ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Replace with new the missing balusters at balustrade total three at p/hall 2nd story. Remove all work related debris. Non s. W. P. Contractor Date: June 28, 2010 Value: $112Permit type: Gc | Permit id: Eb00871 | |||||
Replace with new the missing baluster (1) guard rail at public hall ,2nd story . Remove all work related debris. Non s. W. P. Contractor must s Date: July 16, 2010 Value: $135Permit type: Gc | Permit id: Eb04432 | |||||
Restore electricity to basement. Date: February 15, 2003Permit type: Elec | Permit id: E315937 | |||||
Replace skylight glass at roof. (field mesurement) Date: August 17, 1998 Value: $80Permit type: Gc | Permit id: E000365 | |||||
Replace with new the missing balusters at balustrade total three at p hall 2nd story. Remove all work related debris. Non s. W. P. Contractor Date: June 28, 2010 Value: $112Permit type: Gc | Permit id: Eb00871 | |||||
Remove all obstructions from wash basin in the bathroom located at apt #3 3rd story remove all work related debris. Non s. W. P. Contractor Date: July 19, 2010Permit type: Stopag | Permit id: Eb04299 | |||||
As per mini rc #k301520a (emsl) and hpd specification, perform phase contrast microscopy (pcm) analysis of 04 air samples for fiber content utilizing Date: March 7, 2003Permit type: Asbest | Permit id: E316211 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: January 31, 2003Permit type: Util | Permit id: E314632 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore (heat/ or hot water) to building. Note: contractor must c Permit type: Heat | Permit id: E315479 | |||||
Perform asbestos abatement work as per hpd specification throughout boiler room, on 23 ft. Of pipe insulation, and 3 sq. Ft. Of breeching sealant in Date: March 5, 2003Permit type: Asbest | Permit id: E316210 | |||||
Repair all leaks in basement. Install shut-off valves at base of risers. Restore water to boiler and water heaters. Note: contractor must contact Date: February 14, 2003Permit type: Plumb | Permit id: E315477 | |||||
As per mini rc #k301520a (emsl) and hpd specification perform polarized light microscopy (plm) analysis of 02 samples for asbestos content utilizing p Date: February 20, 2003Permit type: Asbest | Permit id: E316209 | |||||
Remove trash in basement approximately 15 cubic yards. Note: contractor must contact hpd at 718 636-3023 with start date. Contractor must sign an Date: February 21, 2003Permit type: Gc | Permit id: E315931 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore (heat/ or hot water) to building. Note: contractor must c Permit type: Heat | Permit id: E315479 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore (heat/ or hot water) to building. Note: contractor must c Permit type: Heat | Permit id: E315479 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore (heat or hot water) to building. Note: contractor must c Permit type: Heat | Permit id: E315479 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore (heat or hot water) to building. Note: contractor must c Permit type: Heat | Permit id: E315479 |