ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Complaint received: people living in 2 rvs in driveway. Water hoses leading to the street. Permit type: Request | Permit status: Closed | Completion date: October 21, 2014 | Permit id: 2014-130028-000 | |||||
2 amp electrical service and add circuits Date: September 10, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: September 25, 2014 | Permit id: 2014-210929-000 | |||||
Final plat to create 2 lots. Permit type: Land use review | Permit status: Completed | Completion date: June 23, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: Process management | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: Auditor | Permit status: No concerns | Completion date: June 24, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: Addressing | Permit status: Not reqd | Completion date: June 25, 2015 | Permit id: 2014-212893-000 | |||||
Approval of a preliminary plan for a 2-parcel partition, that will result in one standard lot and one flag lot as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the proposed general location of future building footprints and stormwater facilities for each of the vacant lots. The fire access lane with a turning radius of 28 feet inside, 48 feet outside, if required. Any other information specifically noted in the conditions listed below. B. The final Date: May 8, 2015Permit type: Land use review | Permit status: Completed | Completion date: September 18, 2014 | Permit id: 2014-212893-000 | |||||
Sani only (new parcel 1 - disc/reconnect): 4 lf of 8 pvc pub sani sewer main, (approx d=9), in se 129th ave. Contr shall build new branch per std p-262 and tap 8 sewer within new 63 l/f of frontage, cap existing line on prop within new parcel 2 (flag lot with 12 l/f of frontage beginning at ne property corner). Contr to verify all depths and locations in field. Contact x37869 Date: September 28, 2015Permit type: Intake | Permit status: Closed | Completion date: September 28, 2015 | Permit id: 2015-243010-000 | |||||
Construction to disconnect existing (t15) from se 129th and cap on property within new parcel2, flag lot 45 ft of sanitary sewer on property and sewer cap Date: September 28, 2015Permit type: Intake | Permit status: Closed | Completion date: September 28, 2015 | Permit id: 2015-243032-000 | |||||
Abenden old sewer pipe under house[crawl space],re-route new 3abs main line to front of the house and tie it into existing abs pipe outside also hook up existing kitchen sink,lavatory,bath tub and washing machine to same 3pipe in crawl space Date: November 2, 2015Permit type: Plumbing inspections | Permit status: Approved | Completion date: November 3, 2015 | Permit id: 2015-259570-000 | |||||
Final plat to create 2 lots. Permit type: Land use review | Permit status: Completed | Completion date: June 23, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: Process management | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: Process management | Permit status: Routed | Completion date: August 10, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: Auditor | Permit status: No concerns | Completion date: June 24, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: Addressing | Permit status: Not reqd | Completion date: June 25, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: Transportation | Permit status: Satisfied | Completion date: August 26, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: City attorney | Permit status: Completed | Completion date: July 28, 2015 | Permit id: 2014-212893-000 | |||||
Decommission cesspool Date: July 7, 2015Permit type: Application | Permit status: Approved | Completion date: July 7, 2015 | Permit id: 2015-197133-000 | |||||
Sani only (new parcel 1 - disc reconnect): 4 lf of 8 pvc pub sani sewer main, (approx d=9), in se 129th ave. Contr shall build new branch per std p-262 and tap 8 sewer within new 63 l f of frontage, cap existing line on prop within new parcel 2 (flag lot with 12 l f of frontage beginning at ne property corner). Contr to verify all depths and locations in field. Contact x37869 Date: September 28, 2015Permit type: Intake | Permit status: Closed | Completion date: September 28, 2015 | Permit id: 2015-243010-000 | |||||
Final plat to create 2 lots. Permit type: Land use review | Permit status: Completed | Completion date: June 23, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: Process management | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: Process management | Permit status: Routed | Completion date: August 10, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: Auditor | Permit status: No concerns | Completion date: June 24, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: Addressing | Permit status: Not reqd | Completion date: June 25, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: Transportation | Permit status: Satisfied | Completion date: August 26, 2015 | Permit id: 2014-212893-000 | |||||
Final plat to create 2 lots. Permit type: City attorney | Permit status: Completed | Completion date: July 28, 2015 | Permit id: 2014-212893-000 |