ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: October 7, 2013Permit type: Delead | Permit id: Ee07811 | |||||
As per the requirement contract with hpd. Apartment: 31 supply and install the missing or repair/replace the defective window guard(s) throughou Date: April 11, 2014Permit type: Gc | Permit id: Ee18726 | |||||
As per the requirement contract with hpd. Apartment: 31 supply and install the missing or repair replace the defective window guard(s) throughou Date: April 11, 2014Permit type: Gc | Permit id: Ee18726 | |||||
As per rc #20020007861 (emsl), perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 method Date: October 16, 2002Permit type: Delead | Permit id: E306894 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: August 26, 2008Permit type: Delead | Permit id: E906602 | |||||
Aka 285 st. Nicholas ave. Apartment #61, rm en1 ceiling: disconnect ceiling light fixture and properly demo and replace the entire ceiling with si Date: April 7, 2015Permit type: Gc | Permit id: Ef18391 | |||||
As per the requirement contract with hpd apartment # 36 supply and install the missing or repair/replace the defective window guards throughout Date: February 5, 2014Permit type: Gc | Permit id: Ee14739 | |||||
As per the requirement contract with hpd apartment # 36 supply and install the missing or repair replace the defective window guards throughout Date: February 5, 2014Permit type: Gc | Permit id: Ee14739 | |||||
As per the requirement contract with hpd apartment # 22 supply and install the missing or repair/replace the defective window guards throughout Date: January 27, 2014Permit type: Gc | Permit id: Ee13463 | |||||
Perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: January 27, 2014Permit type: Delead | Permit id: Ee14915 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: January 17, 2014Permit type: Delead | Permit id: Ee14170 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: November 16, 2016Permit type: Delead | Permit id: Eh06113 | |||||
As per the requirement contract with hpd apartment # 22 supply and install the missing or repair replace the defective window guards throughout Date: April 2, 2014Permit type: Gc | Permit id: Ee20033 | |||||
Perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw8463050b-7000b method utilizing flame atomic absorpt Date: December 8, 2016Permit type: Delead | Permit id: Eh07376 | |||||
Erp doh lead abatement violation:as per rc # 2008000032101and attached scope of work thoroughly remove all lead violations as per new york city health Date: February 16, 2010Permit type: Delead | Permit id: Ea25548 | |||||
As per the requirement contract with hpd apartment # 34 supply and install the missing or repair/replace the defective window guards throughout Date: October 8, 2014Permit type: Gc | Permit id: Ef07893 | |||||
Perform total lead analysis of 06 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: March 12, 2010Permit type: Delead | Permit id: Ea28577 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: August 19, 2013Permit type: Delead | Permit id: Ee04614 | |||||
Apt 34: bathroom properly repair the defective plastered surfaces approximately sq ft in ceiling and 3 sq ft wall at bath tub side respectively in Date: September 12, 2013Permit type: Gc | Permit id: Ee06018 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: March 3, 2010Permit type: Delead | Permit id: Ea27792 | |||||
As per the requirement contract with hpd apartment # 34 supply and install the missing or repair replace the defective window guards throughout Date: October 8, 2014Permit type: Gc | Permit id: Ef07893 | |||||
At vestibule stairs - 1st story -, replace with new the missing iron hand rail approximate 5. L. F. At north wall. Prime-anti-rust- (1) coat. Paint Date: June 18, 2014Permit type: Gc | Permit id: Ee24934 | |||||
(public hall) trace and repair concealed leak from above at public hall ceiling. Repair ceiling approx 8 sq. Ft. Sheetrock,tape, compound,prime and p Date: September 22, 2005Permit type: Gc | Permit id: E608503 | |||||
As per the requirement contract with hpd. Public hall: repair total (22) existing window guards in public hallway as follows: 1st floor (2), Date: October 4, 2013Permit type: Gc | Permit id: Ee06179 | |||||
(local law# 1 - clean only). Thoroughly re-clean the following areas as per new york city administrative code 27-2506. 11 and as noted in the scope of Date: January 28, 2016 Value: $203Permit type: Delead | Permit id: Eg11693 | |||||
Apt# 26. Livingroom: replace (1) window guard remove all work related debris. Nons. W. P. Date: March 22, 2010 Value: $39Permit type: Gc | Permit id: Ea29964 | |||||
(public hall) at 1st floor: reinstall (3) exisitng window guard and window stops. Date: July 31, 2008 Value: $232Permit type: Gc | Permit id: E904772 | |||||
(doh) clean up and dust wipe the following areas: interior room #1. Apartment hallway from entrance. Center door opening including casing, jamb and Date: September 25, 2002 Value: $349Permit type: Delead | Permit id: E305982 | |||||
At p/a 2nd. Intermediate floor install stops southside between 2nd. & 3rd. Floor. Date: September 12, 2002 Value: $48Permit type: Gc | Permit id: E305241 | |||||
SCORE 100 Date: December 28, 2009 Contractor: Chang HahnClient: Alan Bush | Client Address: 788 Riverside Drive New York Ny 10031 | Client Phone: (212) 795-1555 | Client Company: Harrjoy Realty Inc | Permit status: Initial | Permit id: 120164909 | |||||
At apt# 22 - repair 1 window guard with stops and one way screws in the bathroom and leave inpropper working order. Note: (intercom 011) t Date: November 2, 2016Permit type: Gc | Permit id: Eh06114 | |||||
At p a 2nd. Intermediate floor install stops southside between 2nd. & 3rd. Floor. Date: September 12, 2002 Value: $48Permit type: Gc | Permit id: E305241 | |||||
At apt# 22 - repair 1 window guard with stops and one way screws in the bathroom and leave inpropper working order. Note: (intercom 011) t Date: November 2, 2016 Value: $76Permit type: Gc | Permit id: Eh06114 | |||||
@6th floor public hallway. Remove gate and panic bar from fence obstructing egress to stairs leading to bulkhead roof area. Remove all related debri Date: January 9, 2017Permit type: Gc | Permit id: Eh09439 | |||||
As per the requirement contract with hpd. Apartment #46: repair total (2) existing window guards complete as follows: kitchen (1), living room ( Date: October 4, 2013Permit type: Gc | Permit id: Ee06180 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: October 31, 2013Permit type: Delead | Permit id: Ee09352 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: January 13, 2016Permit type: Delead | Permit id: Eg10603 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: February 9, 2016Permit type: Delead | Permit id: Eg12482 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: February 13, 2014Permit type: Delead | Permit id: Ee16935 |