Building Permits at 3001 Evergreen Ave, West Sacramento, CA San Diego Ca


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 3001 Evergreen Ave, West Sacramento, CA San Diego Ca over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Date:  February 6, 2003

Permit id: 03-02-016 | Parcel: 067120029000
2003/02/060953001 Evergreen Ave, West Sacramento, Ca San Diego Ca
Date:  April 28, 2005

Permit id: 05-04-361 | Parcel: 067120029000
2005/04/280953001 Evergreen Ave, West Sacramento, Ca San Diego Ca
Date:  April 4, 2011

Permit id: 11-04-004 | Parcel: 067120029000
2011/04/040953001 Evergreen Ave, West Sacramento, Ca San Diego Ca
Wo 15070. Traffic control detour plans for harbor blvd hwy . Plan sheets der-1, de-2, de-3, de-5, de-6, de-7. Special conditions: 14 days notice prior to installation of detours is required as well as a preconstruction meeting. (see attached email for response to tcp comments on de-2, de-6, and de-7). Changes can be made by inspector if required. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroa
Date:  April 1, 2010

Permit id: 10-0119 | Parcel: 067120029000
2010/04/010953001 Evergreen Ave, West Sacramento, Ca San Diego Ca
Wo 150 . Special condition: work is to be done between the hours of 8: pm and 6: am, sunday nigth thru friday night. Road widening, traffic signal system, curb ramp upgrades and ac overlay per lt cows--001. Contractor to provide pedestrian crossing during non-construction hours. Changes can be made by inspector if required. A preconstruction meeting is required. Call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection i
Date:  April 1, 2010

Permit id: 10-0118 | Parcel: 067120029000
2010/04/010953001 Evergreen Ave, West Sacramento, Ca San Diego Ca
W. O. 99022 p. M. 41449679 1. All work to be preformed after 7: pm. Contact drew gidlif @ 916-617-4645 to negotiate the schedule. 2. Indirect survey of gas pipeline to assess corrosion protection. Survey consists of drilling " holes through asphalt or concrete at each end of the casing. 3. All work within the right-of-way shall be constructed per state and federal accessibility standards. 4.. All work shall comply with city standards and details. Final engineering encroachment inspection
Date:  November 10, 2011

Permit id: 11-0225 | Parcel: 067120029000
2011/11/100953001 Evergreen Ave, West Sacramento, Ca San Diego Ca
Date:  December 6, 2007

Permit id: 07-12-026 | Parcel: 067120029000
2007/12/060953001 Evergreen Ave, West Sacramento, Ca San Diego Ca
Date:  June 18, 2008

Permit id: 08-06-070 | Parcel: 067120029000
2008/06/180953001 Evergreen Ave, West Sacramento, Ca San Diego Ca
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.