New home on vacant lot Date: May 29, 2015 Value: $200,000Permit type: Building residential permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 704534 | |||||
Electrical permit Date: October 23, 2015Permit status: Issued | Current use: Single family dwelling | Permit id: 733527 | |||||
New unit Date: November 23, 2015Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 737131 | |||||
Construct mc-300. 01 type driveway in accordance with montgomery county standards and specifications. A full width 2 mill and overlay is required over the excavation area of multiple utility house connections per the current county specifications for utility construction permit and as directed by the dps row inspector. The house connections require the utility companies permits. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector.(maryland dnr permit is required prior to remove/impact street trees. Complete tree protection Date: May 26, 2015Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 331988 | |||||
Install new gas servicein accordance with washington gas plan no. 639921. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: February 10, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 350672 | |||||
Replacing (1) pole, install overhead transformer. Bore across roadway making 1 by 1 road cut to check for other utilities and associated equiptment. In accordance with pepco plan no. 3491712. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: December 15, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 350658 |