ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Interior remodel: add new walls to create shell space on second floor, change of occupancy for second floor from f1 to b, 1st fl restroom upgrades and remodel of interior stairs; parking lot upgrades. No occupancy this permit. Date: April 3, 2015Permit type: Application | Permit status: Approved | Completion date: November 12, 2014 | Permit id: 2014-236681-000 | |||||
Fixture cap Date: December 29, 2014Permit type: Plumbing inspections | Permit status: Approved | Completion date: December 30, 2014 | Permit id: 2014-254265-000 | |||||
Nuway ti work-200amp feeder, (8) circuits Date: April 27, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2015-159561-000 | |||||
Install (5) 2-ton ductless split systems, operable windows at 2 sf for 5,0 sf space w/o walls, demo existing hvac Date: May 5, 2015Permit type: Intake | Permit status: Approved | Completion date: May 5, 2015 | Permit id: 2015-165044-000 | |||||
Relocate lav & toilet Date: June 2, 2015Permit type: Plumbing inspections | Permit status: Approved | Completion date: June 3, 2015 | Permit id: 2015-179460-000 | |||||
Demo walls on 2nd floor, cap faucets, space to be used for future tenant, 2nd floor restroom to remain Date: October 28, 2014Permit type: Application | Permit status: Approved | Completion date: October 28, 2014 | Permit id: 2014-231077-000 | |||||
Approval of design review for minor exterior alterations to the north faade of the nu-way building in the central eastside subdistrict of the central city plan district to include the following: infill one door opening with concrete to match existing concrete walls; and insert one new metal door and frameapproved, per the approved site plans, exhibits c-1 through c-3, signed and dated december 16, 2014, subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 3. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-232696 dz. No field changes allowed. Date: December 17, 2014Permit type: Land use review | Permit status: Completed | Completion date: November 3, 2014 | Permit id: 2014-232696-000 | |||||
Install (5) 2-ton ductless split systems, operable windows at 2 sf for 5,0 sf space w o walls, demo existing hvac Date: May 5, 2015Permit type: Intake | Permit status: Approved | Completion date: May 5, 2015 | Permit id: 2015-165044-000 |