ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 96 Replace existing 200-amp single phase meter base that had been tapped for two 200-amp panels with ne Date: June 10, 2011 Contractor: Robert LeverettPermit type: Electrical | Permit status: Issued | Expiration date: February 12, 2012 | Permit id: Ele11-01805 | |||||
SCORE 82 Self certification Date: October 6, 2010 Contractor: Richard HoodPermit status: Authorized | Permit id: 28057 | |||||
SCORE 96 Install 400-amp single phase meter base and riser to replace a 200-amp meter base that had been tapp Date: June 10, 2011 Contractor: Robert LeverettPermit type: Electrical | Permit status: Cancelled | Permit id: Ele11-01802 | |||||
SCORE 82 Install 400-amp single phase meter base and riser to replace a 200-amp meter base that had been tapp Date: June 10, 2011 Contractor: Richard HoodPermit type: Electrical | Permit status: Cancelled | Permit id: Ele11-01802 | |||||
SCORE 82 Replace existing 200-amp single phase meter base that had been tapped for two 200-amp panels with ne Date: June 10, 2011 Contractor: Richard HoodPermit type: Electrical | Permit status: Issued | Expiration date: February 12, 2012 | Permit id: Ele11-01805 | |||||
Research Date: May 31, 2012Permit status: Open | Permit id: Rsr12-00734 | |||||
SCORE 99 Lateralemergency contact: earl phillips 410-0579 Date: March 14, 2013 Contractor: Earl PhillipsPermit type: Sewer connection | Permit status: Complete | Permit id: Swr13-00894 |