ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 66 Paving; driveway(s) close existing, paving; driveway(s) new -residential, paving; sidewalk (porous pervious), paving; sidewalk(s), paving; curb & gutter(s), projections; porch & steps, fixture; retaining wall to 42" Contractor: Mhibrookland, LlcPermit status: 11 | Expiration date: June 18, 2018 | Permit id: 0 | |||||
SCORE 66 Streetscape improvements for 22-townhome development in brookland. Scope of work includes a new driveway on 7th st ne, new sidewalk, retaining wall, and curb and gutter. Projections are proposed along 7th st ne for townhome porch and steps. The project is also relocating the existing 14-foot driveway on jackson street ne further west as requested by the office of planning during the pud process. Zc order number 15-02. Date: March 7, 2017 Contractor: Mhibrookland, LlcPermit type: Paving; driveway | Permit status: Resubmitted | Expiration date: June 18, 2018 | Permit id: 0 | |||||
SCORE 66 Streetscape improvements for 22-townhome development in brookland. Scope of work includes a new driveway on 7th st ne, new sidewalk, retaining wall, and curb and gutter. Projections are proposed along 7th st ne for townhome porch and steps. The project is also relocating the existing 14-foot driveway on jackson street ne further west as requested by the office of planning during the pud process. Zc order number 15-02. Contractor: Mhibrookland, LlcPermit status: Revise and resubmit | Expiration date: June 18, 2018 | Permit id: 0 | |||||
SCORE 100 Install anodes in existing ts wr#3210437 Date: August 2, 2017 Contractor: Washington GasPermit type: Excavation; cathodic protection | Permit status: Issued | Expiration date: November 6, 2017 | Permit id: Pa220000 | |||||
SCORE 66 Paving; driveway(s) close existing, paving; driveway(s) new -residential, paving; sidewalk (porous pervious), paving; sidewalk(s), paving; curb & gutter(s), projections; porch & steps, fixture; retaining wall to 42" Contractor: Mhibrookland, LlcPermit status: 1 | Expiration date: June 18, 2018 | Permit id: 0 | |||||
SCORE 66 Streetscape improvements for 22-townhome development in brookland. Scope of work includes a new driveway on 7th st ne, new sidewalk, retaining wall, and curb and gutter. Projections are proposed along 7th st ne for townhome porch and steps. The project is also relocating the existing 14-foot driveway on jackson street ne further west as requested by the office of planning during the pud process. Zc order number 15-02. Contractor: Mhibrookland, LlcPermit status: Approved (pending payment | Expiration date: June 18, 2018 | Permit id: 0 | |||||
SCORE 100 Install anodes in existing ts wr#3210437 Date: August 29, 2017 Contractor: Washington GasPermit status: Issued | Expiration date: November 6, 2017 | Permit id: Pa220000 | |||||
SCORE 95 Construction staging area Date: September 7, 2017 Contractor: Wash Gas And Light CoPermit status: Issued | Expiration date: October 20, 2017 | Permit id: Pa10462832 |