ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Low vol permit for one security alarm system with dev. Date: June 22, 2000Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 222144 | |||||
Electrical permit Date: May 16, 2006Permit status: Finaled | Completion date: November 21, 2006 | Current use: Single family dwelling | Permit id: 421302 | |||||
Mechanical permit Date: September 10, 2008Permit status: Finaled | Current use: Single family dwelling | Permit id: 495403 | |||||
200amp new service Date: December 9, 2013Permit type: Electrical permit | Permit status: Finaled | Completion date: April 11, 2014 | Current use: Single family dwelling | Permit id: 657380 | |||||
Mechanical permit Date: November 21, 2013Permit status: Finaled | Completion date: April 11, 2014 | Current use: Single family dwelling | Permit id: 655827 | |||||
New residential construction revision 01/17/2014 changing bedroomto a den Date: April 9, 2013 Value: $320,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 541079 | |||||
Construct mcdot standard: mc-301. 05 type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be completed as directed by the dps inspector. Date: February 20, 2013Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 266009 | |||||
Dig and backfill trench; build conduit; install cable and associated equipment in accordance with pepco plan no. 3432136. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row Date: November 20, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 304768 | |||||
Install gas service in accordance with washington gas plan no. 238135. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruct Date: November 29, 2013Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 305019 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: September 25, 2015Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 729512 | |||||
Mechanical permit Date: October 14, 2015Permit status: Issued | Current use: Single family dwelling | Permit id: 732259 | |||||
New home on vacant lot Date: June 15, 2015 Value: $200,000Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 705663 | |||||
Restoration of row (privately maintained driveway within the unimproved row) work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to existing improvements in the public right of way caused by construction operations. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (ra-1295 & prorata) (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) Date: June 15, 2015Permit type: Public right of way | Permit status: Issued | Current use: Driveway | Permit id: 332611 | |||||
2 amp service to new sfd (includes 7 telephone; 7 cable; 1 chime) - bldg permit #293561 Date: April 14, 2003Permit type: Electrical permit | Permit status: Finaled | Completion date: October 2, 2003 | Current use: Single family dwelling | Permit id: 302620 | |||||
Model: decatur; lot recorded on 1-28-47 Date: December 23, 2002 Value: $110,000Permit type: Building residential | Permit status: Finaled | Completion date: October 2, 2003 | Current use: Single family dwelling | Permit id: 293561 | |||||
Dw permit: construct the following type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Mcdot standard: mc 301. 01 Date: December 20, 2002Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 219681 | |||||
Electrical permit Date: April 20, 2015Permit status: Issued | Current use: Single family dwelling | Permit id: 709617 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: April 27, 2015Permit type: Electrical permit | Permit status: Finaled | Completion date: September 16, 2015 | Current use: Single family dwelling | Permit id: 710502 | |||||
New home on vacant lot - heating/cooling equip. & ductwork Date: April 9, 2015Permit type: Mechanical permit | Permit status: Finaled | Completion date: September 16, 2015 | Current use: Single family dwelling | Permit id: 708493 | |||||
New home on vacant lot Date: January 28, 2015 Value: $200,000Permit type: Building residential | Permit status: Finaled | Completion date: September 16, 2015 | Current use: Single family dwelling | Permit id: 691890 | |||||
Restoration of row (privately maintained driveway within the unimproved row) work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to existing improvements in the public right of way caused byconstruction operations. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (ra-1285 & prorata) (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) Date: January 28, 2015Permit type: Public right of way | Permit status: Issued | Current use: Driveway | Permit id: 328030 | |||||
Install 1-200amp urd service for single family house in accordance with pepco plan no. 3476479. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: April 10, 2015Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 333873 | |||||
Shed Date: November 5, 2014 Value: $1,300Permit type: Building residential | Permit status: Finaled | Completion date: October 21, 2015 | Current use: Shed | Permit id: 693690 | |||||
Pepco-roberta d. Dickey 301-931-2821/plan-id 5726180/north kensington-decatur avenue/bore roadway feet, also make a 1 x 1 roadcut to check for other utilities, build conduit, install cable and associated equipment. >>>pre-construction meeting required>>pre-construction meeting required>pre-construction meeting requiredpre-construction meeting required<< Date: February 28, 2003Permit type: Public right of way | Permit status: Finaled | Current use: Utility, miscellaneous | Permit id: 220630 |