ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Emergency repair to include melting bearings for repair to handi-capped elevator drum machine (application address: 2 friend street) bfd paid detail required Date: April 19, 2011Permit type: Bfd cutting-burning-welding | Permit id: Cbw72957 | |||||
Installation in accordance with nfpa 13 and 7 cmr. Only one floor shall be impaired at any given time. Date: May 19, 2014Permit type: Bfd sprinkler system | Permit id: Sprk355373 | |||||
Removing one existing sprinkler head in elevator shaft per elevator inspectors request work being done at 2 friend street. Work to be done per nfpa stands. One floor zone at a time. Date: July 7, 2011Permit type: Bfd sprinkler system | Permit id: Sprk84277 | |||||
Holiday inn express -add one new sprinkler head in the elevator lobby of floors 2 3 4 and 5 for a total of 4 heads. Work to be done one floor zone at a time. Building fire watch required on floor if floor occupied during impairment. Fire alarm system to remain in full operation . Date: October 1, 2012Permit type: Bfd sprinkler system | Permit id: Sprk187111 | |||||
Add (1) new sprinkler head in the basement. Work to be done per nfpa stands. One floor zone at a time. Date: January 30, 2012Permit type: Bfd sprinkler system | Permit id: Sprk115244 | |||||
Emergency repair to include melting bearings for repair to handi-capped elevator drum machine (application address: 2 friend street) bfd paid detail required Date: April 19, 2011Permit type: Bfd cutting-burning-welding | Permit id: Cbw72957 | |||||
Installation in accordance with nfpa 13 and 7 cmr. Only one floor shall be impaired at any given time. Date: May 19, 2014Permit type: Bfd sprinkler system | Permit id: Sprk355373 | |||||
Removing one existing sprinkler head in elevator shaft per elevator inspectors request work being done at 2 friend street. Work to be done per nfpa stands. One floor zone at a time. Date: July 7, 2011Permit type: Bfd sprinkler system | Permit id: Sprk84277 | |||||
Holiday inn express -add one new sprinkler head in the elevator lobby of floors 2 3 4 and 5 for a total of 4 heads. Work to be done one floor zone at a time. Building fire watch required on floor if floor occupied during impairment. Fire alarm system to remain in full operation . Date: October 1, 2012Permit type: Bfd sprinkler system | Permit id: Sprk187111 | |||||
Add (1) new sprinkler head in the basement. Work to be done per nfpa stands. One floor zone at a time. Date: January 30, 2012Permit type: Bfd sprinkler system | Permit id: Sprk115244 |