ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Excavate test pits within the county right of way. Pre-construction meeting required. Contact mc dps inspector peggy urban @ 301-370-3673. Work shall comply with the current montgomery county specifications for utility construction permit and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. Restoration shall be completed as directed by the dps inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: July 23, 2014Permit type: Public right of way | Permit status: Issued | Current use: Soil boring | Permit id: 316159 | |||||
Restore right of way. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Remove old concrete driveway apron and replace with new. Designed to be determined by the dps inspector in the field. Date: March 13, 2004Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 227377 |