F21/pr# p80660. 01/rms 4501-45 renovations (patient lifts under separate permit #07-183160-fa) see comment section for updated valuations per andrew mckelvey, zgf 7/26/07. 10/01/07 davis delivering plans and card. Date: August 16, 2007Permit type: Intake | Permit status: Closed | Completion date: July 25, 2007 | Permit id: 2007-149840-000 | |||||
Access - level 3 randall pediatric procedure suites remodel including 2 large endoscopy procedure rooms and 6 pre/post recover rooms, housekeeping rooms, caregiver & patient support areas and staff support Date: November 19, 2014Permit type: Intake | Permit status: Closed | Completion date: November 19, 2014 | Permit id: 2014-240003-000 | |||||
Install access control and video surveillance at 3rd floor peds procedure suitepdx-12686 Date: November 24, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: December 2, 2014 | Permit id: 2014-241477-000 | |||||
Street tree removal /replant permit Date: March 9, 2015Permit type: D - permit request | Permit status: Issued | Completion date: March 9, 2015 | Permit id: 2014-244046-000 | |||||
Xray assembly - west wing, interior remodel cardiac or, remove, replace walls, doors, biplane, equipment, ceiling, elec, finishes, etc Date: December 18, 2014Permit type: Intake | Permit status: Closed | Completion date: December 18, 2014 | Permit id: 2014-250994-000 | |||||
Access - west wing, interior remodel cardiac or, remove, replace walls, doors, biplane, equipment, ceiling, elec, finishes, etc Date: December 23, 2014Permit type: Intake | Permit status: Closed | Completion date: December 23, 2014 | Permit id: 2014-253254-000 | |||||
B1/ leh ww or humidifier refurbish project; replace 14 existing duct mounted humidification assemblies and assoc. Prv Date: January 8, 2015Permit type: Reviews | Permit status: Approved | Completion date: January 8, 2015 | Permit id: 2015-102656-000 | |||||
Power - leh ww or humidifier refurbish project; replace 14 existing duct mounted humidification assemblies and assoc. Prv Date: March 2, 2015Permit type: Intake | Permit status: Closed | Completion date: January 13, 2015 | Permit id: 2015-104281-000 | |||||
Video - west wing, interior remodel cardiac or, remove, replace walls, doors, biplane, equipment, ceiling, elec, finishes, etc Date: January 22, 2015Permit type: Intake | Permit status: Closed | Completion date: January 15, 2015 | Permit id: 2015-105786-000 | |||||
Install access control at orthopedics location Date: February 17, 2015Permit type: Intake | Permit status: Closed | Completion date: February 17, 2015 | Permit id: 2015-120604-000 | |||||
Run control wire to the roof top units and mechanical room Date: April 17, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: May 22, 2015 | Permit id: 2015-151369-000 | |||||
F11/ lower level lorenzen conference room toilet room remodel Date: May 13, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 13, 2015 | Permit id: 2015-170133-000 | |||||
B1/ lower level lorenzen conference room toilet room remodel Date: May 20, 2015Permit type: Intake | Permit status: Closed | Completion date: May 13, 2015 | Permit id: 2015-170140-000 | |||||
Power - lower level lorenzen conference room toilet room remodel Date: May 15, 2015Permit type: Intake | Permit status: Closed | Completion date: May 15, 2015 | Permit id: 2015-171183-000 | |||||
Plumbing renovation at legacy emanual medical center lorenzen confrence roomr/r 4 wc, 4 lav, 2 urinals Date: May 19, 2015Permit type: Intake | Permit status: Closed | Completion date: May 19, 2015 | Permit id: 2015-172993-000 | |||||
Lorenzen center- lower level- alteration to the fire alarm system as needed for t. I.- 4 devices total 2- smoke detectors2- strobes Date: May 29, 2015Permit type: Intake | Permit status: Closed | Completion date: May 29, 2015 | Permit id: 2015-177624-000 | |||||
Lower level- conf. Ctr- sprinkler - replace (5) existing sprinklers with quick responae heads and adjust location for new ceiling layout Date: June 4, 2015Permit type: Intake | Permit status: Closed | Completion date: June 3, 2015 | Permit id: 2015-179786-000 | |||||
Plumbing renovation at legacy emanual hospitalwest wing domestic water booster pump Date: June 5, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 5, 2015 | Permit id: 2015-180963-000 | |||||
Plumbing renovation at leh booster pump Date: June 5, 2015Permit type: Intake | Permit status: Closed | Completion date: June 5, 2015 | Permit id: 2015-180964-000 | |||||
B1/ unit 54 restroom reconfiguration from 1 restroom to 1 public restroom and 1 medical staff restroom Date: June 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 18, 2015 | Permit id: 2015-188315-000 | |||||
B1/ unit 54 restroom reconfiguration - revise location of shower Permit type: Intake | Permit status: Closed | Completion date: July 1, 2015 | Permit id: 2015-188317-Rev | |||||
5th floor- sprinkler - rework (3) pendents & plug (1) for ti Date: July 1, 2015Permit type: Intake | Permit status: Closed | Completion date: June 24, 2015 | Permit id: 2015-191484-000 | |||||
Power - unit 54 restroom reconfiguration from 1 restroom to 1 public restroom and 1 medical staff restroom Date: June 25, 2015Permit type: Intake | Permit status: Closed | Completion date: June 25, 2015 | Permit id: 2015-192251-000 | |||||
175 sq ft illuminated sign mounted on raceway Permit type: Intake | Permit status: Closed | Completion date: June 26, 2015 | Permit id: 2015-192764-000 | |||||
175 sq ft illuminated sign mounted on raceway Permit type: Trade permits | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-192764-000 | |||||
175 sq ft illuminated sign mounted on raceway Permit type: Trade permits | Permit status: Approved | Completion date: June 26, 2015 | Permit id: 2015-192764-000 | |||||
175 sq ft illuminated sign mounted on raceway Permit type: Planning and zoning | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-192764-000 | |||||
Sign lighting Date: June 30, 2015Permit type: Intake | Permit status: Closed | Completion date: June 26, 2015 | Permit id: 2015-192790-000 | |||||
Plumbing renovartion at legacy emanual hospitalunit 54 toilet room improvment2 wc, 3 lav, 1 show, 1 mop, 1 eew Date: June 29, 2015Permit type: Intake | Permit status: Closed | Completion date: June 29, 2015 | Permit id: 2015-193630-000 | |||||
B1/ unit 54 - hvac for ti Permit type: Intake | Permit status: Closed | Completion date: June 30, 2015 | Permit id: 2015-194453-000 | |||||
Ew-access -:ct unit 2970539:emanual hos:emanuelpr#pdx-9325 Date: July 12, 2010Permit type: Intake | Permit status: Closed | Completion date: July 12, 2010 | Permit id: 2010-155383-000 | |||||
Sent to p&d for scanning 8/20/2013standing/pr#80823. 01/infrastructure upgrade ) phase i, replacement of ahu & connections to hot/chilled water from north utility plant Date: November 9, 2010Permit type: Intake | Permit status: Closed | Completion date: September 24, 2010 | Permit id: 2010-179334-000 | |||||
B1/pr#80823. 01/dfs - occupant safety plan Date: March 24, 2011Permit type: Intake | Permit status: Closed | Completion date: March 7, 2011 | Permit id: 2010-179334-Dfs | |||||
B2/pr#80823. 01/infrastructure upgrade ) dfs-02 for passive life safety through-peneration firestop system Date: April 13, 2011Permit type: Intake | Permit status: Closed | Completion date: March 31, 2011 | Permit id: 2010-179334-Dfs | |||||
B2/pr#80823. 01/infrastructure upgrade ) phase i, dfs for pipe riser supports Date: May 4, 2011Permit type: Intake | Permit status: Closed | Completion date: April 27, 2011 | Permit id: 2010-179334-Dfs | |||||
F9/pr#80823. 01/infrastructure upgrade ) phase i, dfs for seismic duct support Date: May 4, 2011Permit type: Intake | Permit status: Closed | Completion date: April 27, 2011 | Permit id: 2010-179334-Dfs | |||||
F9/pr#80823. 01/infrastructure upgrade ) phase i, dfs-05 equipment anchorage & horizontal piping Date: June 16, 2011Permit type: Intake | Permit status: Closed | Completion date: June 3, 2011 | Permit id: 2010-179334-Dfs | |||||
B1/pr#80823. 01/infrastructure upgrade ) phase i, replacement of ahu & connections to hot/chilled water from north utility plant dfs-06 for steel stairs Date: December 5, 2011Permit type: Intake | Permit status: Closed | Completion date: November 30, 2011 | Permit id: 2010-179334-Dfs | |||||
F9/infrastructure upgrade ) phase i, replacement of ahu & connections to hot/chilled water from north utility plant - dfs-07 metal panel winid load calculations Date: January 3, 2012Permit type: Intake | Permit status: Closed | Completion date: December 22, 2011 | Permit id: 2010-179334-Dfs | |||||
F6/ revision to clarify reduction in the scope of work. A portion was completed under a later permit Date: September 4, 2014Permit type: Intake | Permit status: Closed | Completion date: August 26, 2014 | Permit id: 2010-179334-Rev | |||||
F9/pr#80823. 01/replacemen of ahu & connections to hot/chilled water from north utility plant Date: November 9, 2010Permit type: Intake | Permit status: Closed | Completion date: September 24, 2010 | Permit id: 2010-179347-000 | |||||
F9/pr#80823. 01/replacemen of ahu & connections to hot/chilled water from north utility plantrev-01 this rev is to show the work that was deleted from this scope and transfered to the adult services project, bldg # 11-204325-fa. Including providing temporary pipe connections to existing mains while new risers are under construction to minimize shutdown. Date: August 13, 2014Permit type: Intake | Permit status: Closed | Completion date: August 11, 2014 | Permit id: 2010-179347-Rev | |||||
F13 /pr# po 1500237455/ pharmacy mechanical upgrades Date: June 6, 2011Permit type: Intake | Permit status: Closed | Completion date: May 27, 2011 | Permit id: 2011-143606-000 | |||||
B1 /pr# po 1500237455/ pharmacy mechanical upgrades dfs for seismic anchorage for fan coil unit Date: August 9, 2011Permit type: Intake | Permit status: Closed | Completion date: August 2, 2011 | Permit id: 2011-143606-Dfs | |||||
B1/pr#strata #3925/west wing infrastructure upgrade - phase 2 dfs-01 for steel stairs Date: December 7, 2011Permit type: Intake | Permit status: Closed | Completion date: December 2, 2011 | Permit id: 2011-164728-Dfs | |||||
F9/dfs - electrical equipment seismic anchorage cals. Date: January 17, 2012Permit type: Intake | Permit status: Closed | Completion date: January 11, 2012 | Permit id: 2011-164728-Dfs | |||||
B2/dfs - screen wall & metal panel wind load cals Date: January 17, 2012Permit type: Intake | Permit status: Closed | Completion date: January 11, 2012 | Permit id: 2011-164728-Dfs | |||||
B1/pr#strata #3925/west wing infrastructure upgrade - phase 2 dfs 05 for ahu equipment attachment Date: March 14, 2012Permit type: Intake | Permit status: Closed | Completion date: March 8, 2012 | Permit id: 2011-164728-Dfs | |||||
B2/ this dfs-06 replaces dfs-04 for rooftop mico stand lateral support Date: April 5, 2012Permit type: Intake | Permit status: Closed | Completion date: April 3, 2012 | Permit id: 2011-164728-Dfs | |||||
F6/ revision to clarify reduction in the scope of work. A portion was completed under another project, see permit # 11-204325-fa. Date: September 4, 2014Permit type: Intake | Permit status: Closed | Completion date: August 26, 2014 | Permit id: 2011-164728-Rev | |||||
F9/pr#strata #3925/ hvac - ahu rooftop, installation (5) exhaust fans. West wing phase ii. Date: August 31, 2011Permit type: Intake | Permit status: Closed | Completion date: August 5, 2011 | Permit id: 2011-164735-000 | |||||
F9/pr#strata #3925/ hvac - ahu rooftop, installation (5) exhaust fans. West wing phase ii. Rev-01 reduce scope of this permit, work completed in the adult service project permit # 11-204325-fa Date: August 18, 2014Permit type: Intake | Permit status: Closed | Completion date: August 14, 2014 | Permit id: 2011-164735-Rev | |||||
F5/ nuclear medicine exam # 1 room 1106 replace new diagnostic scanning machine Date: May 11, 2012Permit type: Intake | Permit status: Closed | Completion date: April 25, 2012 | Permit id: 2012-134715-000 | |||||
F16/ boiler fuel system upgrade, new 33 x 13 pad with new 10,0 gal above ground fuel oil tank, vehicle barriers, and related fuel piping into the hospital. See building permit for new footing, slab, and seismic anchorage for fuel oil tank. Date: June 12, 2012Permit type: Intake | Permit status: Closed | Completion date: May 9, 2012 | Permit id: 2012-139219-000 | |||||
B1/ nuclear medicine exam # 1 room 1106 - patient lift installation Date: May 15, 2012Permit type: Intake | Permit status: Closed | Completion date: May 10, 2012 | Permit id: 2012-139584-000 | |||||
Power - boiler fuel system upgrade, new 33 x 13 pad with new 10,0 gal above ground fuel tank, vehicle barriers, and related fuel piping into the hospital. See building permit for new footing, slab, and seismic anchorage for fuel oil tank. Pr#1500251465 Date: July 5, 2012Permit type: Intake | Permit status: Closed | Completion date: May 22, 2012 | Permit id: 2012-143266-000 | |||||
F8/ relocate accoustical booth to rm#3218, third floor Date: July 31, 2012Permit type: Intake | Permit status: Closed | Completion date: July 17, 2012 | Permit id: 2012-162676-000 | |||||
Uprgade existing fa system for 100% smoke detection in basement thru 5th fl. Upgrade strobe coverage per ada requirements. - fire system upgrade. Date: October 3, 2012Permit type: Intake | Permit status: Closed | Completion date: September 25, 2012 | Permit id: 2012-186592-000 | |||||
F9/ level radio room install 1 fan coil unit Date: July 15, 2013Permit type: Intake | Permit status: Closed | Completion date: May 29, 2013 | Permit id: 2013-161121-000 | |||||
Level radio room install 1 fan coil unitpr# 1 4072 635000 Date: June 3, 2013Permit type: Intake | Permit status: Closed | Completion date: June 3, 2013 | Permit id: 2013-163071-000 | |||||
F12/ basement - remove & replace water cooled fan coil unit serving flywheel ups-mdf. Date: August 1, 2013Permit type: Intake | Permit status: Closed | Completion date: June 21, 2013 | Permit id: 2013-171092-000 | |||||
F12/ basement - this dfs-01 is for mdf ups and flywheel equipment seismic structural engineering anchorage. Date: August 6, 2014Permit type: Intake | Permit status: Closed | Completion date: September 26, 2013 | Permit id: 2013-171092-Dfs | |||||
Sprinkler - install 2 pendent sprinklers in new readio room on level 107/17/13: received i letter of transmittal, i application, 1 set of cut sheets, 3 sets of plans Date: July 18, 2013Permit type: Intake | Permit status: Closed | Completion date: July 17, 2013 | Permit id: 2013-181038-000 | |||||
Renovate existing roof terrace, add new deck, planters and trellis Date: September 25, 2013Permit type: Application | Permit status: Approved | Completion date: August 1, 2013 | Permit id: 2013-187482-000 | |||||
Basement - remove & replace water cooled fan coil unit, voice/data mdf - ups lower levelpr# 15040726350 (12/13/13 - see comments) Date: August 6, 2013Permit type: Intake | Permit status: Closed | Completion date: August 6, 2013 | Permit id: 2013-188998-000 | |||||
Uprgade existing fa system for 100% smoke detection in basement thru 5th fl. Upgrade strobe coverage per ada requirements. - fire system upgrade. Pr#912150407235 Date: September 13, 2013Permit type: Intake | Permit status: Closed | Completion date: September 12, 2013 | Permit id: 2013-204100-000 | |||||
B2/ 1st floor, room1312b; install new angio diagnostic unit in cath lab #1. Per attached email from contractor on 8/8/14 that this is a replacement of identical equipment and was hung on the same equipment carriage. D rock Date: January 2, 2014Permit type: Intake | Permit status: Closed | Completion date: December 9, 2013 | Permit id: 2013-235852-000 | |||||
B1/ basement level - east chilled water loop upgrade. Note: received message from nolan w/ total mechanical 971-409-7796 that as of 8/8/14 this project is on-going and plumbing child permit is not ready for final inspection yet. D. Rock Date: February 10, 2014Permit type: Intake | Permit status: Closed | Completion date: February 10, 2014 | Permit id: 2014-114824-000 | |||||
Plumbing renovation at legacy emanual hospital boiler room. Note: received message from nolan w/ total mechanical 971-409-7796 that as of 8/8/14 this project is on-going and not ready for final inspection yet. D. Rock Date: February 10, 2014Permit type: Intake | Permit status: Closed | Completion date: February 10, 2014 | Permit id: 2014-114846-000 | |||||
F13/ n tower; removal and replacement of existing ahu units in penthouse, dfs-01 for mechanical seismic equipment anchorage Date: September 10, 2014Permit type: Intake | Permit status: Closed | Completion date: August 19, 2014 | Permit id: 2014-119683-Dfs | |||||
B1/ n tower; removal and replacement of existing ahu units in penthouse - dfs-02 for mechanical piping Permit type: Intake | Permit status: Closed | Completion date: November 14, 2014 | Permit id: 2014-119683-Dfs | |||||
F13/ replace existing ahu units with new, ducting, etc Date: March 18, 2014Permit type: Intake | Permit status: Closed | Completion date: February 21, 2014 | Permit id: 2014-119688-000 | |||||
Plumbing renovation at legacy emanual north patient tower 5th floor and penthouse med gas oulets, reroute pipe Date: March 11, 2014Permit type: Intake | Permit status: Closed | Completion date: March 11, 2014 | Permit id: 2014-125875-000 | |||||
Electrical for ahu replacement /added 1 amp feeder and 1 circuit, see 14-1295 rev 01 et 6/16/14 / Date: May 13, 2014Permit type: Intake | Permit status: Closed | Completion date: March 21, 2014 | Permit id: 2014-129590-000 | |||||
F13/ mammography department reconfigure and remodel existing space Date: June 4, 2014Permit type: Intake | Permit status: Closed | Completion date: May 12, 2014 | Permit id: 2014-155302-000 | |||||
F11/ level 3 randall pediatric procedure suites remodel including 2 large endoscopy procedure rooms and 6 pre/post recover rooms, housekeeping rooms, caregiver & patient support areas and staff support Date: June 16, 2014Permit type: Intake | Permit status: Closed | Completion date: May 13, 2014 | Permit id: 2014-156268-000 | |||||
B1/ level 3 randall pediatric procedure - dfs-01 for suspended act ceiling system Date: February 5, 2015Permit type: Intake | Permit status: Closed | Completion date: January 30, 2015 | Permit id: 2014-156268-Dfs | |||||
Plumbing renovation at legacy emanual hospital mammography dept. R/r 2 sinks Date: May 14, 2014Permit type: Intake | Permit status: Closed | Completion date: May 14, 2014 | Permit id: 2014-156575-000 | |||||
B1/ mammography department - revise ductwork, remove 3 tus and add 2 new tus Date: May 27, 2014Permit type: Intake | Permit status: Closed | Completion date: May 14, 2014 | Permit id: 2014-156753-000 | |||||
Power, voice/data - mammography department reconfigure and remodel existing space Date: May 14, 2014Permit type: Intake | Permit status: Closed | Completion date: May 14, 2014 | Permit id: 2014-156758-000 | |||||
F11/ level 3 randall pediatric procedure suites remodel - reconfigure air supply systems and med-gas Date: June 16, 2014Permit type: Intake | Permit status: Closed | Completion date: May 15, 2014 | Permit id: 2014-157218-000 | |||||
F2/ west wing, interior remodel cardiac or, remove, replace walls, doors, biplane, equipment, ceiling, elec, finishes, etc Date: June 24, 2014Permit type: Intake | Permit status: Closed | Completion date: May 27, 2014 | Permit id: 2014-161450-000 | |||||
F2/ hvac work for new remodel, roof penetrations, etc Date: June 24, 2014Permit type: Intake | Permit status: Closed | Completion date: May 27, 2014 | Permit id: 2014-161453-000 | |||||
B2/ dfs for hvac seismic design Date: October 14, 2014Permit type: Intake | Permit status: Closed | Completion date: October 10, 2014 | Permit id: 2014-161453-Dfs | |||||
Design commission modifies the administrative decision of denial, thereby granting the appeal but with a new condition of approval, as follows:approval of an adjustment to increase the maximum size of a new south-facing parapet sign on the randall childrens tower to more than square feet, per the revised exhibits c. 1 through c. 3, all signed and dated january 22, 2015, and subject to the following condition of approval:a. The proposed south-facing parapet sign shall be reduced in size to no more than 175 square feet, but otherwise maintain the same general design and placement on the building as proposed. Date: February 5, 2015Permit type: Land use review | Permit status: Completed | Completion date: June 6, 2014 | Permit id: 2014-165242-000 | |||||
Festival Date: June 20, 2014Permit type: Intake | Permit status: Complete | Completion date: June 6, 2014 | Permit id: 2014-166480-000 | |||||
Plumbing renovation at leh randall childrens hospital 3rd floor Date: July 25, 2014Permit type: Intake | Permit status: Closed | Completion date: June 6, 2014 | Permit id: 2014-166492-000 | |||||
Power, fire alarm, voice/data, paging - west wing, interior remodel cardiac or, remove, replace walls, doors, biplane, equipment, ceiling, elec, finishes, etc Date: July 28, 2014Permit type: Intake | Permit status: Closed | Completion date: June 7, 2014 | Permit id: 2014-166648-000 | |||||
Power, fire alarm, voice/data, nurse, med gas - level 3 randall pediatric procedure suites remodel including 2 large endoscopy procedure rooms and 6 pre/post recover rooms, housekeeping rooms, caregiver & patient support areas and staff support Date: July 28, 2014Permit type: Intake | Permit status: Closed | Completion date: June 7, 2014 | Permit id: 2014-166649-000 | |||||
Plumbing renovation at leh west wing hybridscrub sink alcove and med gas Date: October 1, 2014Permit type: Intake | Permit status: Closed | Completion date: June 11, 2014 | Permit id: 2014-168349-000 | |||||
Fire alarm upgrades- 34 devices total- 26 smoke detectors, 4 strobes, 4 h/s. Date: July 1, 2014Permit type: Intake | Permit status: Closed | Completion date: July 1, 2014 | Permit id: 2014-177964-000 | |||||
Sprinklers-on 3rd floor add (42) ssp in buildout space and relocate (25) existing ssp and plug (7) existing sprinklers Date: July 25, 2014Permit type: Intake | Permit status: Closed | Completion date: July 24, 2014 | Permit id: 2014-188890-000 | |||||
1st floor- mammography- alterations to the fire alarm system as needed for t. I.- 5 devices total 3- smoke detectors2- strobes1- chime/strobe Date: August 25, 2014Permit type: Intake | Permit status: Closed | Completion date: August 25, 2014 | Permit id: 2014-203713-000 | |||||
F1/ level 10; walls, ceiling, doors, for radio room Date: September 4, 2014Permit type: Intake | Permit status: Closed | Completion date: September 2, 2014 | Permit id: 2014-206966-000 | |||||
Plumbing renovation at leh radio roomrelocate hb Date: September 4, 2014Permit type: Intake | Permit status: Closed | Completion date: September 4, 2014 | Permit id: 2014-208083-000 | |||||
Suite #1600- alterations to fire sprinklers as needed for t. I.- 19 heads total Date: September 16, 2014Permit type: Intake | Permit status: Closed | Completion date: September 16, 2014 | Permit id: 2014-213542-000 | |||||
Suite #1600- alterations to the fire alarm system as needed for t. I.- 4 devices total Date: September 19, 2014Permit type: Intake | Permit status: Closed | Completion date: September 19, 2014 | Permit id: 2014-215473-000 | |||||
Randall-3rd floor- pediatric procedure suite- alterations to the fire alarm system as needed for t. I-24- smoke detectors8- strobes7- s/s2- pull stations Date: September 24, 2014Permit type: Intake | Permit status: Closed | Completion date: September 24, 2014 | Permit id: 2014-216939-000 | |||||
Unit #5400- alteration to the fire sprinklers as needed for t. I.- 1- strobe total Date: July 27, 2015Permit type: Intake | Permit status: Closed | Completion date: July 27, 2015 | Permit id: 2015-207441-000 | |||||
Install access control on (2) exterior doors in the central hospital imaging unit. Pdx-13070 Date: July 29, 2015Permit type: Intake | Permit status: Closed | Completion date: July 29, 2015 | Permit id: 2015-209010-000 | |||||
Power - west wing domestic water booster pump Date: July 31, 2015Permit type: Intake | Permit status: Closed | Completion date: July 31, 2015 | Permit id: 2015-210075-000 | |||||
Private property tree removal permit Date: October 6, 2015Permit type: A - research | Permit status: Title 11 permit with cond | Completion date: September 24, 2015 | Permit id: 2015-241181-000 | |||||
B2/ install 37 patient lifts in nursing units, multiple floors, locations Date: December 1, 2015Permit type: Reviews | Permit status: Approved | Completion date: December 1, 2015 | Permit id: 2015-271132-000 | |||||
Power - install 37 patient lifts in nursing units, multiple floors, locations Date: December 1, 2015Permit type: Intake | Permit status: Closed | Completion date: December 1, 2015 | Permit id: 2015-271450-000 | |||||
Requested consultations Date: December 14, 2015Permit type: Fire bureau | Permit status: Closed | Completion date: December 14, 2015 | Permit id: 2015-274520-000 | |||||
Project for fire sprinkler install in unsprinkled area in mech rms on 4th and 5th floor and under helipad Date: December 22, 2015Permit type: Reviews | Permit status: Approved | Completion date: December 22, 2015 | Permit id: 2015-280596-000 | |||||
Mech rm 4th & 5th floors and under helipad- add 12 heads total Date: December 22, 2015Permit type: Intake | Permit status: Closed | Completion date: December 22, 2015 | Permit id: 2015-280601-000 | |||||
F10/ first floor - patient care unit 15 - remove andreconfigure partition walls to create offices and work areas, new patient lifts and fixtures in patient rooms, electrical, lighting, ceiling, fixtures and finishes Date: February 2, 2016Permit type: Reviews | Permit status: Approved | Completion date: February 2, 2016 | Permit id: 2016-115437-000 | |||||
F10/ first floor - patient care unit 15 - remove and reconfigure partition walls to create offices and work areas, new patient lifts and fixtures in patient rooms, electrical, lighting, ceiling, fixtures and finishes. Date: April 5, 2016Permit type: Intake | Permit status: Closed | Completion date: February 2, 2016 | Permit id: 2016-115446-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Application | Permit status: Approved | Completion date: February 11, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Issuance/intake | Permit status: Intake | Completion date: February 11, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Process management | Permit status: Closed | Completion date: April 6, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Process management | Permit status: Closed | Completion date: March 22, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Process management | Permit status: Closed | Completion date: April 13, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Addressing | Permit status: Not reqd | Completion date: March 10, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Planning and zoning | Permit status: Approved | Completion date: March 29, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Erosion control | Permit status: Approved | Completion date: March 17, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Site development | Permit status: Approved | Completion date: March 17, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Life safety | Permit status: Approved | Completion date: April 22, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Life safety | Permit status: Not reqd | Completion date: March 28, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Life safety | Permit status: Not reqd | Completion date: February 18, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Structural | Permit status: Approved | Completion date: April 12, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Structural | Permit status: Required | Completion date: April 12, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Commercial plumbing | Permit status: Approved | Completion date: March 30, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Fire bureau | Permit status: Approved | Completion date: April 15, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Environmental services | Permit status: Not reqd | Completion date: February 11, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Environmental services | Permit status: Approved | Completion date: February 11, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Transportation | Permit status: Not reqd | Completion date: February 11, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Water bureau review | Permit status: Not reqd | Completion date: February 16, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Water bureau review | Permit status: Approved | Completion date: April 6, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Parks bureau | Permit status: Approved | Completion date: February 23, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Parks bureau | Permit status: Approved | Completion date: February 12, 2016 | Permit id: 2016-119833-000 | |||||
F25/ suite 1019; replace existing ct scanner with new, new double door, new pocket door, reconfigure curtain track, cabinetry, finishes Date: February 22, 2016Permit type: Reviews | Permit status: Approved | Completion date: February 22, 2016 | Permit id: 2016-124756-000 | |||||
F25/ suite 1019; replace existing ct scanner with new, new double door, new pocket door, reconfigure curtain track, cabinetry, elec, finishes Date: March 2, 2016Permit type: Intake | Permit status: Closed | Completion date: February 22, 2016 | Permit id: 2016-124766-000 | |||||
Power - suite 1019; replace existing ct scanner with new, new double door, new pocket door, reconfigure curtain track, cabinetry, elec, finishes Date: February 23, 2016Permit type: Intake | Permit status: Closed | Completion date: February 23, 2016 | Permit id: 2016-125399-000 | |||||
Power - first floor - patient care unit 15 - remove andreconfigure partition walls to create offices and work areas, new patient lifts and fixtures in patient rooms, electrical, lighting, ceiling, fixtures and finishes Date: February 24, 2016Permit type: Intake | Permit status: Closed | Completion date: February 24, 2016 | Permit id: 2016-125759-000 | |||||
Private property tree removal permit Date: March 4, 2016Permit type: A - research | Permit status: Title 11 permit required | Completion date: March 4, 2016 | Permit id: 2016-130459-000 | |||||
New 4 amp feeder to temporary hyperbolic chamber trailer Date: April 13, 2016Permit type: Intake | Permit status: Closed | Completion date: March 8, 2016 | Permit id: 2016-132142-000 | |||||
F20/ add (26) vav terminal units, demo existing wall mounted ventilators, med gas connections Date: April 1, 2016Permit type: Intake | Permit status: Closed | Completion date: March 9, 2016 | Permit id: 2016-132733-000 | |||||
Plumbing renovation at lemc unit 15 Date: March 14, 2016Permit type: Intake | Permit status: Closed | Completion date: March 14, 2016 | Permit id: 2016-134692-000 | |||||
Voice/data, security - suite 1019; replace existing ct scanner with new, new double door, new pocket door, reconfigure curtain track, cabinetry, elec, finishes Date: March 17, 2016Permit type: Intake | Permit status: Closed | Completion date: March 17, 2016 | Permit id: 2016-136867-000 | |||||
Spect ct equipment install - suite 1019; replace existing ct scanner with new, new double door, new pocket door, reconfigure curtain track, cabinetry, elec, finishes Date: March 21, 2016Permit type: Intake | Permit status: Closed | Completion date: March 21, 2016 | Permit id: 2016-137768-000 | |||||
F5/or remodel operating rooms 11,14 and 15 - selective demo of walls, casework, ceilings and flooring, med gas piping, install equipment and interior finish upgrades to include walls, ceilings, casework, structural for equipment mounting, new med gas piping, plbg, elec Date: March 30, 2016Permit type: Reviews | Permit status: Approved | Completion date: March 30, 2016 | Permit id: 2016-142667-000 | |||||
Replace 2 sewage ejector pumps at lorenzen conference center Date: April 5, 2016Permit type: Reviews | Permit status: Approved | Completion date: April 5, 2016 | Permit id: 2016-145908-000 | |||||
Plumbing renovation at legacy emanual hospital lorenzen conference centerreplace 2 sewage ejector pumps Date: April 5, 2016Permit type: Intake | Permit status: Closed | Completion date: April 5, 2016 | Permit id: 2016-145925-000 | |||||
Unit 15- sprinkler revisions for remodel- 104 heads total Date: April 7, 2016Permit type: Intake | Permit status: Closed | Completion date: April 6, 2016 | Permit id: 2016-146407-000 | |||||
Power - or remodel operating rooms 11,14 and 15 - selective demo of walls, casework, ceilings and flooring, med gas piping, install equipment and interior finish upgrades to include walls, ceilings, casework, structural for equipment mounting, new med gas piping, plbg, elec Permit type: Intake | Permit status: Closed | Completion date: April 7, 2016 | Permit id: 2016-147683-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Application | Permit status: Approved | Completion date: April 8, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Application | Permit status: Closed | Completion date: April 8, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Issuance/intake | Permit status: Intake | Completion date: April 8, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Process management | Permit status: Closed | Completion date: April 14, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Planning and zoning | Permit status: Not reqd | Completion date: April 8, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Erosion control | Permit status: Approved | Completion date: April 20, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Site development | Permit status: Approved | Completion date: April 20, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Life safety | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: April 14, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Transportation | Permit status: Approved | Completion date: April 14, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Transportation | Permit status: Not reqd | Completion date: April 17, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Water bureau review | Permit status: Not reqd | Completion date: April 23, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Parks bureau | Permit status: Approved | Completion date: April 20, 2016 | Permit id: 2016-148717-000 | |||||
Fuel oil piping to generators associated with 16-148717-co. New system to generator. New pump to existing fos/r. Permit type: Intake | Permit status: Closed | Completion date: April 8, 2016 | Permit id: 2016-148750-000 | |||||
Fuel oil piping to generators associated with 16-148717-co. New system to generator. New pump to existing fos/r. Permit type: Mechanical review | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2016-148750-000 | |||||
Fuel oil piping to generators associated with 16-148717-co. New system to generator. New pump to existing fos/r. Permit type: Fire bureau | Permit status: Approved | Completion date: April 13, 2016 | Permit id: 2016-148750-000 | |||||
Unit 15- alterations to the fire alarm system as needed for t. I.- 49 devices total 41- smoke detectors, 1- strobe, 7- s/s Date: April 21, 2016Permit type: Intake | Permit status: Closed | Completion date: April 21, 2016 | Permit id: 2016-157136-000 | |||||
Create 1-hr rated connection to existing rated corriday, intall lighting, connect new mechanical, connect it cabling from new tunnel under childrens hospital tower (see permit 08-180618 rev 02 mg) Permit type: Application | Permit status: Closed | Completion date: January 28, 2010 | Permit id: 2009-166658-000 | |||||
Connect mechanical piping and it cable from new tunnel under childrens hospital (see permit 08-180618 rev 02 mg) Permit type: Application | Permit status: Closed | Completion date: January 28, 2010 | Permit id: 2009-166661-000 | |||||
Connect mechanical piping and it cable from new tunnel under childrens hospital (see permit 08-180618 rev 02 mg) Permit type: Application | Permit status: Approved | Completion date: October 26, 2009 | Permit id: 2009-166661-000 | |||||
Connect mechanical piping and it cable from new tunnel under childrens hospital (see permit 08-180618 rev 02 mg) Permit type: Issuance/intake | Permit status: Intake | Completion date: October 26, 2009 | Permit id: 2009-166661-000 | |||||
State epermit 59000-bel-12-00214: install access control system and cctv at adult services pdx-10459faxed Date: April 11, 2012Permit type: Administration | Permit status: Closed | Completion date: April 11, 2012 | Permit id: 2012-128825-000 | |||||
Renovation of levels 1-3 faxed Date: May 15, 2012Permit type: Intake | Permit status: Closed | Completion date: April 18, 2012 | Permit id: 2012-131022-000 | |||||
Street tree removal /replant permit Date: January 6, 2016Permit type: D - permit request | Permit status: Permit issued | Completion date: January 6, 2016 | Permit id: 2014-253390-000 | |||||
B1/ unit 54 restroom reconfiguration - revise location of shower Date: July 7, 2015Permit type: Intake | Permit status: Closed | Completion date: July 1, 2015 | Permit id: 2015-188317-Rev | |||||
175 sq ft illuminated sign mounted on raceway Date: July 22, 2015Permit type: Intake | Permit status: Closed | Completion date: June 26, 2015 | Permit id: 2015-192764-000 | |||||
B1/ unit 54 - hvac for ti Date: July 8, 2015Permit type: Intake | Permit status: Closed | Completion date: June 30, 2015 | Permit id: 2015-194453-000 | |||||
B2 install 37 patient lifts in nursing units, multiple floors, locations Date: December 1, 2015Permit type: Reviews | Permit status: Approved | Completion date: December 1, 2015 | Permit id: 2015-271132-000 | |||||
F10 first floor - patient care unit 15 - remove andreconfigure partition walls to create offices and work areas, new patient lifts and fixtures in patient rooms, electrical, lighting, ceiling, fixtures and finishes Date: February 2, 2016Permit type: Reviews | Permit status: Approved | Completion date: February 2, 2016 | Permit id: 2016-115437-000 | |||||
F10 first floor - patient care unit 15 - remove and reconfigure partition walls to create offices and work areas, new patient lifts and fixtures in patient rooms, electrical, lighting, ceiling, fixtures and finishes. Date: April 5, 2016Permit type: Intake | Permit status: Closed | Completion date: February 2, 2016 | Permit id: 2016-115446-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Application | Permit status: Approved | Completion date: February 11, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Issuance/intake | Permit status: Intake | Completion date: February 11, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Process management | Permit status: Closed | Completion date: April 6, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Process management | Permit status: Closed | Completion date: March 22, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Process management | Permit status: Closed | Completion date: April 13, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Addressing | Permit status: Not reqd | Completion date: March 10, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Planning and zoning | Permit status: Approved | Completion date: March 29, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Erosion control | Permit status: Approved | Completion date: March 17, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Site development | Permit status: Approved | Completion date: March 17, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Life safety | Permit status: Approved | Completion date: April 22, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Life safety | Permit status: Not reqd | Completion date: March 28, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Life safety | Permit status: Not reqd | Completion date: February 18, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Structural | Permit status: Approved | Completion date: April 12, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Structural | Permit status: Required | Completion date: April 12, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Commercial plumbing | Permit status: Approved | Completion date: March 30, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Fire bureau | Permit status: Approved | Completion date: April 15, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Environmental services | Permit status: Not reqd | Completion date: February 11, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Environmental services | Permit status: Approved | Completion date: February 11, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Transportation | Permit status: Not reqd | Completion date: February 11, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Water bureau review | Permit status: Not reqd | Completion date: February 16, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Water bureau review | Permit status: Approved | Completion date: April 6, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Parks bureau | Permit status: Approved | Completion date: February 23, 2016 | Permit id: 2016-119833-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Permit type: Parks bureau | Permit status: Approved | Completion date: February 12, 2016 | Permit id: 2016-119833-000 | |||||
F25 suite 1019; replace existing ct scanner with new, new double door, new pocket door, reconfigure curtain track, cabinetry, finishes Date: February 22, 2016Permit type: Reviews | Permit status: Approved | Completion date: February 22, 2016 | Permit id: 2016-124756-000 | |||||
F25 suite 1019; replace existing ct scanner with new, new double door, new pocket door, reconfigure curtain track, cabinetry, elec, finishes Date: March 2, 2016Permit type: Intake | Permit status: Closed | Completion date: February 22, 2016 | Permit id: 2016-124766-000 | |||||
F20 add (26) vav terminal units, demo existing wall mounted ventilators, med gas connections Date: April 1, 2016Permit type: Intake | Permit status: Closed | Completion date: March 9, 2016 | Permit id: 2016-132733-000 | |||||
Voice data, security - suite 1019; replace existing ct scanner with new, new double door, new pocket door, reconfigure curtain track, cabinetry, elec, finishes Date: March 17, 2016Permit type: Intake | Permit status: Closed | Completion date: March 17, 2016 | Permit id: 2016-136867-000 | |||||
F5 or remodel operating rooms 11,14 and 15 - selective demo of walls, casework, ceilings and flooring, med gas piping, install equipment and interior finish upgrades to include walls, ceilings, casework, structural for equipment mounting, new med gas piping, plbg, elec Date: March 30, 2016Permit type: Reviews | Permit status: Approved | Completion date: March 30, 2016 | Permit id: 2016-142667-000 | |||||
Power - or remodel operating rooms 11,14 and 15 - selective demo of walls, casework, ceilings and flooring, med gas piping, install equipment and interior finish upgrades to include walls, ceilings, casework, structural for equipment mounting, new med gas piping, plbg, elec Permit type: Intake | Permit status: Closed | Completion date: April 7, 2016 | Permit id: 2016-147683-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Application | Permit status: Approved | Completion date: April 8, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Application | Permit status: Closed | Completion date: April 8, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Issuance/intake | Permit status: Intake | Completion date: April 8, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Process management | Permit status: Closed | Completion date: April 14, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Planning and zoning | Permit status: Not reqd | Completion date: April 8, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Erosion control | Permit status: Approved | Completion date: April 20, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Site development | Permit status: Approved | Completion date: April 20, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Life safety | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: April 14, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Transportation | Permit status: Approved | Completion date: April 14, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Transportation | Permit status: Not reqd | Completion date: April 17, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Water bureau review | Permit status: Not reqd | Completion date: April 23, 2016 | Permit id: 2016-148717-000 | |||||
Install new 22 generator pad to replace two generators that will be removed from adjacent location as part of a future project Permit type: Parks bureau | Permit status: Approved | Completion date: April 20, 2016 | Permit id: 2016-148717-000 | |||||
Fuel oil piping to generators associated with 16-148717-co. New system to generator. New pump to existing fos r. Permit type: Intake | Permit status: Closed | Completion date: April 8, 2016 | Permit id: 2016-148750-000 | |||||
Fuel oil piping to generators associated with 16-148717-co. New system to generator. New pump to existing fos r. Permit type: Mechanical review | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2016-148750-000 | |||||
Fuel oil piping to generators associated with 16-148717-co. New system to generator. New pump to existing fos r. Permit type: Fire bureau | Permit status: Approved | Completion date: April 13, 2016 | Permit id: 2016-148750-000 | |||||
Unit 15- alterations to the fire alarm system as needed for t. I.- 49 devices total 41- smoke detectors, 1- strobe, 7- s s Date: April 21, 2016Permit type: Intake | Permit status: Closed | Completion date: April 21, 2016 | Permit id: 2016-157136-000 | |||||
Create 1-hr rated connection to existing rated corriday, intall lighting, connect new mechanical, connect it cabling from new tunnel under childrens hospital tower (see permit 08-180618 rev 02 mg) Permit type: Application | Permit status: Closed | Completion date: January 28, 2010 | Permit id: 2009-166658-000 | |||||
Connect mechanical piping and it cable from new tunnel under childrens hospital (see permit 08-180618 rev 02 mg) Permit type: Application | Permit status: Closed | Completion date: January 28, 2010 | Permit id: 2009-166661-000 | |||||
Connect mechanical piping and it cable from new tunnel under childrens hospital (see permit 08-180618 rev 02 mg) Permit type: Application | Permit status: Approved | Completion date: October 26, 2009 | Permit id: 2009-166661-000 | |||||
Connect mechanical piping and it cable from new tunnel under childrens hospital (see permit 08-180618 rev 02 mg) Permit type: Issuance/intake | Permit status: Intake | Completion date: October 26, 2009 | Permit id: 2009-166661-000 | |||||
F6 revision to clarify reduction in the scope of work. A portion was completed under another project, see permit # 11-204325-fa. Date: September 4, 2014Permit type: Intake | Permit status: Closed | Completion date: August 26, 2014 | Permit id: 2011-164728-Rev | |||||
F12 basement - remove & replace water cooled fan coil unit serving flywheel ups-mdf. Date: August 1, 2013Permit type: Intake | Permit status: Closed | Completion date: June 21, 2013 | Permit id: 2013-171092-000 | |||||
F12 basement - this dfs-01 is for mdf ups and flywheel equipment seismic structural engineering anchorage. Date: August 6, 2014Permit type: Intake | Permit status: Closed | Completion date: September 26, 2013 | Permit id: 2013-171092-Dfs | |||||
F13 replace existing ahu units with new, ducting, etc Date: March 18, 2014Permit type: Intake | Permit status: Closed | Completion date: February 21, 2014 | Permit id: 2014-119688-000 | |||||
B1 level 3 randall pediatric procedure - dfs-01 for suspended act ceiling system Date: February 5, 2015Permit type: Intake | Permit status: Closed | Completion date: January 30, 2015 | Permit id: 2014-156268-Dfs | |||||
Fire alarm upgrades- 34 devices total- 26 smoke detectors, 4 strobes, 4 h s. Date: July 1, 2014Permit type: Intake | Permit status: Closed | Completion date: July 1, 2014 | Permit id: 2014-177964-000 | |||||
Street tree removal replant permit Date: January 6, 2016Permit type: D - permit request | Permit status: Permit issued | Completion date: January 6, 2016 | Permit id: 2014-253390-000 | |||||
B1 leh ww or humidifier refurbish project; replace 14 existing duct mounted humidification assemblies and assoc. Prv Date: January 16, 2015Permit type: Intake | Permit status: Closed | Completion date: January 8, 2015 | Permit id: 2015-102658-000 | |||||
F11 lower level lorenzen conference room toilet room remodel Date: May 13, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 13, 2015 | Permit id: 2015-170133-000 | |||||
B1 lower level lorenzen conference room toilet room remodel Date: May 20, 2015Permit type: Intake | Permit status: Closed | Completion date: May 13, 2015 | Permit id: 2015-170140-000 | |||||
Plumbing renovation at legacy emanual medical center lorenzen confrence roomr r 4 wc, 4 lav, 2 urinals Date: May 19, 2015Permit type: Intake | Permit status: Closed | Completion date: May 19, 2015 | Permit id: 2015-172993-000 | |||||
B1 unit 54 restroom reconfiguration from 1 restroom to 1 public restroom and 1 medical staff restroom Date: June 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 18, 2015 | Permit id: 2015-188315-000 | |||||
B1 unit 54 restroom reconfiguration - revise location of shower Date: July 7, 2015Permit type: Intake | Permit status: Closed | Completion date: July 1, 2015 | Permit id: 2015-188317-Rev | |||||
B1 unit 54 - hvac for ti Date: July 8, 2015Permit type: Intake | Permit status: Closed | Completion date: June 30, 2015 | Permit id: 2015-194453-000 | |||||
Addition and remodel of emergency department for legacy emanuel hospital Date: July 12, 2000Client: Northeast Coalition Of Neighbors | Permit type: Addition | Permit status: Final | Completion date: May 2, 2001 | Current use: Institutional | Permit id: 2000-138926-000 | |||||
Pedestrian path additions to complete pedestrian circulation on campus and interior parking lot landscaping upgrades. Date: October 21, 2011Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: March 12, 2012 | Current use: Storage | Permit id: 2011-155441-000 | |||||
Interior alteration at 3rd floor of lech tower to accommodate outpatient clinics Date: April 20, 2011Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: May 9, 2012 | Current use: Institutional | Permit id: 2011-100308-000 | |||||
Install two new 2-megawatt diesel generators in weather proof enclosures and 35,0 gallon above ground diesel fuel tank and associated concrete pads and foundations. These generators will replace two existing generators(located elsewhere on campus) that will be decommissioned as part of a future project. Locate new concrete pad for weatherproof switchgear enclosure. Weatherproof switchgear enclosure is a deferred submital Date: July 8, 2016Client: Northeast Coalition Of Neighbors | Permit type: New construction | Permit status: Under inspection | Current use: Utility | Permit id: 2016-148717-000 | |||||
Emergency department addition core and shell (to accommodate new childrens hospital tower) separate permit required for mechanical Date: September 28, 2010Client: Northeast Coalition Of Neighbors | Permit type: Addition | Permit status: Final | Completion date: February 17, 2012 | Current use: Institutional | Permit id: 2009-151787-000 | |||||
Install new trailer (hyperbaric chamber) at north side of burn center wing; new oxygen storage tank, new fencing, and modify sidewalks and curb cut; Date: May 9, 2016Client: Northeast Coalition Of Neighbors | Permit type: New construction | Permit status: Final | Completion date: July 19, 2016 | Current use: Business | Permit id: 2016-119833-000 |