ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Construct temporary stabilized construction entrance. Proper precautions must be taken to keep the roadways free of mud, debris or other obstructions. Prior to release of this permit, the temporary entrance will be removed and complete repair shall be made of any and all damages done to the existing improvements in the public right of way. Construct storm drains in accordance with montgomery county standards and specifications and approved plans (structures no. 10, 11, 12, 13, 14, 21, 31 and connecting pipe and appurtenances). Prior to placement of any curb & gutter or pavement all utility crossings must be certified as being in place. Construct concrete sidewalk, concrete curb and gutter, handicap ramps, driveway aprons, and street paving as per approved montgomery county standards and specifications and approved plans. All unpaved area within the dedicated right-of-way plus the side slopes will be sodded. All lane closure and traffic controls shall comply with the approved traffic co Date: February 25, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public right-of-way | Permit id: 346991 |