date: January 13, 2015 | Permit id: 2015-104556-000 | |||||
Pwr - tower/ extensive upgrades to tower including voluntary seismic upgrades, drive thru porte corchere remodel, bracing of mep, fire suppression and other equipment throughout, energy efficiency upgrades including spray foam insulation, new domestic water piping, lighting, electrical - pwr Date: January 14, 2015Permit type: Intake | Permit status: Closed | Completion date: January 14, 2015 | Permit id: 2015-104959-000 | |||||
Pwr - annex/ upgrade exterior south exit stair, brace mep, fire suppression and other equipment, upgrade energy efficiency including new domestic water piping and storage tanks, spray foam insulation, convert floor 1 maintenance room into computer lab, add laundry room at each residential floor - pwr Date: January 14, 2015Permit type: Intake | Permit status: Closed | Completion date: January 14, 2015 | Permit id: 2015-104984-000 | |||||
Plumbing renovation at northwest tower and annex apartments repipe water for entire building Date: February 3, 2015Permit type: Intake | Permit status: Closed | Completion date: February 3, 2015 | Permit id: 2015-114381-000 | |||||
Temporary service for construction Date: April 8, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: April 23, 2015 | Permit id: 2015-146537-000 | |||||
Zoning confirmation letter Permit type: Land use review | Permit status: Closed | Completion date: August 8, 2014 | Permit id: 2014-196053-000 | |||||
Zoning confirmation letter Permit type: Land use review | Permit status: Letter sent | Completion date: August 20, 2014 | Permit id: 2014-196053-000 | |||||
Pbot pw permit Date: May 20, 2015Permit type: Intake pw | Permit status: Assigned | Completion date: August 17, 2014 | Permit id: 2014-196668-000 | |||||
Complaint recd: bedbugs, roaches in laundry room Date: September 18, 2014Permit type: Request | Permit status: Closed | Completion date: October 27, 2014 | Permit id: 2014-199087-000 | |||||
Historic resource review approval of exterior alterations in the alphabet historic district for: alterations to the existing porte cochere and entry way on the west faade of the tower structure. Alterations to the existing egress on the south faade of the annex structure required nonconforming development upgrades including:o pedestrian circulationo surface parking pavingo bicycle parking: short and long termo screening of mechanical equipment and trash enclosure adjustment approval to long term bicycle parking to only allow 24 required long term bicycle spaces. Approval for voluntary additional exterior work as follows:the following locations are pre-approved for future improvements involving the removal of existing chainlink to be replaced with metal guardrail material as is being proposed in this submittal at the south egress, mechanical equipment, trash enclosure and underside of the porte cochere. This pre-approval will be honored for three years from the date of this decision:o th Date: February 5, 2015Permit type: Land use review | Permit status: Completed | Completion date: October 28, 2014 | Permit id: 2014-230057-000 | |||||
Three antenna arrays attached to elevator structure, equipment shelter also on roof Permit type: Application | Permit status: Approved | Completion date: August 18, 2006 | Permit id: 2006-155783-000 | |||||
Plumbing renovation at northwest towerstorm sewer Date: July 23, 2015Permit type: Intake | Permit status: Closed | Completion date: July 23, 2015 | Permit id: 2015-206385-000 | |||||
Street tree root cutting permit Date: September 22, 2015Permit type: D - permit request | Permit status: Permit issued | Completion date: September 22, 2015 | Permit id: 2015-238974-000 | |||||
F1/ fire ladder testing/evaluation Date: October 28, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 28, 2015 | Permit id: 2015-257735-000 | |||||
Upgrades to the fire alarm for elevator upgrades Date: November 10, 2015Permit type: Intake | Permit status: Closed | Completion date: November 10, 2015 | Permit id: 2015-263150-000 | |||||
Emergency response to tree failure Permit type: C - emergency | Permit status: Emergency resolved | Completion date: December 29, 2015 | Permit id: 2015-282433-000 | |||||
Removing cricket wireless equipment off rooftop, including antennas and coax Date: February 17, 2016Permit type: Application | Permit status: Approved | Completion date: February 4, 2016 | Permit id: 2016-116574-000 | |||||
Street tree planting permit Permit type: D - permit request | Permit status: No permit required | Completion date: February 25, 2016 | Permit id: 2016-125832-000 | |||||
Plumbing renovation at northwest towerstorm add on Date: March 30, 2016Permit type: Intake | Permit status: Closed | Completion date: March 30, 2016 | Permit id: 2016-142760-000 | |||||
F15/ rev 01 - revisions include finishes in ground floor laundry room and public spaces, door panels for maintenance rooms, painting of exterior concrete, new ceiling in lobbies, new sink vanity countertops for all unit bathrooms, kitchen casework, plumbing and appliances Date: March 7, 2016Permit type: Intake | Permit status: Closed | Completion date: December 3, 2015 | Permit id: 2014-249130-Rev | |||||
F15/ rev 01 - revisions include new playground on west side of annex, new finishes for public spaces, new ceiling in atrium, new sink vanity countertops for all unit bathrooms, painting of exterior concrete Date: March 7, 2016Permit type: Intake | Permit status: Closed | Completion date: December 3, 2015 | Permit id: 2014-249160-Rev | |||||
Three antenna arrays attached to elevator structure, equipment shelter also on roof Permit type: Application | Permit status: Approved | Completion date: August 18, 2006 | Permit id: 2006-155783-000 | |||||
F1 fire ladder testing evaluation Date: October 28, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 28, 2015 | Permit id: 2015-257735-000 | |||||
Emergency response to tree failure Permit type: C - emergency | Permit status: Emergency resolved | Completion date: December 29, 2015 | Permit id: 2015-282433-000 | |||||
Street tree planting permit Permit type: D - permit request | Permit status: No permit required | Completion date: February 25, 2016 | Permit id: 2016-125832-000 | |||||
F15 rev 01 - revisions include finishes in ground floor laundry room and public spaces, door panels for maintenance rooms, painting of exterior concrete, new ceiling in lobbies, new sink vanity countertops for all unit bathrooms, kitchen casework, plumbing and appliances Date: March 7, 2016Permit type: Intake | Permit status: Closed | Completion date: December 3, 2015 | Permit id: 2014-249130-Rev | |||||
F9 tower install motorized damper in elevator hoistway vent, decommission existing steam boilers, remove (e) exhaust fan and ductwork, new erv -2 and ductwork, remove (e) steam heating units and cap steam lines. Bracing of mechanical equipment and gas lines Date: February 27, 2015Permit type: Intake | Permit status: Closed | Completion date: December 12, 2014 | Permit id: 2014-249150-000 | |||||
F9 annex upgrade exterior south exit stair, brace mep, fire suppression and other equipment, upgrade energy efficiency including new domestic water piping and storage tanks, spray foam insulation, convert floor 1 maintenance room into computer lab, add laundry room at each residential floor. Site and frontage improvements including parking and stormwater Date: February 27, 2015Permit type: Intake | Permit status: Closed | Completion date: December 12, 2014 | Permit id: 2014-249160-000 | |||||
F15 rev 01 - revisions include new playground on west side of annex, new finishes for public spaces, new ceiling in atrium, new sink vanity countertops for all unit bathrooms, painting of exterior concrete Date: March 7, 2016Permit type: Intake | Permit status: Closed | Completion date: December 3, 2015 | Permit id: 2014-249160-Rev | |||||
F9 annex - new dryer vents, vent hoods, gas vents, remove steam heating, replace domestic water heater, install heat recoery units at corridor ventilation equipment Date: February 27, 2015Permit type: Intake | Permit status: Closed | Completion date: December 12, 2014 | Permit id: 2014-249164-000 | |||||
Pwr - tower extensive upgrades to tower including voluntary seismic upgrades, drive thru porte corchere remodel, bracing of mep, fire suppression and other equipment throughout, energy efficiency upgrades including spray foam insulation, new domestic water piping, lighting, electrical - pwr Date: January 14, 2015Permit type: Intake | Permit status: Closed | Completion date: January 14, 2015 | Permit id: 2015-104959-000 | |||||
Pwr - annex upgrade exterior south exit stair, brace mep, fire suppression and other equipment, upgrade energy efficiency including new domestic water piping and storage tanks, spray foam insulation, convert floor 1 maintenance room into computer lab, add laundry room at each residential floor - pwr Date: January 14, 2015Permit type: Intake | Permit status: Closed | Completion date: January 14, 2015 | Permit id: 2015-104984-000 | |||||
Six antennas and equipment on roof Date: December 29, 2006Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: March 15, 2007 | Current use: Utility | Permit id: 2006-164654-000 |