ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Expansion of central utility plan currently serving the st. Elizabeths campus. Building will be two below grade stories and one partial ground floor level with green roof. Facility will include generators, power and cooling equipment. The building will not be occupied. Paved area will be all green pavers. Swmp no. 5491 Date: May 3, 2017Client: United States Of America | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1700114 | |||||
SCORE 56 Using hollow stem auger method, we will drill three 6 inch test borings in the proposed building area. Selected test borings will be converted to temporary water observation wells to obtain longer-term groundwater levels. Proposed test borings depth range from to 1 feet. All the spoils will be containerized in 55-gallon drums and sent for disposal upon review of chemical results. The bore holes will be grouted with a 60: ratio of bentonite powder to cement for paved area, and grouted with 2 pounds of bentonite powder to 1 gallon of water for the borings that are located in non-paved areas. Date: January 18, 2017Client: United Satates Of America | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700086 |