ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Private drainage connection to row install a roof/sump pump drain connection within the county right of way. Curb face will be saw cut to accept a maximum 4 diameter pvc drainage pipe. Concrete epoxy non? Shrink grout will be used to patch the cut curb face and above the drainpipe. Roof/sump pump drain will be connected into the county storm drain structure or pipe if directed by the dps inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. (requires ra# for sump pump) work shall be complete as directed by the dps row inspector. Permit type: Public right of way | Permit status: Stop work | Current use: Driveway | Permit id: 320886 |