ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
West capitol commons demo and grading. This permit does not include any work within west capitol avenue Date: November 5, 2012Permit id: 12-0302 | Parcel: 010421012000 | |||||
Date: November 1, 2002Permit id: 80-1069 | |||||
Tower bridge work; originally a duplicate number 01-0754 Date: November 1, 2002Permit id: 80-3073 | |||||
All work shall conform to city standard specifications and state regulations including but not limited to traffic control & standard specifications. 95% relative compaction of subgrade a minimum of 0. 5 ft deep, class 2 ab - 95%, 12" lengths of #4 re-bar embedded at 18 in centers & core drill retrofitted a minimum of 4 in into existing concrete & epoxy filling annular voids. Sidewalk as well as curb & gutter width shall be consistent with adjacent improvements and shall be consistent with repai Date: May 14, 2004Permit id: 04-0569 | |||||
Wo#15291 pg&e to excavate a 5 x 8 bellhole @ 3 w capitol ave corner of 3rd st & 805 s river rd. To abandon an exisiting 3" high pressure gas main. Backfill with city standard detail #501. Improvements proposed for the city of west sacramentos tbg east phase project. (proj. Engr - t. Wong)a pre-construction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Call 916 617-4692. Any damage to th Date: December 23, 2009Permit id: 09-0368 | Parcel: 010421012000 |