Building Permits at 3005 Glenmore Ave Baltimore MD


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 3005 Glenmore Ave Baltimore MD over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Use as a single family dwelling
Date:  June 6, 2014

Permit id: Use2013-04019
2014/06/060953005 Glenmore Ave Baltimore Md
Exact change out of gas 1 0 btu boiler existing backflow preventor device as per code.
Date:  May 16, 2014
Value:   $1,000

Permit id: Com2014-10293
2014/05/161000953005 Glenmore Ave Baltimore Md
All work is complete original permit description:(com2013-19370)install a drain to the 2nd floor lavatory sink on first floor install a new lavatory faucet a new kitchen faucet new drain & water to the kitchen sink repipe basement water lines in cpv
Date:  May 13, 2014

Permit id: Com2014-09870
2014/05/130953005 Glenmore Ave Baltimore Md
Original permit description:(com2013-19508)(1) 1 amp panels (20) circuits grounding and bonding as per code
Date:  April 16, 2014

Permit id: Com2014-07819
2014/04/160953005 Glenmore Ave Baltimore Md
Running gas lines for a water heater 40k boiler 40k and stove 40k as per code.
Date:  March 28, 2014

Permit id: Com2014-06087
2014/03/280953005 Glenmore Ave Baltimore Md
Disconnecting gas fixtures and caping to test for leaks. After inspection connecting back together - boiler 2 0 & water heater 0 as per code.
Date:  February 18, 2014
Value:   $850

Permit id: Com2014-02958
2014/02/18850953005 Glenmore Ave Baltimore Md
"replacing main water service from the meter to the house with 3/4"" l copper and backflow preventer as per code. All work on private propery"
Date:  December 20, 2013
Value:   $1,850

Permit id: Com2013-27570
2013/12/201850953005 Glenmore Ave Baltimore Md
Installing tub faucet vanity faucet kitchen faucet laundry box and running new water lines from the main to the risers to the water heater and to the kitchen sink as per code.
Date:  November 20, 2013
Value:   $2,000

Permit id: Com2013-25057
2013/11/202000953005 Glenmore Ave Baltimore Md
(1) 1 amp panels (20) circuits grounding and bonding as per code
Date:  September 13, 2013
Value:   $2,400

Permit id: Com2013-19508
2013/09/132400953005 Glenmore Ave Baltimore Md
Install a drain to the 2nd floor lavatory sink on first floor install a new lavatory faucet a new kitchen faucet new drain & water to the kitchen sink repipe basement water lines in cpvc install a new washer box. Also repiping the supply & returns to
Date:  September 12, 2013
Value:   $5,050

Permit id: Com2013-19370
2013/09/125050953005 Glenmore Ave Baltimore Md
Install a drain to the 2nd floor lavatory sink on first floor install a new lavatory faucet a new kitchen faucet new drain & water to the kitchen sink repipe basement water lines in cpvc install a new washer box. Also repiping the supply & returns to the boiler that had been removed as per code.
Date:  September 12, 2013
Value:   $5,050

Expiration date: March 12, 2014 | Permit id: Com2013-19370
2013/09/125050953005 Glenmore Ave Baltimore Md
Replacing main water service from the meter to the house with 3/4" l copper and backflow preventer as per code. All work on private propery
Date:  December 20, 2013
Value:   $1,850

Expiration date: June 20, 2014 | Permit id: Com2013-27570
2013/12/201850953005 Glenmore Ave Baltimore Md
All work is complete original permit description:(com2013-19370)install a drain to the 2nd floor lavatory sink on first floor install a new lavatory faucet a new kitchen faucet new drain & water to the kitchen sink repipe basement water lines in cpvc install a new washer box. Also repiping the supply & returns to the boiler that had been removed as per code.
Date:  May 13, 2014

Expiration date: June 13, 2014 | Permit id: Com2014-09870
2014/05/130953005 Glenmore Ave Baltimore Md
Interior demolition category 1/non-structural alterations/interior work 1 sq. Ft. - remove (3) non-bearing walls and make good openings as per sketch as per code. Demo only separate permit required for tenant fit-out
Date:  December 14, 2015
Value:   $5,000

Expiration date: June 14, 2016 | Permit id: Com2015-29899
2015/12/145000953005 Glenmore Ave Baltimore Md
Interior demolition category 1 non-structural alterations interior work 1 sq. Ft. - remove (3) non-bearing walls and make good openings as per sketch as per code. Demo only separate permit required for tenant fit-out
Date:  December 14, 2015
Value:   $5,000

Expiration date: June 14, 2016 | Permit id: Com2015-29899
2015/12/145000953005 Glenmore Ave Baltimore Md
Replacing main water service from the meter to the house with 3 4" l copper and backflow preventer as per code. All work on private propery
Date:  December 20, 2013
Value:   $1,850

Expiration date: June 20, 2014 | Permit id: Com2013-27570
2013/12/201850953005 Glenmore Ave Baltimore Md
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.