ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Street tree removal /replant permit Date: June 25, 2015Permit type: A - research | Permit status: Title 11 permit with cond | Completion date: June 16, 2015 | Permit id: 2015-186991-000 | |||||
Street tree pruning permit Date: June 25, 2015Permit type: D - permit request | Permit status: Permit issued | Completion date: June 25, 2015 | Permit id: 2015-187005-000 | |||||
Replace oil boiler with high efficiency gas boiler, 10 mbh, vent through existing chimney with pvc all the way to the roof, existing louver for combustion air sized at 24x24 high and low minimum, structural holddown attached, gas piping Date: October 16, 2014Permit type: Intake | Permit status: Closed | Completion date: October 16, 2014 | Permit id: 2014-226356-000 | |||||
The appellants prevailed, and the decision was modified. Grant the appeal and modify the administrative decision of approval as follows: remove light fixtures 1 through and all associated conduit on the contributing portion of the building; and retain light fixtures 11 through 15 and all associated conduit on the non-contributing portion of the building. Subject to the following conditions, per the approved site plan (exhibit h-13):1. Obtain an electrical permit to alter the electrical connection to the light fixtures to remain;2. Patch and repair stucco where fixtures and conduit are removed and paint to match the respective building surface. 3. Add metal visors that match the simple design of the lights to fixtures 11 through 15; and4. Paint light fixtures 11 through 15, visors and associated conduit to match the respective building surface. Date: January 17, 2013Permit type: Land use review | Permit status: Completed | Completion date: March 5, 2012 | Permit id: 2012-117519-000 | |||||
Installation of access control devices. Includes a base panel, 3 access modules and 14 iclass prox readers. Faxed Date: July 17, 2012Permit type: Electrical inspections | Permit status: Approved | Completion date: September 28, 2015 | Permit id: 2012-162653-000 | |||||
Street tree removal replant permit Date: June 25, 2015Permit type: A - research | Permit status: Title 11 permit with cond | Completion date: June 16, 2015 | Permit id: 2015-186991-000 | |||||
Adding grab bars, relocating lav & replacing door to unisex restrm in church entry. (wc needs to be replaced for full ada compliance) Date: March 21, 2003Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: August 20, 2003 | Current use: Educational | Permit id: 2003-111839-000 | |||||
Change of occupancy from e1 to a3; remodel interior classrooms, take 2 classrooms plus hallway and create 1 large multi-purpose classrom Date: June 25, 2003Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: August 21, 2003 | Current use: Educational | Permit id: 2003-115981-000 | |||||
Add walls to existing carport to create a storage shed and add a new carport to the west side of existing structure Date: May 29, 2003Client: Northeast Coalition Of Neighbors | Permit type: Addition | Permit status: Final | Completion date: August 21, 2003 | Current use: Utility | Permit id: 2003-115987-000 | |||||
Remove existing asphalt to create basketball court and soccer field. Date: March 14, 2006Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Under inspection | Current use: Educational | Permit id: 2005-160244-000 | |||||
Removed exterior wall framing to restore original exterior door opening (with sidelights) back to original condition. Date: August 27, 2013Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: August 28, 2013 | Current use: Educational | Permit id: 2013-181658-000 |