ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Suite #880/890- alterations to the fire sprinkler system as needed for t. I.- 3 heads total Date: November 19, 2014Permit type: Intake | Permit status: Closed | Completion date: November 19, 2014 | Permit id: 2014-239909-000 | |||||
Suite #410- alterations to the fire sprinkler system as needed for t. I.- 3 heads total Date: November 19, 2014Permit type: Intake | Permit status: Closed | Completion date: November 19, 2014 | Permit id: 2014-239912-000 | |||||
4th floor #4 kaiser - voice/data Date: January 21, 2015Permit type: Intake | Permit status: Closed | Completion date: January 21, 2015 | Permit id: 2015-107766-000 | |||||
B1/ suite 7 daimler trucks add new offices Date: February 12, 2015Permit type: Reviews | Permit status: Approved | Completion date: February 12, 2015 | Permit id: 2015-118782-000 | |||||
B1/ suite 7 daimler trucks add new offices - relocate grilles and returns Date: February 23, 2015Permit type: Intake | Permit status: Closed | Completion date: February 12, 2015 | Permit id: 2015-118803-000 | |||||
#7 daimler new offices - power Date: February 12, 2015Permit type: Intake | Permit status: Closed | Completion date: February 12, 2015 | Permit id: 2015-119110-000 | |||||
Kpns lan - pull 153 cat5e cables in suite #150, 14 cables in #160, & cables in #490 Date: March 3, 2015Permit type: Reviews | Permit status: Approved | Completion date: March 3, 2015 | Permit id: 2015-127464-000 | |||||
Kpns lan - pull 153 cat5e cables in suite #150, 14 cables in #160, & cables in #4 - data Date: March 3, 2015Permit type: Intake | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2015-127467-000 | |||||
Private property tree removal permit Date: March 17, 2015Permit type: A - research | Permit status: Title 11 permit with cond | Completion date: March 12, 2015 | Permit id: 2015-131511-000 | |||||
#7 daimler new offices - voice/data & security cabling (security added 3/30/15) Date: March 13, 2015Permit type: Intake | Permit status: Closed | Completion date: March 13, 2015 | Permit id: 2015-133076-000 | |||||
#7 daimler new offices - furniture power connections & voice/data raceways (furniture power connections added to permit on 4/9/15) Date: March 13, 2015Permit type: Intake | Permit status: Closed | Completion date: March 13, 2015 | Permit id: 2015-133120-000 | |||||
#7 daimler new offices - access control Date: March 13, 2015Permit type: Intake | Permit status: Closed | Completion date: March 13, 2015 | Permit id: 2015-133127-000 | |||||
Plumbing renovation at montgomery park suite 7 for daimler tir&r sink Date: March 24, 2015Permit type: Intake | Permit status: Closed | Completion date: March 24, 2015 | Permit id: 2015-138932-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Application | Permit status: Approved | Completion date: March 31, 2015 | Permit id: 2015-142678-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Issuance/intake | Permit status: Intake | Completion date: March 31, 2015 | Permit id: 2015-142678-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Addressing | Permit status: Not reqd | Completion date: April 1, 2015 | Permit id: 2015-142678-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Planning and zoning | Permit status: Approved | Completion date: April 27, 2015 | Permit id: 2015-142678-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Erosion control | Permit status: Not reqd | Completion date: March 31, 2015 | Permit id: 2015-142678-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Site development | Permit status: Approved | Completion date: May 1, 2015 | Permit id: 2015-142678-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Life safety | Permit status: Approved | Completion date: March 31, 2015 | Permit id: 2015-142678-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Life safety | Permit status: Not reqd | Completion date: March 31, 2015 | Permit id: 2015-142678-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Structural | Permit status: Required | Completion date: April 23, 2015 | Permit id: 2015-142678-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Fire bureau | Permit status: Approved | Completion date: April 15, 2015 | Permit id: 2015-142678-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Environmental services | Permit status: Approved | Completion date: April 22, 2015 | Permit id: 2015-142678-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Transportation | Permit status: Not reqd | Completion date: April 1, 2015 | Permit id: 2015-142678-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Transportation | Permit status: Approved | Completion date: April 27, 2015 | Permit id: 2015-142678-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Water bureau review | Permit status: Not reqd | Completion date: April 1, 2015 | Permit id: 2015-142678-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Permit type: Water bureau review | Permit status: Not reqd | Completion date: April 9, 2015 | Permit id: 2015-142678-000 | |||||
Programmatic permit application Permit type: A - research | Permit status: Title 11 permit required | Completion date: April 20, 2015 | Permit id: 2015-152843-000 | |||||
Vfds drives & controls for 75 hvac units Date: May 15, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 15, 2015 | Permit id: 2015-171206-000 | |||||
Vfds drives & controls for 75 hvac units - power/low voltage Date: May 15, 2015Permit type: Intake | Permit status: Closed | Completion date: May 15, 2015 | Permit id: 2015-171215-000 | |||||
East garage lighting controls Date: May 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 18, 2015 | Permit id: 2015-172073-000 | |||||
East garage lighting controls - power Date: May 18, 2015Permit type: Intake | Permit status: Closed | Completion date: May 18, 2015 | Permit id: 2015-172078-000 | |||||
603616 web md suite #6 install low voltage voice and data cabling. Date: January 10, 2012Permit type: Electrical inspections | Permit status: Approved | Completion date: November 5, 2014 | Permit id: 2012-102417-000 | |||||
Install battery backup equipment in penthouse (conditioned space) on roof Date: August 2, 2013Permit type: Application | Permit status: Approved | Completion date: April 18, 2013 | Permit id: 2013-141007-000 | |||||
B1/ suite 323 bill naito office relocation, add walls for 5 private offices Date: October 23, 2013Permit type: Intake | Permit status: Closed | Completion date: October 21, 2013 | Permit id: 2013-219062-000 | |||||
Add 3 new panel antennas and rru units. Install radio equipment inside existing cabinets on rooftop Date: February 5, 2015Permit type: Application | Permit status: Approved | Completion date: April 9, 2014 | Permit id: 2014-138044-000 | |||||
Historic resource review for addition of three panel antennas andthre rrus and associated equipment to existing rooftop facility. Date: June 11, 2014Permit type: Land use review | Permit status: Completed | Completion date: April 11, 2014 | Permit id: 2014-138147-000 | |||||
Add 5 dry manual standpipes in existing stairs,decomission old outside standpipes on fire escapes. Date: April 16, 2014Permit type: Intake | Permit status: Closed | Completion date: April 16, 2014 | Permit id: 2014-142659-000 | |||||
Suite #290- alteration to fire alarm for t. I.- 1 device Date: June 6, 2014Permit type: Intake | Permit status: Closed | Completion date: June 6, 2014 | Permit id: 2014-166298-000 | |||||
#2 esco - fire alarm wiring Date: July 6, 2014Permit type: Intake | Permit status: Closed | Completion date: July 6, 2014 | Permit id: 2014-179535-000 | |||||
7-21-14 noise complaint - leaf blower Permit type: Request | Permit status: Closed | Completion date: July 21, 2014 | Permit id: 2014-187141-000 | |||||
B1/ suite 455 office demo and expansion add 4 new private offices Date: August 14, 2014Permit type: Reviews | Permit status: Approved | Completion date: August 14, 2014 | Permit id: 2014-198357-000 | |||||
#455 mainz brady ti - power Date: August 14, 2014Permit type: Intake | Permit status: Closed | Completion date: August 14, 2014 | Permit id: 2014-198675-000 | |||||
Suite #455- alteration to fire sprinklers as needed for t. I.- 3 heads total Date: August 15, 2014Permit type: Intake | Permit status: Closed | Completion date: August 15, 2014 | Permit id: 2014-199498-000 | |||||
F10/ 8th floor/ minor remodel of break room and removal of wall in hallway Date: October 14, 2014Permit type: Reviews | Permit status: Approved | Completion date: October 14, 2014 | Permit id: 2014-225560-000 | |||||
F10/ 8th floor/ suites 880-890; minor remodel of break room and removal of wall in hallway Date: October 29, 2014Permit type: Intake | Permit status: Closed | Completion date: October 14, 2014 | Permit id: 2014-225568-000 | |||||
F7/ suite 410/420; remodel, remove partial wall and door, open up hallway pass through, patch and paint, ceiling, elec Date: October 20, 2014Permit type: Reviews | Permit status: Approved | Completion date: October 20, 2014 | Permit id: 2014-228019-000 | |||||
#880/ kaiser ti - power Date: November 19, 2014Permit type: Intake | Permit status: Closed | Completion date: October 21, 2014 | Permit id: 2014-228084-000 | |||||
#410/4 kaiser remodel - power Date: November 18, 2014Permit type: Intake | Permit status: Closed | Completion date: October 23, 2014 | Permit id: 2014-229373-000 | |||||
Approval of the following at the historic montgomery ward & company building located in the northwest district neighborhood: replace six of the nine existing wireless panel antennas add two new wireless panel antennas (for an end total of eleven (11) wireless panel antennas) add five remote radio units (rrus) add four dc surge suppressors: 2 of these are proposed to be located inside the existing verizon equipment shelter in the existing penthouse. Add twelve diplexers:o 6 within the structural supports of the rooftop lettering, similar to the previously mentioned rf equipmento 6 are proposed to be located inside the existing verizon equipment shelter in the existing penthouse. Approval per the approved plans and drawings, exhibits c-1 through c-9, signed and dated march 10, 2015, subject to the following condition:a. As part of the building permit application submittal, the following development-related conditions (b through c) must be noted on each of the 4 required site plans or i Date: March 11, 2015Permit type: Land use review | Permit status: Completed | Completion date: October 29, 2014 | Permit id: 2014-230793-000 | |||||
Fiber & copper backbone from lower level kaise btr to suites on the 4th & 8th floors / install switches in the closets Date: October 30, 2014Permit type: Reviews | Permit status: Approved | Completion date: October 30, 2014 | Permit id: 2014-232130-000 | |||||
Fiber & copper backbone from lower level kaiser btr to suites on the 4th & 8th floors / install switches in the closets Date: October 30, 2014Permit type: Intake | Permit status: Closed | Completion date: October 30, 2014 | Permit id: 2014-232146-000 | |||||
Plumbing renovation in montgomery park for kaiser permanente t. I. Replace existing break sink. Date: March 17, 2015Permit type: Intake | Permit status: Closed | Completion date: November 3, 2014 | Permit id: 2014-233248-000 | |||||
1st floor mechanical rooms- addition of smoke detectors and fire alarm relays for fsds. 2- smoke detectors total Date: August 12, 2015Permit type: Intake | Permit status: Closed | Completion date: August 12, 2015 | Permit id: 2015-217050-000 | |||||
Project for fire alarm upgrades as per elevator upgrades Date: August 12, 2015Permit type: Reviews | Permit status: Approved | Completion date: August 12, 2015 | Permit id: 2015-217061-000 | |||||
Elevator machine rooms- alteration to the fire alarm as needed for elevator upgrades- 6 devices 1- smoke detector, 1- heat detector, 4- relays for elevator functions- (primary, secondary, shunt, fire hat) Date: August 12, 2015Permit type: Intake | Permit status: Closed | Completion date: August 12, 2015 | Permit id: 2015-217062-000 | |||||
F1/ kaiser permanente suites 140/ 1 - removal and addition of partition walls, electrical, furniture, carpet, finishes Date: September 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 18, 2015 | Permit id: 2015-239013-000 | |||||
9th fl daimler 51 wireless access points Date: September 21, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 21, 2015 | Permit id: 2015-239201-000 | |||||
9th fl daimler 51 wireless access points - voice/data Date: September 21, 2015Permit type: Intake | Permit status: Closed | Completion date: September 21, 2015 | Permit id: 2015-239203-000 | |||||
Zoning confirmation Permit type: Land use review | Permit status: Closed | Completion date: September 25, 2015 | Permit id: 2015-242471-000 | |||||
Zoning confirmation Permit type: Land use review | Permit status: Letter sent | Completion date: October 5, 2015 | Permit id: 2015-242471-000 | |||||
#140/ 1 kaiser permanente suites - power Date: October 26, 2015Permit type: Intake | Permit status: Closed | Completion date: October 9, 2015 | Permit id: 2015-249013-000 | |||||
#140/ 1 kaiser permanente suites - voice/datainstall (26) 2d locations Date: October 15, 2015Permit type: Intake | Permit status: Closed | Completion date: October 15, 2015 | Permit id: 2015-251567-000 | |||||
B1/kaiser mpo suite 140/1 - install new vav in conference room Date: November 17, 2015Permit type: Intake | Permit status: Closed | Completion date: October 30, 2015 | Permit id: 2015-258418-000 | |||||
Suite #160- alteration to the fire sprinklers as needed for t. I.- 2 heads total Date: October 30, 2015Permit type: Intake | Permit status: Closed | Completion date: October 30, 2015 | Permit id: 2015-258742-000 | |||||
Approval of installation of photovoltaic panels on the montgomery ward warehouse building, a historic landmark, where the panels are not visible from the ground nearby or in the surrounding area. This approval is per the approved site plans, exhibits c-1 through c-4, signed and dated march 31, 2016 and subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 4. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 16-110994 hr . No field changes allowed. B. The array proposed on the atrium shall be removed from the proposal. Date: April 11, 2016Permit type: Land use review | Permit status: Completed | Completion date: January 28, 2016 | Permit id: 2016-110994-000 | |||||
Install 424. 1 kw solar pv project (roof mounted) Date: February 24, 2016Permit type: Intake | Permit status: Closed | Completion date: February 3, 2016 | Permit id: 2016-115596-000 | |||||
F6/full sail office expansion suite 469 t. I. - minor demo of doors & wall, install walls for open offices and offices, reception, conference, phone booths, relites, finishes, ceilings, flooring, elec Date: February 4, 2016Permit type: Reviews | Permit status: Approved | Completion date: February 4, 2016 | Permit id: 2016-116713-000 | |||||
#469 full sail expansion - power Date: February 5, 2016Permit type: Intake | Permit status: Closed | Completion date: February 4, 2016 | Permit id: 2016-116772-000 | |||||
Suite #469- alteration to the fire sprinklers as needed for t. I.- 4 heads total Date: February 10, 2016Permit type: Intake | Permit status: Closed | Completion date: February 10, 2016 | Permit id: 2016-119650-000 | |||||
Wells fargo staynpower Date: March 25, 2016Permit type: Reviews | Permit status: Approved | Completion date: March 25, 2016 | Permit id: 2016-140804-000 | |||||
Wells fargo staynpower ups - power Date: March 25, 2016Permit type: Intake | Permit status: Closed | Completion date: March 25, 2016 | Permit id: 2016-140811-000 | |||||
Onpoint fiber 1-8 Date: April 11, 2016Permit type: Reviews | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2016-149435-000 | |||||
8th fl onpoint fiber 1st-8th fl Date: April 11, 2016Permit type: Intake | Permit status: Closed | Completion date: April 11, 2016 | Permit id: 2016-149440-000 | |||||
5th fl server relocation - voice/datapr# mp290-wfserver 2012 Date: November 6, 2012Permit type: Intake | Permit status: Closed | Completion date: November 6, 2012 | Permit id: 2012-202541-000 | |||||
Install controls for heat pump on 2nd floor server room. Check ivr# 3253778& 2012-214889-000-00-fa Date: January 16, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: December 18, 2015 | Permit id: 2013-105536-000 | |||||
Data workthis permit is replaced by facilities permit program permit # 13-227722 fa Date: October 31, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: August 24, 2015 | Permit id: 2013-223415-000 | |||||
7-21-14 noise complaint - leaf blower Permit type: Request | Permit status: Closed | Completion date: July 10, 2015 | Permit id: 2014-187141-000 | |||||
7-21-14 noise complaint - leaf blower Permit type: Request | Permit status: Closed | Completion date: July 21, 2014 | Permit id: 2014-187141-000 | |||||
7-21-14 noise complaint - leaf blower Permit type: Request | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2014-187141-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside sheltersee lu 14-230793 Date: September 18, 2015Permit type: Application | Permit status: Approved | Completion date: March 31, 2015 | Permit id: 2015-142678-000 | |||||
Programmatic permit application Date: November 16, 2015Permit type: A - research | Permit status: Title 11 permit required | Completion date: April 20, 2015 | Permit id: 2015-152843-000 | |||||
Zoning confirmation letter Permit type: Land use review | Permit status: Closed | Completion date: July 8, 2015 | Permit id: 2015-197989-000 | |||||
Zoning confirmation letter Permit type: Land use review | Permit status: Letter sent | Completion date: August 3, 2015 | Permit id: 2015-197989-000 | |||||
F1 kaiser permanente suites 140 1 - removal and addition of partition walls, electrical, furniture, carpet, finishes Date: September 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 18, 2015 | Permit id: 2015-239013-000 | |||||
9th fl daimler 51 wireless access points - voice data Date: September 21, 2015Permit type: Intake | Permit status: Closed | Completion date: September 21, 2015 | Permit id: 2015-239203-000 | |||||
Zoning confirmation Permit type: Land use review | Permit status: Closed | Completion date: September 25, 2015 | Permit id: 2015-242471-000 | |||||
Zoning confirmation Permit type: Land use review | Permit status: Letter sent | Completion date: October 5, 2015 | Permit id: 2015-242471-000 | |||||
#140 1 kaiser permanente suites - power Date: October 26, 2015Permit type: Intake | Permit status: Closed | Completion date: October 9, 2015 | Permit id: 2015-249013-000 | |||||
#140 1 kaiser permanente suites - voice datainstall (26) 2d locations Date: October 15, 2015Permit type: Intake | Permit status: Closed | Completion date: October 15, 2015 | Permit id: 2015-251567-000 | |||||
B1 kaiser mpo suite 140 1 - install new vav in conference room Date: November 17, 2015Permit type: Intake | Permit status: Closed | Completion date: October 30, 2015 | Permit id: 2015-258418-000 | |||||
F6 full sail office expansion suite 469 t. I. - minor demo of doors & wall, install walls for open offices and offices, reception, conference, phone booths, relites, finishes, ceilings, flooring, elec Date: February 4, 2016Permit type: Reviews | Permit status: Approved | Completion date: February 4, 2016 | Permit id: 2016-116713-000 | |||||
5th fl server relocation - voice datapr# mp290-wfserver 2012 Date: November 6, 2012Permit type: Intake | Permit status: Closed | Completion date: November 6, 2012 | Permit id: 2012-202541-000 | |||||
7-21-14 noise complaint - leaf blower Permit type: Request | Permit status: Closed | Completion date: July 10, 2015 | Permit id: 2014-187141-000 | |||||
7-21-14 noise complaint - leaf blower Permit type: Request | Permit status: Closed | Completion date: July 21, 2014 | Permit id: 2014-187141-000 | |||||
7-21-14 noise complaint - leaf blower Permit type: Request | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2014-187141-000 | |||||
B1 suite 7 daimler trucks add new offices Date: February 23, 2015Permit type: Intake | Permit status: Closed | Completion date: February 12, 2015 | Permit id: 2015-118798-000 | |||||
B1 suite 7 daimler trucks add new offices - relocate grilles and returns Date: February 23, 2015Permit type: Intake | Permit status: Closed | Completion date: February 12, 2015 | Permit id: 2015-118803-000 | |||||
Vfds drives & controls for 75 hvac units - power low voltage Date: May 15, 2015Permit type: Intake | Permit status: Closed | Completion date: May 15, 2015 | Permit id: 2015-171215-000 | |||||
Zoning confirmation letter Permit type: Land use review | Permit status: Closed | Completion date: July 8, 2015 | Permit id: 2015-197989-000 | |||||
Zoning confirmation letter Permit type: Land use review | Permit status: Letter sent | Completion date: August 3, 2015 | Permit id: 2015-197989-000 | |||||
Ti- int. Walls Date: January 20, 2000Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: February 11, 2000 | Current use: Business | Permit id: 2000-125680-000 | |||||
Ti 4th floor to create new office spaces Date: July 10, 2000Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: July 28, 2000 | Current use: Business | Permit id: 2000-160184-000 | |||||
3rd floor remodel within existing tenant space of freightliner. Create 2 new office spaces. To provide front approach at sink in lunch room. Maintain sprinkler and detection coverage. Separte permit reqd from fmo. Separate mechanical permit required Date: August 16, 2000Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: November 22, 2000 | Current use: Business | Permit id: 2000-165973-000 | |||||
Removing 3 omni-whips and replace w 12 panel antennas Date: June 30, 2005Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: July 29, 2005 | Current use: Utility | Permit id: 2005-109258-000 | |||||
Add 3 antennas to three existing arrays Date: April 14, 2005Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: April 25, 2005 | Current use: Business | Permit id: 2005-108085-000 | |||||
Replace three antennas and add three additional antennas to roof top cell facility, add 1 cabinet to existing equipment room Date: April 19, 2006Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 5, 2006 | Current use: Business | Permit id: 2005-173911-000 | |||||
Cell site - install 6 panel antennas and 4 microwave dishes on exist building, rooftop equiment mounted on roof Date: March 30, 2009Client: Neighbors West Northwest | Permit type: Addition | Permit status: Final | Completion date: May 13, 2009 | Current use: Utility | Permit id: 2009-106431-000 | |||||
Pedestrian walkways and ramp, bicycle parking - to satisfy a portion of nonconforming upgrades option 2 for permit 05-100308 dfs 01 fa - the remainder of the upgrades are under permit 09-135959-co Date: June 24, 2009Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: February 4, 2010 | Current use: Business | Permit id: 2009-112290-000 | |||||
Remove portion of parking lot paving and replace with landscaping; restripe portion of parking lot; interior landscaping - to satisfy the remiainder of nonconforming upgrades option 2 for permit 05-100308 dfs 01 fa - the remainder of the upgrades are under permit 09-112290-co Date: September 14, 2009Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: February 8, 2010 | Current use: Business | Permit id: 2009-135959-000 | |||||
Replace three antennas on rooftop sign structure; add three rrh units and surge protectors Date: November 2, 2011Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: March 21, 2014 | Current use: Utility | Permit id: 2011-173462-000 | |||||
Modifications to existing wireless facility - replace 6 existing antennas with 3 new, replace 2 cabinets with 2 new Date: December 5, 2013Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: March 21, 2014 | Current use: Utility | Permit id: 2013-128228-000 | |||||
Alteration-replace (6) of the (9) existing wireless panel antennas and add (2) new wireless panel antennas (for an end total of (11) wireless panel antennas add (5) new rrus add (4) new dc surge suppressors (2) of which are inside existing verizon equipment shelter & (12) new diplexers (6) are inside shelter see lu 14-230793 Date: September 18, 2015Client: Neighbors West Northwest | Permit type: Addition | Permit status: Final | Completion date: February 16, 2016 | Current use: Utility | Permit id: 2015-142678-000 | |||||
424. 1 kw roof mounted pv array. See 16-115596 et for electrical permit. Date: September 15, 2016Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: January 4, 2017 | Current use: Business | Permit id: 2016-216342-000 | |||||
Remove all existing equipment and antenna from the existing building sign super structure and installing 8 new antenna and 12 new rrhs and 3 dc surge protectors Client: Neighbors West Northwest | Permit type: Addition | Permit status: Under review | Current use: Utility | Permit id: 2016-180551-000 | |||||
Solar installation - construct 229. 1kw solar panel array structure at top of parking garage building Date: December 22, 2016Client: Neighbors West Northwest | Permit type: Addition | Permit status: Under inspection | Current use: Storage | Permit id: 2016-256158-000 |