ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Water heater replacement Date: April 6, 2010Permit id: Plm2010-00781 | |||||
"construct a wood access ramp from front door to city sidwalk (slope 12"" to 1"") foundation will be 8"" diameter holes 32"" deep for each support post w/conctete around post base. Post will be 4x4 spaced 6 oc extending 3 above deck for rail support. Floor" Date: December 11, 2008 Value: $3,000Permit id: Com2008-32581 | |||||
Construct a wood access ramp from front door to city sidwalk (slope 12" to 1") foundation will be 8" diameter holes 32" deep for each support post w/conctete around post base. Post will be 4x4 spaced 6 oc extending 3 above deck for rail support. Floor system will be 2x6 joist spaced 16" oc supported by double 2x6 cross headers @ post w/5/4 x 6 decking boards. Construct (2) 5x5 level platforms for each change of direction. Rails will be 2x2 pickets spaced 5" oc w/2x6 cap rail 34" high. All wood will be pressure treated w/galvanized fasteners. (height of door sill from city sidewalk is 64") as per sketch & as per code. Date: December 11, 2008 Value: $3,000Expiration date: June 11, 2009 | Permit id: Com2008-32581 | |||||
Construct a wood access ramp from front door to city sidwalk (slope 12" to 1") foundation will be 8" diameter holes 32" deep for each support post w conctete around post base. Post will be 4x4 spaced 6 oc extending 3 above deck for rail support. Floor system will be 2x6 joist spaced 16" oc supported by double 2x6 cross headers @ post w 5 4 x 6 decking boards. Construct (2) 5x5 level platforms for each change of direction. Rails will be 2x2 pickets spaced 5" oc w 2x6 cap rail 34" high. All wood will be pressure treated w galvanized fasteners. (height of door sill from city sidewalk is 64") as per sketch & as per code. Date: December 11, 2008 Value: $3,000Expiration date: June 11, 2009 | Permit id: Com2008-32581 |