ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Install catv power supply pepco pole-781422-6107 see permit 2298 for billing star power Date: October 16, 2000Permit type: Electrical permit | Permit status: Issued | Current use: Business building | Permit id: 232394 | |||||
Electrical permit Date: March 18, 2003Permit status: Finaled | Completion date: April 22, 2003 | Current use: Single family dwelling | Permit id: 300254 | |||||
Addition of second story living space and accessory structure garage/office =(1946 sqft) Date: November 30, 2015 Value: $461,000Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 736236 | |||||
Electrical permit Date: January 27, 2012Permit status: Issued | Current use: Single family dwelling | Permit id: 589841 | |||||
Electrical permit Date: February 29, 2016Permit status: Issued | Current use: Single family dwelling | Permit id: 746317 | |||||
Deck 3 sqft Date: April 15, 2011 Value: $4,800Permit type: Building residential permit | Permit status: Finaled | Current use: Deck | Permit id: 566020 | |||||
Existing residential - 2 amp temp pole for construction Date: June 7, 2016Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 758533 | |||||
Abandongas service in accordance with washington gas plan no. 703881. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: September 29, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 354595 | |||||
Remove 1 pole, head guy and down guy, install 1 pole, down guy, head guy, trench and backfill and transfer oh to underground service to heavy up residencein accordance with pepco plan no. 3507739. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: May 3, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 352348 |