Install of led lights-(2) circuits Date: December 3, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: December 17, 2014 | Permit id: 2014-244958-000 | |||||
Programmatic permit - street tree pruning permit Date: October 15, 2015Permit type: A - research | Permit status: Title 11 permit with cond | Completion date: August 28, 2015 | Permit id: 2015-227797-000 | |||||
Approval of design review for the construction of the new surgery/icu expansion project at legacy emanuel medical center. Approval of a modification through design review to increase the maximum height of the surgery/icu expansion building from 75 to 80 (33. 120. 215. B. 3). Approval of a modification through design review to reduce the minimum street setback along n. Kerby from 40 to 0 for the surgery/icu expansion. Approval of a modification through design review to reduce the minimum window requirement for the side walls of the oriel/bay window feature that projects into n. Kerby avenue from 10% to 0% (bds code guide for window projections into public right-of-way - ossc/32/#1). Approval of a modification through design review to increase the maximum width of the oriel/bay window feature that projects into n. Kerby avenue from 12 to 119 (bds code guide for window projections into public right-of-way - ossc/32/#1). Approval of an impact mitigation plan compliance review for the surgery/icu ex Date: January 28, 2016Permit type: Land use review | Permit status: Completed | Completion date: September 4, 2015 | Permit id: 2015-230625-000 | |||||
Approval of design review for the construction of the new surgery icu expansion project at legacy emanuel medical center. Approval of a modification through design review to increase the maximum height of the surgery icu expansion building from 75 to 80 (33. 120. 215. B. 3). Approval of a modification through design review to reduce the minimum street setback along n. Kerby from 40 to 0 for the surgery icu expansion. Approval of a modification through design review to reduce the minimum window requirement for the side walls of the oriel bay window feature that projects into n. Kerby avenue from 10% to 0% (bds code guide for window projections into public right-of-way - ossc 32 #1). Approval of a modification through design review to increase the maximum width of the oriel bay window feature that projects into n. Kerby avenue from 12 to 119 (bds code guide for window projections into public right-of-way - ossc 32 #1). Approval of an impact mitigation plan compliance review for the surgery icu ex Date: January 28, 2016Permit type: Land use review | Permit status: Completed | Completion date: September 4, 2015 | Permit id: 2015-230625-000 | |||||
Re-roof kerby gar.:w seismic upgrade; locate all hvac units per engineers appd locations. Includes plans for 01-146080-mt. Sep. Permit reqd for curtain boards by jan 1, 2003. Date: July 20, 2001Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Under inspection | Current use: Business | Permit id: 2001-134839-000 | |||||
Interior only to create new office space in existing storage space on the 2nd floor. Add door in 1st floor hallway. Date: April 11, 2003Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: July 25, 2003 | Current use: Business | Permit id: 2003-115214-000 | |||||
Partition wall around welding area Date: April 12, 2004Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: December 1, 2004 | Current use: Hazardous | Permit id: 2004-006200-000 | |||||
Convert storage area to ada bathroom - partially fill windows; combine 2 existing bathrooms for new ada bathroom; add janitors closet and sink Date: March 29, 2004Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: December 7, 2004 | Current use: Factory/industrial | Permit id: 2004-007183-000 | |||||
Ada upgrades to bathrooms, training room door hardware Date: June 21, 2006Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: November 24, 2006 | Current use: Factory/industrial | Permit id: 2006-139976-000 | |||||
Retaining wall with strctural slab enclosure at corner of borthwick and stanton. Date: November 26, 2007Client: Northeast Coalition Of Neighbors | Permit type: Addition | Permit status: Final | Completion date: March 10, 2008 | Current use: Factory/industrial | Permit id: 2007-173682-000 | |||||
Removal and replacement of 3 fuel (diesel and gasoline) tanks with 2 sf canopy over above ground tank. Separate tank permit through fmo required. Date: September 1, 2010Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: January 21, 2011 | Current use: Hazardous | Permit id: 2010-120241-000 | |||||
New 2,304 sf canopy to replace existing 2 sf canopy Date: November 2, 2010Client: Northeast Coalition Of Neighbors | Permit type: New construction | Permit status: Final | Completion date: January 21, 2011 | Current use: Hazardous | Permit id: 2010-184360-000 |