ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
#2114b receptacle outlet Date: December 18, 2014Permit type: Reviews | Permit status: Approved | Completion date: December 18, 2014 | Permit id: 2014-251247-000 | |||||
#2114b receptacle outlet - power Date: December 18, 2014Permit type: Intake | Permit status: Closed | Completion date: December 18, 2014 | Permit id: 2014-251248-000 | |||||
Project for fire alarm addition in 5316c Date: January 20, 2015Permit type: Reviews | Permit status: Approved | Completion date: January 20, 2015 | Permit id: 2015-107458-000 | |||||
Rm 5316c- alteration to the fire alarm system as needed for t. I.- 1 new chime/strobe Date: January 20, 2015Permit type: Intake | Permit status: Closed | Completion date: January 20, 2015 | Permit id: 2015-107638-000 | |||||
#5316c 3-quad receptacle outlets Date: January 28, 2015Permit type: Reviews | Permit status: Approved | Completion date: January 28, 2015 | Permit id: 2015-111257-000 | |||||
#5316c 3-quad receptacle outlets - power Date: January 28, 2015Permit type: Intake | Permit status: Closed | Completion date: January 28, 2015 | Permit id: 2015-111258-000 | |||||
Project for fire alarm upgrades in c407 corridor Date: February 24, 2015Permit type: Reviews | Permit status: Approved | Completion date: February 24, 2015 | Permit id: 2015-123796-000 | |||||
Corridor c407- alteration to the fire alarm system- 1 strobe total Date: February 24, 2015Permit type: Intake | Permit status: Closed | Completion date: February 24, 2015 | Permit id: 2015-123801-000 | |||||
Project for fire alarm upgrades to rms 1204, 1205 & 1206 Date: February 24, 2015Permit type: Reviews | Permit status: Approved | Completion date: February 24, 2015 | Permit id: 2015-123820-000 | |||||
Rms 1204, 1205 & 1206- alterations to the fire alarm as needed- 3 strobes total Date: February 24, 2015Permit type: Intake | Permit status: Closed | Completion date: February 24, 2015 | Permit id: 2015-123825-000 | |||||
Project for fire alarm upgrades to rm 1431 Date: February 24, 2015Permit type: Reviews | Permit status: Approved | Completion date: February 24, 2015 | Permit id: 2015-123844-000 | |||||
Room 1431- alteration to the fire alarm- 1 strobe total Date: February 24, 2015Permit type: Intake | Permit status: Closed | Completion date: February 24, 2015 | Permit id: 2015-123850-000 | |||||
Seven telcom rooms - receptacle outlets Date: March 13, 2015Permit type: Reviews | Permit status: Approved | Completion date: March 13, 2015 | Permit id: 2015-133041-000 | |||||
Seven telcom rooms - receptacle outlets - power Date: March 13, 2015Permit type: Intake | Permit status: Closed | Completion date: March 13, 2015 | Permit id: 2015-133042-000 | |||||
F3/ 3rd floor, room 3314; remodel, new wall, door, flooring, ceiling, elec, paint patch Date: April 20, 2015Permit type: Reviews | Permit status: Approved | Completion date: April 20, 2015 | Permit id: 2015-152922-000 | |||||
F3/ room 3314; new diffusers, new split system Date: May 4, 2015Permit type: Intake | Permit status: Closed | Completion date: April 20, 2015 | Permit id: 2015-152939-000 | |||||
F5/ room 2115, 2nd floor; remove sinks, ceiling, flooring, cabinetry, add new flooring, ceiling, elec, paint, patch Date: April 20, 2015Permit type: Reviews | Permit status: Approved | Completion date: April 20, 2015 | Permit id: 2015-153175-000 | |||||
F5/ new diffusers, new split system Date: April 30, 2015Permit type: Intake | Permit status: Closed | Completion date: April 20, 2015 | Permit id: 2015-153179-000 | |||||
#3314 remodel - power/voice/data/strobe Date: April 21, 2015Permit type: Intake | Permit status: Closed | Completion date: April 21, 2015 | Permit id: 2015-153950-000 | |||||
#2115 remodel - power Date: June 1, 2015Permit type: Intake | Permit status: Closed | Completion date: April 23, 2015 | Permit id: 2015-155457-000 | |||||
Plumbing renovation at ohsu mp room 2115demo sink Date: June 1, 2015Permit type: Intake | Permit status: Closed | Completion date: April 23, 2015 | Permit id: 2015-156324-000 | |||||
B1/ roof - new roof mounted ductless split system Date: April 29, 2015Permit type: Reviews | Permit status: Approved | Completion date: April 29, 2015 | Permit id: 2015-161770-000 | |||||
Roof ductless split sys for room #5503 - power Date: May 1, 2015Permit type: Intake | Permit status: Closed | Completion date: May 1, 2015 | Permit id: 2015-163608-000 | |||||
2nd floor- alteration to the fire alarm as needed for t. I.- add 4 strobes total Date: May 15, 2015Permit type: Intake | Permit status: Closed | Completion date: May 15, 2015 | Permit id: 2015-171694-000 | |||||
#2117 remodel Date: June 5, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 5, 2015 | Permit id: 2015-181597-000 | |||||
#2117 remodel - power Date: June 5, 2015Permit type: Intake | Permit status: Closed | Completion date: June 5, 2015 | Permit id: 2015-181598-000 | |||||
Rm #3314a- alteration to the fire alarm as needed for t. I.- 1 strobe total Date: June 10, 2015Permit type: Intake | Permit status: Closed | Completion date: June 10, 2015 | Permit id: 2015-183974-000 | |||||
F15/ mult pavilion or 5 & 7 surgery light replacement Date: June 15, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2015-185972-000 | |||||
2502a monitor Date: June 19, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 19, 2015 | Permit id: 2015-189028-000 | |||||
2502a monitor - power/data Date: June 19, 2015Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2015-189033-000 | |||||
#5202 compressor Date: June 19, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 19, 2015 | Permit id: 2015-189079-000 | |||||
#5202 compressor - power Date: June 19, 2015Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2015-189083-000 | |||||
4th floor or 5 & 7 surgery light replacement Date: June 25, 2015Permit type: Intake | Permit status: Closed | Completion date: June 25, 2015 | Permit id: 2015-191823-000 | |||||
Fire marshal fixes - change all receptacle outlets within 6 of sinks to gfci & add receptacle outlets to eliminate the need for plug strips used as extension cordspr# 264416 Date: August 26, 2013Permit type: Intake | Permit status: Closed | Completion date: August 26, 2013 | Permit id: 2013-197481-000 | |||||
F5/ fire escape structural testing for certification, multnomah pavillion & emma jones hall Date: May 22, 2015Permit type: Intake | Permit status: Closed | Completion date: May 7, 2014 | Permit id: 2014-153934-000 | |||||
Multnomah pavillion- upgrade dialer for central station monitoring Date: May 23, 2014Permit type: Intake | Permit status: Closed | Completion date: May 23, 2014 | Permit id: 2014-161027-000 | |||||
Room 5207a- add 1 device for t. I.- Date: July 9, 2014Permit type: Intake | Permit status: Closed | Completion date: July 9, 2014 | Permit id: 2014-181463-000 | |||||
F1/ oshu multnomah pavillion 2nd floor/ remodel west wing for expansion of the chm - remove and replace finishes, convert mailroom to restrooms, convert offices to exam rooms. Remove fixtures and reconfigure/ upgrade as needed Date: August 7, 2014Permit type: Reviews | Permit status: Approved | Completion date: August 7, 2014 | Permit id: 2014-194931-000 | |||||
F1/ oshu multnomah pavillion 2nd floor/ remodel west wing for expansion of the chm - remove and replace finishes, convert mailroom to restrooms, convert offices to exam rooms. Remove fixtures and reconfigure/ upgrade as needed; all interior work only Date: August 25, 2014Permit type: Intake | Permit status: Closed | Completion date: August 7, 2014 | Permit id: 2014-194935-000 | |||||
F1/ mechanical for multnomah pavillion second floor cmh expansion Date: August 25, 2014Permit type: Intake | Permit status: Closed | Completion date: August 7, 2014 | Permit id: 2014-194949-000 | |||||
F9/ corridor c114 - remove and replace ceiling tile grid and light fixtures Date: August 15, 2014Permit type: Reviews | Permit status: Approved | Completion date: August 15, 2014 | Permit id: 2014-198918-000 | |||||
Plumbing renovation at ohsu multnomah pavilion chm expansion 2nd floor fixtures Date: October 14, 2014Permit type: Intake | Permit status: Closed | Completion date: August 18, 2014 | Permit id: 2014-199796-000 | |||||
Corridor c114 - replace ceiling grid & light fixtures - power Date: August 20, 2014Permit type: Intake | Permit status: Closed | Completion date: August 20, 2014 | Permit id: 2014-201270-000 | |||||
2nd fl chm expansion - power/voice/data Date: October 13, 2014Permit type: Intake | Permit status: Closed | Completion date: August 21, 2014 | Permit id: 2014-201537-000 | |||||
#2441a receptacle outlets Date: September 24, 2014Permit type: Reviews | Permit status: Approved | Completion date: September 24, 2014 | Permit id: 2014-216960-000 | |||||
#2441a receptacle outlets - power Date: September 24, 2014Permit type: Intake | Permit status: Closed | Completion date: September 24, 2014 | Permit id: 2014-216980-000 | |||||
Sprinkler-t. I northwest wing: 44(e) standard response to be sprinklers replaced with q. R. Concealed. 6 q. R. Concealed added. 5 q. R. Sprinklers reworked in southwest wing Date: October 27, 2014Permit type: Intake | Permit status: Closed | Completion date: October 23, 2014 | Permit id: 2014-229335-000 | |||||
Alterations to fire alarm system as needed for t. I.- 31 devices total 22- strobes8- smoke detectors1- nac panel Date: October 27, 2014Permit type: Intake | Permit status: Closed | Completion date: October 27, 2014 | Permit id: 2014-230334-000 | |||||
#3303 quad receptacle & data outlets Date: July 23, 2015Permit type: Reviews | Permit status: Approved | Completion date: July 23, 2015 | Permit id: 2015-206084-000 | |||||
Pavilion cafe receptacles (double duplex) Date: August 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: August 18, 2015 | Permit id: 2015-220060-000 | |||||
Pavilion cafe receptacles (double duplex) - power Date: August 18, 2015Permit type: Intake | Permit status: Closed | Completion date: August 18, 2015 | Permit id: 2015-220089-000 | |||||
#2116,18, move ac receptacles at windows Date: August 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: August 18, 2015 | Permit id: 2015-220099-000 | |||||
#2116,18, move ac receptacles at windows- power Date: August 18, 2015Permit type: Intake | Permit status: Closed | Completion date: August 18, 2015 | Permit id: 2015-220103-000 | |||||
Approval of exterior alterations in the marquam hill plan district to include: installation of one patio-mounted ac unit;the approval is per the approved site plans, exhibits c-1 through c-5, signed and dated 10/26/2015, subject to the following conditions:a. As part of the building permit application submittal, the following development-related condition (b) must be noted on each of the four required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page- case file lu 15-220402 dz. All requirements must be graphically represented on the site plan, landscape, or other required plan and must be labeled required. B. The ac unit proposed to be mounted to the 5th floor patio of the multnomah pavilion is to be located within the area indicated on the approved plans, exhibits c-1 through c-5; along the east facing wall of the patio; no less than 25 from the existing metal railing; no less than 4 from a Date: November 2, 2015Permit type: Land use review | Permit status: Completed | Completion date: August 21, 2015 | Permit id: 2015-220402-000 | |||||
Plumbing renovation at ohsu multnomah pavillion room 2128 Date: October 9, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 9, 2015 | Permit id: 2015-248888-000 | |||||
Plumbing renovation at ohsu mnp rm 2128demo sinkwork done by ohsu plumbers Date: October 9, 2015Permit type: Intake | Permit status: Closed | Completion date: October 9, 2015 | Permit id: 2015-248889-000 | |||||
Plumbing renovation at ohsu multnomah pavilion room 2121 Date: October 9, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 9, 2015 | Permit id: 2015-248891-000 | |||||
Plumbing renovation at ohsu mnp rm 2121demo wc, lav, showerwork done by ohsu plumbers Date: October 9, 2015Permit type: Intake | Permit status: Closed | Completion date: October 9, 2015 | Permit id: 2015-248899-000 | |||||
Plumbing renovation at ohsu multnomah pavilion room 3302 Date: October 9, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 9, 2015 | Permit id: 2015-248982-000 | |||||
Plumbing renovation at ohsu multnomah pavilion room 3302r/r sinkwork done by ohsu plumbers Date: October 9, 2015Permit type: Intake | Permit status: Closed | Completion date: October 9, 2015 | Permit id: 2015-248986-000 | |||||
#5423 split system Date: November 20, 2015Permit type: Reviews | Permit status: Approved | Completion date: November 20, 2015 | Permit id: 2015-267537-000 | |||||
#5423 split system - power Date: November 20, 2015Permit type: Intake | Permit status: Closed | Completion date: November 20, 2015 | Permit id: 2015-267538-000 | |||||
B2/ installation of new roof top mounted ductless split system, see lu 15-220402-dz Date: December 8, 2015Permit type: Reviews | Permit status: Approved | Completion date: December 8, 2015 | Permit id: 2015-274285-000 | |||||
B2/ installation of new roof top mounted ductless split system, see lu 15-220402-dz Date: January 19, 2016Permit type: Intake | Permit status: Closed | Completion date: December 8, 2015 | Permit id: 2015-274286-000 | |||||
#1404 3 receptacles Date: February 10, 2016Permit type: Reviews | Permit status: Approved | Completion date: February 10, 2016 | Permit id: 2016-119570-000 | |||||
#1404 3 receptacles - power Date: February 10, 2016Permit type: Intake | Permit status: Closed | Completion date: February 10, 2016 | Permit id: 2016-119576-000 | |||||
Penthouse heat trace Date: March 7, 2016Permit type: Reviews | Permit status: Approved | Completion date: March 7, 2016 | Permit id: 2016-131514-000 | |||||
Penthouse heat trace - power Date: March 7, 2016Permit type: Intake | Permit status: Closed | Completion date: March 7, 2016 | Permit id: 2016-131516-000 | |||||
#4203 brk rm gfci receptacles Date: March 24, 2016Permit type: Reviews | Permit status: Approved | Completion date: March 24, 2016 | Permit id: 2016-140344-000 | |||||
#4203 break room gfci receptacles - power Date: March 24, 2016Permit type: Intake | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2016-140347-000 | |||||
#1113 receptacle outlet Date: March 24, 2016Permit type: Reviews | Permit status: Approved | Completion date: March 24, 2016 | Permit id: 2016-140356-000 | |||||
#1113 receptacle outlet - power Date: March 24, 2016Permit type: Intake | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2016-140357-000 | |||||
#5214 two quad receptacle outlets Date: April 18, 2016Permit type: Reviews | Permit status: Approved | Completion date: April 18, 2016 | Permit id: 2016-154843-000 | |||||
#5214 two quad receptacle outlets - power Date: April 18, 2016Permit type: Intake | Permit status: Closed | Completion date: April 18, 2016 | Permit id: 2016-154845-000 | |||||
Approval of exterior alterations in the marquam hill plan district to include: installation of one patio-mounted ac unit;the approval is per the approved site plans, exhibits c-1 through c-5, signed and dated 10 26 2015, subject to the following conditions:a. As part of the building permit application submittal, the following development-related condition (b) must be noted on each of the four required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page- case file lu 15-220402 dz. All requirements must be graphically represented on the site plan, landscape, or other required plan and must be labeled required. B. The ac unit proposed to be mounted to the 5th floor patio of the multnomah pavilion is to be located within the area indicated on the approved plans, exhibits c-1 through c-5; along the east facing wall of the patio; no less than 25 from the existing metal railing; no less than 4 from a Date: November 2, 2015Permit type: Land use review | Permit status: Completed | Completion date: August 21, 2015 | Permit id: 2015-220402-000 | |||||
Plumbing renovation at ohsu multnomah pavilion room 3302r r sinkwork done by ohsu plumbers Date: October 9, 2015Permit type: Intake | Permit status: Closed | Completion date: October 9, 2015 | Permit id: 2015-248986-000 | |||||
B2 installation of new roof top mounted ductless split system, see lu 15-220402-dz Date: December 8, 2015Permit type: Reviews | Permit status: Approved | Completion date: December 8, 2015 | Permit id: 2015-274285-000 | |||||
B2 installation of new roof top mounted ductless split system, see lu 15-220402-dz Date: January 19, 2016Permit type: Intake | Permit status: Closed | Completion date: December 8, 2015 | Permit id: 2015-274286-000 | |||||
F5 fire escape structural testing for certification, multnomah pavillion & emma jones hall Date: May 22, 2015Permit type: Intake | Permit status: Closed | Completion date: May 7, 2014 | Permit id: 2014-153934-000 | |||||
F3 3rd floor, room 3314; remodel, new wall, door, flooring, ceiling, elec, paint patch Date: May 4, 2015Permit type: Intake | Permit status: Closed | Completion date: April 20, 2015 | Permit id: 2015-152934-000 | |||||
F3 room 3314; new diffusers, new split system Date: May 4, 2015Permit type: Intake | Permit status: Closed | Completion date: April 20, 2015 | Permit id: 2015-152939-000 | |||||
F5 room 2115, 2nd floor; remove sinks, ceiling, flooring, cabinetry, add new flooring, ceiling, elec, paint, patch Date: April 30, 2015Permit type: Intake | Permit status: Closed | Completion date: April 20, 2015 | Permit id: 2015-153176-000 | |||||
F5 new diffusers, new split system Date: April 30, 2015Permit type: Intake | Permit status: Closed | Completion date: April 20, 2015 | Permit id: 2015-153179-000 | |||||
#3314 remodel - power voice data strobe Date: April 21, 2015Permit type: Intake | Permit status: Closed | Completion date: April 21, 2015 | Permit id: 2015-153950-000 | |||||
B1 roof - new roof mounted ductless split system Date: April 29, 2015Permit type: Reviews | Permit status: Approved | Completion date: April 29, 2015 | Permit id: 2015-161770-000 | |||||
F15 mult pavilion or 5 & 7 surgery light replacement Date: June 15, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2015-185972-000 | |||||
2502a monitor - power data Date: June 19, 2015Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2015-189033-000 | |||||
Alter 4th floor se cor. Room no. 4252 Date: February 18, 2000Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: April 4, 2000 | Current use: Institutional | Permit id: 1999-130641-000 | |||||
Remodel 4th floor labs rooms 414, 416 & 418 Date: April 6, 2000Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: June 21, 2000 | Current use: Institutional | Permit id: 1999-130655-000 |