ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 We will perform a total of three soil borings on the proposed site. One boring will be advanced to feet and two borings will be advanced to feet below site grades. The borings will be located within the bounds of the private property. The borings will be drilled utilizing 3. 25-inch hollow stem, continuous flight augers. The borings will be performed utilizing a truck-mounted drill rig and will generate an approximate 6-inch annulus. After geotechnical exploration is completed, the borings will be backfilled in accordance with ddoe requirements - with bentonite slurry, which has a consistency of two pounds bentonite powder to one gallon water. Date: September 19, 2016Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600341 | |||||
SCORE 56 We will perform a total of three soil borings on the proposed site. One boring will be advanced to feet and two borings will be advanced to feet below site grades. The borings will be located within the bounds of the private property. The borings will be drilled utilizing 3. 25-inch hollow stem, continuous flight augers. The borings will be performed utilizing a truck-mounted drill rig and will generate an approximate 6-inch annulus. After geotechnical exploration is completed, the borings will be backfilled in accordance with ddoe requirements - with bentonite slurry, which has a consistency of two pounds bentonite powder to one gallon water. Date: September 19, 2016Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600341 |